Environmental Management Plan for Proposed Borrow Pits, Intsika Yethu, Sakhisizwe & Engcobo Local Municipalities, Eastern Cape
Submitted in terms of Section 39 and of Regulation 52 of the Mineral and Petroleum Resources Development Act, 2002 (Act 28 of 2002)
Report Prepared by:
Engineering Advice & Services (Pty) Ltd
EAS Project Number: 1105 (Volume 1)
DMR Contract Number:
Report Prepared for:
Eastern Cape Department of Roads and Public Works
22 August 2014
Proposed Borrow Pits Engcobo Local Municipalities, Eastern Cape
For: Eastern Cape Department of Roads and Public Works
Private Bag X0022, Bhisho, 5605
By: Engineering Advice & Services (Pty) Ltd.
73 Heugh Road, Walmer, Port Elizabeth
6013
Tel: +27 (0) 41 581 2421
Fax: +27 (0) 86 683 9899
EAS Project Number: 1105 (Volume 1)
DMR Contract Number:
22 August 2014
Compiled by:
Name |
Company |
|
Mr Jamie Pote |
Engineering Advice & Services (Biophysical and EMP) |
|
Mr Dieter Bester |
Engineering Advice & Services (Geotech and Engineering) |
|
Mr Mark Rynhoud |
Engineering Advice & Services (Geology) |
|
Mr Ray Parker |
Engineering Advice & Services (Engineering and Review) |
The Eastern Cape Department of Roads and Public works (DRPW) require material for general maintenance of provincial roads, in particular gravel roads. There are numerous existing borrow pits (BP’s) hat have been historically used to maintain these roads, however these are not formally registered with the Department of Mineral Resources (DMR).
EAS was appointed as the independent consultants to assess the environmental impacts and requirements in terms of the Mineral and Petroleum Resources Development Act (MPRDA, Act 28 of 2002).
The specific roads in the Intsika Yethu, Sakhisizwe & Engcobo Local Municipal Areas are the DR08248, DR08247, DR08041 & DR 8504 roads, 15 borrow pits were selected subject to criteria including material type, location, access, surrounding land use, slope, erosion, hydrology and sensitive vegetation. Three sites were selected along the DR08248, 5 along the DR08247, 6 along the DR08041 & 1 along the DR 8504 roads. The borrow pits will be used exclusively for the upgrade/re-gravelling of the road they are situated adjacent to.
This report serves as an application for a mining right for these 15 borrow pits to the DMR and is prepared in accordance with the requirements of the MPRDA and DMR.
1.1 Legal and Administrative Requirements
1.2 NEMA principles of particular relevance to biodiversity:
1.3 Responsibilities of Role Players
1.3.4 Environmental Control Officer
1.3.5 Environmental Liaison Officer
1.6 Applicant and Consultant Details
2 Proposed Project Description
2.5 Description of the Existing Environment.
2.5.5 Hydrology (Ground and surface water)
2.5.1 Paleontological resources
2.5.2 Archaeological resources
2.5.5 Vegetation of Southern Africa
2.5.6 Eastern Cape Biodiversity Conservation Plan (ECBCP)
2.5.7 Implications of Regional Planning frameworks
2.5.8 Species of Special Concern occurring in the region
2.5.9 Social and economic environment
3 Individual Borrow Pit Assessments
3.11 Borrow Pit DR08247/Village
4 Summary of the potential impacts, significance assessment and the proposed mitigation measures
4.1 Assessment of the significance of the potential impacts
4.1.1 Criteria of assigning significance to potential impacts
4.2 Identification of potential impacts
4.2.1 Possible impacts on biodiversity during mining construction and operations
4.2.3 Concomitant list of appropriate technical or management options
4.2.4 Review the significance of the identified impacts
4.2.5 Listed activities (in terms of the NEMA EIA regulations)
4.2.6 Potential cumulative impacts
4.2.7 Potential impact on heritage resources
4.2.8 Potential impacts on communities, individuals or competing land uses in close proximity.
4.2.10 Confirmation of specialist report appended
5 Closure and environmental objectives
5.1 Monitoring and Performance
6.1 Undertaking to provide financial provision
7 REGULATION 52 (2) (h) Undertaking to execute the Environmental Management Plan
8 Record of the public participation and the results thereof
8.1 Identification of interested and affected parties
8.1.1 The details of the engagement process
8.1.5 Other concerns raised by the aforesaid parties
8.1.6 Confirmation that minutes and records of the consultations are appended
8.1.7 Information regarding objections received.
8.2 The manner in which the issues raised were addressed
9 Environmental awareness plan
9.1 Employee communication process
9.2 Description of solutions to risks
9.3 Environmental awareness training
10.1 Appendix A: Environmental Management Plan
10.1.2 Biodiversity Requirements
10.1.3 Historical, Archaeological and Paleontological Sites
10.1.7 Waste Management and Ablution Facilities.
10.1.8 Infrastructural Requirements
10.1.10 Monitoring and Reporting
10.1.12 Environmental Incidents
10.1.13 Closure objectives and their extent of alignment to the pre-mining environment
10.3 Environmental Management Programme (EMP) Contract between DRPW and Contractor
10.4 Method Statement Control Sheet
10.5 Appendix B: Detailed Impact Assessment
10.6 Appendix C: Potential Species List
10.8 Appendix E: Interested and Affected Party Correspondence
10.9 Appendix F: Borrow Pit Geological Test Results
Figure 1: Map indicating locality of borrow pits with major roads, towns, etc.
Figure 6: Land Use – excluding Natural Vegetation (SANBI Landcover, 2006).
Table 2: Details of Consultant
Table 3: Locality of proposed borrow pits.
Table 4: Summary of Biodiversity features for the Borrow Pit sites.
Table 5: Species of Special Concern known to occur in the vicinity of the sites.
Table 6: List of potential Impacts relating to the expansion of Borrow Pits
Table 7: List of activities having Moderate or higher Significance AFTER mitigation.
Table 8: Summary of potential impacts or heritage resources.
Table 9: Summary of potential impacts on communities
Table 11: Listed Activities associated with Borrow Pits
Table 13: Summary table (refer to letters in Appendices)
Table 14: Detailed Summary of overall Impact Assessment of all Borrow Pits
ASAPA |
Association of South African Professional Archaeologists |
BP |
Borrow Pit |
CARA |
Conservation of Agricultural Resources Act 43 of 1983 |
CBA |
Critical Biodiversity Area |
CRM |
Cultural Resource Management |
DEA |
Department of Environmental Affairs (National) |
DEDEAT |
Department of Economic Development, Environmental Affairs and Tourism |
DEMC |
Desired Ecological Management Class |
DMR |
Department of Mineral Resources |
DWA |
Department of Water Affairs |
DWAF |
Department of Water Affairs and Forestry (former department name) |
EA |
Environmental Authorisation |
ECO |
Environmental Control Officer |
EIA |
Environmental Impact Assessment |
EIR |
Environmental Impact Report |
EIS |
Ecological Importance and Sensitivity Classification |
EMC |
Ecological Management Class |
EMP |
Environmental Management Plan |
EMPr |
Environmental Management Programme report |
ER |
Environmental Representative |
ESS |
Ecosystem Services |
IAP’s |
Interested and Affected Parties |
IEM |
Integrated Environmental Management |
LHS |
Left Hand Side |
LM |
Local Municipality |
LoM |
Life of Mine |
masl |
meters above sea level |
MIA |
Mining Infrastructure Area |
MPRDA |
Mineral and Petroleum Resources Development Act 28 of 2002 |
NBA |
National Biodiversity Assessment |
NEMA |
National Environmental Management Act 107 of 1998 |
NEMBA |
National Environmental Management: Biodiversity Act 10 of 2004 |
NFA |
National Forest Act 84 of 1998 |
NOMR |
New Order Mining Right |
PEMC |
Present Ecological Management Class |
PES |
Present Ecological State |
RDL |
Red Data List |
RHS |
Right Hand Side |
RoD |
Record of Decision |
RoM |
Run of Mine |
SAHRA |
South African Heritage Resources Agency |
SANBI |
South African Biodiversity Institute |
SARTM |
South African Rural Traffic Model |
SDF |
Spatial Development Framework |
SoER |
State of the Environment Report |
SSC |
Species of Special Concern |
TOPS |
Threatened of Protected Species |
ToR |
Terms of Reference |
+ve |
Positive |
-ve |
Negative |
Corridors: |
Have important functions as strips of a particular type of landscape differing from adjacent land on both sides. Habitat, ecosystems or undeveloped areas that physically connect habitat patches. Smaller, intervening patches of surviving habitat can also serve as "stepping stones" that link fragmented ecosystems by ensuring that certain ecological processes are maintained within and between groups of habitat fragments. |
Degraded habitat/land |
Land that has been impacted upon by man’s activities (including introduction of invasive alien plants, light to moderate overgrazing, accelerated soil erosion, dumping of waste), but still retains a degree of its original structure and species composition (although some species loss would have occurred) and where ecological processes still occur (albeit in an altered way). Degraded land is capable of being restored to a near-natural state with appropriate ecological management. |
ECO/ESO: |
Environmental Site/Control Officer – person responsible for the Day-to-Day Environmental Management on-site during construction. |
Ecological Processes: |
Ecological processes typically only function well where natural vegetation remains, and in particular where the remaining vegetation is well-connected with other nearby patches of natural vegetation. Loss and fragmentation of natural habitat severely threatens the integrity of ecological processes. Where basic processes are intact, ecosystems are likely to recover more easily from disturbances or inappropriate actions if the actions themselves are not permanent. Conversely, the more interference there has been with basic processes, the greater the severity (and longevity) of effects. Natural processes are complex and interdependent, and it is not possible to predict all the consequences of loss of biodiversity or ecosystem integrity. When a region’s natural or historic level of diversity and integrity is maintained, higher levels of system productivity are supported in the long run and the overall effects of disturbances may be dampened |
Isisivane |
Isisivane consist of large piles of stones of different sizes and heights. They are usually near rivers and mountain crossings. Their purpose and meaning is not fully understood, however some are thought to represent burial cairns while others may have symbolic value |
Ecosystem status: |
Ecosystem status of terrestrial ecosystems is based on the degree of habitat loss that has occurred in each ecosystem, relative to two thresholds: one for maintaining healthy ecosystem functioning, and one for conserving the majority of species associated with the ecosystem. As natural habitat is lost in an ecosystem, its functioning is increasingly compromised, leading eventually to the collapse of the ecosystem and to loss of species associated with that ecosystem. |
Ecosystem: |
All of the organisms of a particular habitat, such as a lake or forest, together with the physical environment in which they live |
Endangered: |
Endangered terrestrial ecosystems have lost significant amounts (more than 60 % lost) of their original natural habitat, so their functioning is compromised. |
Endemic: |
A plant or animal species, or a vegetation type, which is naturally restricted to a particular defined region. It is often confused with indigenous, which means ‘native, occurring naturally in a defined area’. |
Environment: |
The external circumstances, conditions and objects that affect the existence and development of an individual, organism or group. These circumstances include biophysical, social, economic, historical and cultural aspects. |
Environmental Impact Assessment (EIA): |
A study of the environmental consequences of a proposed course of action |
Exotic: |
Non-indigenous; introduced from elsewhere, may also be a weed or alien invasive species. Exotic species may be invasive or non-invasive. |
Fragmentation (habitat): |
Causes land transformation, an important current process in landscapes as more and more development occurs. |
Habitat: |
The home of a plant or animal species. Generally those features of an area inhabited by animal or plant which are essential to its survival. |
Indigenous: |
Native; occurring naturally in a defined area. |
Least threatened terrestrial ecosystems: |
These ecosystems have lost only a small proportion (more than 80 % remains) of their original natural habitat, and are largely intact (although they may be degraded to varying degrees, for example by invasive alien species, overgrazing, or overharvesting from the wild). |
Method statement (construction): |
A method statement is prepared for each task on a particular site by the contractor; the group of work method statements are then packaged and included in the overall Construction Plan. |
Off-sets: |
Compensation for biodiversity loss resulting from authorized changes in land use. Can include assigning stewardship or protected area status to remaining conservation-worthy land or making a financial bequest for purposes of biodiversity conservation. |
Riparian: |
Pertaining to, situated on or associated with a river bank. |
River corridors: |
River corridors perform a number of ecological functions such as modulating stream flow, storing water, removing harmful materials from water, and providing habitat for aquatic and terrestrial plants and animals. These corridors also have vegetation and soil characteristics distinctly different from surrounding uplands and support higher levels of species diversity, species densities, and rates of biological productivity than most other landscape elements. Rivers provide for migration and exchange between inland and coastal biotas. |
Scoping |
A procedure to consult with stakeholders to determine issues and concerns and for determining the extent of and approach to the EIS, used to focus the EIA |
Scoping Report |
A written report describing the issues identified to date for inclusion in an EIA. |
Transformation: |
In ecology, transformation refers to adverse changes to biodiversity, typically habitats or ecosystems, through processes such as cultivation, forestry, drainage of wetlands, urban development or invasion by alien plants or animals. Transformation results in habitat fragmentation – the breaking up of a continuous habitat, ecosystem, or landuse type into smaller fragments. |
Transformed Habitat/Land |
Land that has been significantly impacted upon by man’s activities (Such as cultivation, urban development, mining, landscaping, severe overgrazing), and where the original structure, species composition and functioning of ecological processes have been irreversibly altered. Transformed habitats are not capable of being restored to their original states. |
Tributary/ Drainage line: |
A small stream or river flowing into a larger one. |
Untransformed habitat/land |
Land that has not been significantly impacted upon by man’s activities. These are ecosystems that are in a near-pristine condition in terms of structure, species composition and functioning of ecological processes. |
Vulnerable: |
Vulnerable terrestrial ecosystems have lost some (more than 60 % remains) of their original natural habitat, and their functioning will be compromised if they continue to lose natural habitat. |
Weed: |
An indigenous or non-indigenous plant that grows and reproduces aggressively, usually a ruderal pioneer of disturbed areas. Weeds may be unwanted because they are unsightly, or they limit the growth of other plants by blocking light or using up nutrients from the soil. They also can harbour and spread plant pathogens. |
Wetlands: |
A collective term used to describe lands that are sometimes or always covered by shallow water or have saturated soils, and where plants adapted for life in wet conditions usually grow. |
This Report has been prepared by Engineering Advice and Services, with all reasonable skill, care and diligence within the terms of the contract with the client, incorporating our standard terms and conditions of business and taking into account the resources devoted to it by agreement with the client. EAS disclaims any responsibility to the client and others in respect of any matters outside of the scope of the above. This report is exclusive to the client and the described project. EAS accepts no responsibility of whatsoever nature to third parties to whom this Background Information Document, or any part thereof, is made known. Any such persons or parties rely on the report at their own risk. |
Report Version |
Date |
Public Draft |
13 August 2014 |
Final Report |
|
The Eastern Cape Department of Roads and Public works (DRPW) require material for general maintenance of provincial roads, in particular gravel roads. There are numerous existing borrow pits (BP’s) hat have been historically used to maintain these roads, however these are not formally registered with the Department of Mineral Resources (DMR).
EAS was appointed as the independent consultants to assess the environmental impacts and requirements in terms of the Mineral and Petroleum Resources Development Act (MPRDA, Act 28 of 2002). This includes submitting an application for a mining right (this document), to the DMR, for the sourcing of material for re-gravelling of roads in the area from 15 existing unlicensed borrow pits. This EMP is prepared in accordance with the requirements of the MPRDA and DMR
Applicants for mining permits, are herewith, in terms of the provisions of Section 29 (a) and in terms of section 39 (5) of the Mineral and Petroleum Resources Development Act, directed to submit an Environmental Management Plan strictly in accordance with the subject headings, and to compile the content according to all the sub items to the said subject headings referred to in the guideline published on the Departments website, within 60 days of notification by the Regional Manager of the acceptance of such application. This EMP document adheres to the standard format provided by the Department in terms of Regulation 52 (2).
The permitting will be undertaken in accordance with the Mineral and Petroleum Resources Development Act (MPRDA; No. 28 of 2002). As an organ of state, the Department of Roads and Public Works (DRPW) has obtained exemption from the provisions of sections 16, 20, 22 and 27 (application process) of the MPRDA in respect of any activity to remove any material for the construction and maintenance of dams, harbours, roads and railway lines and for the purposes incidental thereto, as allowed by the said act in section 106 (1). As such the utilisation of resources is subject only to the preparation, submission and approval of an EMP, compiled in accordance with the requirements of the MPRDA.
The purpose of the EMP is to identify and assess potential impacts associated with the project through a process of environmental investigations, stakeholder and public consultation, and to provide sufficient detail on the project to the Department of Mineral Resources (DMR), in order to allow DMR to make an informed decision on the project.
Exemptions from certain provisions of Act
106. (1) The Minister may by notice in the Gazette, exempt any organ of state from the provisions of sections 16, 20, 22 and 27 in respect of any activity to remove any mineral for road construction, building of dams or other purpose which may be identified in such notice.
(2) Despite subsection (1), the organ of state so exempted must submit an environmental management programme for approval in terms of section 39(4).
(3) Any landowner or lawful occupier of land who lawfully, takes sand, stone, rock, gravel or clay for farming or for effecting improvements in connection with such land or community development purposes, is exempted from the provisions of in subsection (1) as long as the sand, stone, rock, gravel or clay is not sold or disposed of.
With regard to the environment, Section 37(1) of the MPRDA provides that the environmental management principles listed in Section 2 of the National Environmental Management Act (No. 107 of 1998) (NEMA) must guide the interpretation, administration and implementation of the environmental requirements of the MPRDA, and makes those principles applicable to all prospecting and mining operations. The NEMA principles apply throughout South Africa to the actions of all organs of state that may significantly affect the environment, and thus to decision making on mining applications. These principles require that impacts on biodiversity and ecological integrity are avoided, and if they cannot altogether be avoided, are minimised and remedied. They also specify that the costs of remedying pollution, environmental degradation and consequent adverse health effects and of preventing, controlling or minimising further pollution, environmental damage or adverse health effects must be paid for by those responsible for harming the environment. Moreover the responsibility for the environmental health and safety consequences of a policy, programme, project, product, process, service or activity exists throughout its life cycle.
Furthermore, Section 37(2) of the MPRDA states that “any prospecting or mining operation must be conducted in accordance with generally accepted principles of sustainable development by integrating social, economic and environmental factors into the planning and implementation of prospecting and mining projects in order to ensure that exploitation of mineral resources serves present and future generations”.
To ensure this, the MPRDA stipulates that:
1. The NEMA principles apply to all mining and serve as guidelines for the interpretation, administration and implementation of the environmental requirements of the MPRDA (Section 37(1)).
2. the holder of a permission/right/permit (Section 38):
3. must consider, investigate, assess and communicate the impact of his or her prospecting or mining on the environment
4. must manage all environmental impacts
5. must – as far as is reasonably practicable, rehabilitate the environment to its natural or predetermined state, or to a land use which conforms to the generally accepted principle of sustainable development
6. is responsible for environmental damage, pollution or ecological degradation as a result of reconnaissance, prospecting or mining operations which may occur inside and outside the boundaries of the areas to which such right, permission or permit relates.
7. the permission/right/permit may be issued if the Minister is satisfied that it will take place within the framework of national environmental management policies, norms and standards (Section 48(2)).
The MPRDA includes some key legal and regulatory mechanisms:
1. EMP: this is the main tool used to mitigate and manage environmental impacts, detailing the proposed measures to be undertaken. The requirements of an EMP in the MPRDA (and dependent on the permission/right/permit to which it will be applied) are slightly different to those prescribed in Section 24N of NEMA (Amendment Act 62 of 2008), but generally both are giving effect to similar general objectives of integrated environmental management laid down in Section 23 of NEMA. The MPRDA requires mining operators to obtain environmental approval in advance of operations. It also imposes on-going environmental management and mitigation obligations throughout the mining life cycle. The EMP requires the applicant to undertake an EIA (see section 3.4 for more detail) and to set out the applicant’s financial provision for mitigation. The MPRDA (Regulation 51(a)(i)) also requires that environmental objectives and goals for closure are included in the EMP, highlighting the need to plan with closure in mind.
2. MPRDA Pollution Control and Waste Management Regulations: provide that water management and pollution control comply with the provisions of the National Water Act. It further provides that control of erosion and soil pollution control comply with applicable legislative requirements.
3. Prohibition or restriction of mining or prospecting: in terms of Section 49 of the MPRDA, the Minister of Mineral Resources may completely prohibit or restrict the granting of any permission/permit/right if the land is residential area, public road, railway or cemetery, being used for public or government purposes or reserved in terms of any other law. This provision allows the Minister, in consultation with other relevant Departments, to prohibit or restrict granting permission/right/permit in certain areas of critical biodiversity, heritage and hydrological importance.
4. In addition to the MPRDA, mining companies also need to comply with a range of other laws which regulate mining impacts on the environment. These include:
5. Constitution of Republic of South Africa, 1996: Section 24(a) of the Constitution states that everyone has the right ‘to an environment that is not harmful to their health or well-being’. Mines must comply with South African constitutional law by conducting their activities with due diligence and care for the rights of others.
6. NEMA: Environmental management principles set out in NEMA, and other Specific Environmental Management Acts (SEMAs) should guide decision making throughout the mining life cycle to reflect the objective of sustainable development25. Mining is prohibited in protected areas defined in the National Environmental Management Protected Areas Act (No. 57 of 2003; hereafter referred to as Protected Areas Act).
7. One of the most important and relevant principles is that disturbance of ecosystems, loss of biodiversity, pollution and degradation of environment and sites that constitute the nation’s cultural heritage should be avoided, minimised or as a last option remedied. This is supported by the Biodiversity Act as it relates to loss of biodiversity.
8. EIA Regulations (GN No. R. 543) published in terms of NEMA trigger the need for applicants to undertake either a Basic Assessment or Scoping and Environmental Impact Assessment if the proposed activity is included in one or more of the three Listing Notices; and Listing Notice 3 (listing activities and sensitive areas per province, for which a Basic Assessment process must be conducted) (GN No. R. 546).
9. In some cases both the MPRDA and NEMA require the identification, assessment and evaluation of impacts, and the determination of appropriate mitigation measures. An EMP may be required for activities subject to an EIA under NEMA.
10. Water Use Authorizations: the National Water Act (No. 36 of 1998) requires that provision is made both in terms of water quantity and quality for ‘the reserve’, namely to meet the ecological requirements of freshwater systems and basic human needs of downstream communities. It is essential in preparing an EMP that any impacts on water resources, be they surface water or groundwater resources, and/ or impacts on water quality or flow, are carefully assessed and evaluated against both the reserve requirement and information on biodiversity priorities. This information will be required in applications for water use licenses or permits and/or in relation to waste disposal authorizations.
11. Mine-water regulations (Government Notice (GN) No. R. 704) are aimed at ensuring the protection of water resources through restrictions on locality, material, and the design, construction, maintenance and operation of separate clean and dirty water systems. Detailed regulations on the use of water for mine-related activities were issued in 1999 under the National Water Act framework.
12. Liability for any environmental damage, pollution, or ecological degradation: arising from any and all mining-related activities occurring inside or outside the area to which the permission/right/permit relates is the responsibility of the rights holder. This liability continues until such time as a closure certificate is issued by the Minister of Mineral Resources. Company directors or members of a close corporation are jointly and individually liable for any unacceptable impact on the environment, regardless of whether it was caused intentionally or through negligence. The National Water Act and NEMA both oblige any person to take all reasonable measures to prevent pollution or degradation from occurring, continuing or reoccurring (polluter pays principle). Where a person/company fails to take such measures, a relevant authority may direct specific measures to be taken and, failing that, may carry out such measures and recover costs from the person responsible.
13. Public participation: Public consultation and participation processes prior to granting licenses or authorizations can be an effective way of ensuring that the range of ways in which mining’s impact on the environment, social and economic conditions are addressed, and taken into account when the administrative discretion to grant or refuse the license is made. Further, under Section 10 of the MPRDA, which requires that interested and affected parties be made aware that an application has been accepted and are given 30 days to submit comments, any objections should initiate the establishment of a Regional Mining Development and Environmental Committee (RMDEC).
14. Provincial legislation, such as the Land Use Planning Ordinance (No. 15 of 1985) (LUPO) the Orange Free State’s Townships Ordinance (No. 9 of 1969), and the Transvaal Province’s Town-Planning and Townships Ordinance (No. 15 of 1986) which applies in Gauteng, Limpopo and Mpumalanga: to regulate land use and to provide for matters incidental thereto. Zoning schemes may have implications for mining and mining associated activities. Where mining is not permitted within a zoning scheme, the holder of a mining right or permit will need to apply for these areas to be rezoned in order to allow mining.
15. National Heritage Resources Act (No. 25 of 1999): describes the importance of heritage in the South African context, and designates the South African Heritage Resource Agency (SAHRA) as guardian of the national estate which may include heritage resources of cultural significance that link to biodiversity, such as places to which oral traditions are attached or which are associated with living heritage, historical settlements, landscapes and natural features of cultural significance, archaeological and paleontological sites, graves and burial grounds, or movable objects associated with living heritage. Further, formal protections under the Natural Heritage Resources Act include: national heritage sites and provincial heritage sites (some recognized globally under the World Heritage Convention), and protected areas amongst others.
A detailed list of Biodiversity and mining related legislation includes the following:
1. Mineral and Petroleum Resources Development Act (No. 28 of 2002)
2. National Environmental Management Act (No. 107 of 1998), as amended 2008
3. National Environmental Management Biodiversity Act (No. 10 of 2004)
4. National Environmental Management Protected Areas Act (No. 57 of 2003)
5. National Environmental Management Protected Areas Act (No. 57 of 2003)
6. National Environmental Management Waste Act (No. 59 of 2008)
7. National Environmental Management EIA Regulations (GN No. R. 543) and Listing Notices 1,2 and 3 (GN No. 544, 545 and 546 respectively)
8. National Forest Act (No. 84 of 1998)
9. National Veld and Forest Fire Act (No. 101 of 1998)
10. Mountain Catchment Act (No. 63 of 1970)
11. National Water Act (No. 36 of 1998)
12. Mine-water regulations (GN No. R. 704)
13. Promotion of Administrative Justice Act (No. 3 of 2000)
14. Promotion of Access to Information Act (No. 2 of 2000)
15. Land Use Planning Ordinance (No. 15 of 1985)
16. National Heritage Resources Act (No. 25 of 1999)
17. World Heritage Convention Act (No. 49 of 1999)
18. Municipal Systems Act (No. 32 of 2000)
19. Integrated Coastal Management Act (No. 24 of 2008)
20. Marine Living Resources Act (No. 18 of 1998)
21. Conservation of Agricultural Resources Act (CARA; No 43 of 1983) (as amended 2001)
1. Section 2(4)(a)(i): the disturbance of ecosystems and loss of biological diversity are avoided, or, where they cannot be altogether avoided, are minimised and remedied.
2. Section 2(4)(a)(ii): pollution and degradation of the environment are avoided, or, where they cannot be altogether avoided, are minimised and remedied.
3. Section 2(4)(a)(vi): the development, use and exploitation of renewable resources and the ecosystems of which they are part do not exceed the level beyond which their integrity is jeopardized.
4. Section 2(4)(a)(vii): a risk-averse and cautious approach is applied, which takes into account the limits of current knowledge about the consequences of decisions and actions.
5. Section 2(4)(e): responsibility for the environmental health and safety consequences of a policy, programme, project, product, process, service or activity exists throughout its life cycle.
6. Section 2(4)(o): The environment is held in public trust for the people, the beneficial use of environmental resources must serve the public interest and the environment must be protected as the people's common heritage.
7. Section 2(4)(p): The costs of remedying pollution, environmental degradation and consequent adverse health effects and of preventing, controlling or minimizing further pollution, environmental damage or adverse health effects must be paid for by those responsible for harming the environment.
8. Section 2(4)(r): Sensitive, vulnerable, highly dynamic or stressed ecosystems, such as coastal habitats including dunes, beaches and estuaries, reefs, wetlands, and similar ecosystems require specific attention in management and planning procedures, especially where they are subject to significant human resource usage and development pressure.
The Developer (DRPW) remains ultimately responsible for ensuring that the development is implemented according to the requirements of the EMP. The developer is responsible for ensuring that sufficient resources (time, financial, human, equipment, etc0 are available to the other role players (e.g. the ECO, CLO and contractor) to efficiently and effectively perform their tasks in terms of the EMP. The Developer is liable for restoring the environment in the event of negligence leading to damage to the environment. The developer shall endure that the EMP is included in the tender documentation so that the contractor who is appointed is bound to the conditions of the EMP. The developer is responsible for appointing an Environmental Control Officer (ECO) to oversee all the environmental aspects relating to the development.
The Consulting Engineer, is bound to the EMP conditions through his/her contract with the developer, and is responsible for ensuring the she/he adheres to all the conditions of the EMP. The Consulting Engineer shall thoroughly familiarise him/her-self with the EMP requirements before coming onto site and shall request clarification on any aspects of these documents, should they be unclear.
The Contractor, as the developer’s agent on site, is bound to the EMP conditions through his/her contract to the developer, and is responsible for ensuring that she/he adheres to all the conditions of the EMP. The Contractor shall thoroughly familiarise him/her-self with the EMP requirements before coming onto site and shall request clarification on any aspects of these documents, should they be unclear. The contractor shall ensure that he/she has provided sufficient budget for complying with all EMP conditions at the tender stage. The Contractor shall comply with all orders (whether verbal or written) given by the ECO/Contract Engineer in terms of the EMP.
The ECO is appointed by the developer as an independent monitor of the implementation of the EMP. He/she shall form part of the project team and shall be involved in all aspects of project planning that can influence environmental conditions on the site. The ECO shall attend relevant project meetings, conduct inspections to assess compliance with the EMP and be responsible for providing feedback on potential environmental problems associated with the development. In addition, the ECO is responsible for:
1. Liaison with relevant authorities;
2. Liaison with contractors regarding environmental management;
3. Undertaking routine monitoring and appointing a competent person/institution to be responsible for specialist monitoring, if necessary;
4. The ECO has the right to enter the site and undertake monitoring, auditing and assessment at any time, with the agreement of the Contractor, which agreement shall not be unreasonably withheld.
The contractor shall appoint an Environmental Liaison Officer (ELO) to assist with the day-to-day monitoring of activities on site. Any issue raised by the ECO shall be routed to the ELO for the contractor’s attention. The ELO shall be permanently on site during the construction phase to ensure daily environmental compliance. With the EMP and shall be ideally a senior member of the contractors management team. The ELO shall be responsible for ensuring that all staff members are adequately trained and aware of the EMP. The ELO shall be responsible for undertaking weekly environmental inspections and accompany the ECO during site visits, audits or assessments.
This report incorporates all the information required by the Department of Minerals and Petroleum Resources Development regulations for Environmental Management Plans, namely:
1. A description of the environment likely to be affected by the proposed prospecting or mining operation.
2. Assessment of the potential impacts of the proposed prospecting or mining operation on the environment, socio- economic conditions and cultural heritage.
3. Summary of the assessment of the significance of the potential impacts and the proposed mitigation measures to minimize adverse impacts.
4. Planned monitoring and performance assessment of the environmental management plan.
5. Closure and environmental objectives.
6. Record of the public participation and the results thereof.
7. Environmental awareness plan.
8. Proof of financial provision.
9. Capacity to rehabilitate and manage negative impacts on the environment.
10. Undertaking to execute the environmental management plan.
EAS has prepared this report for the sole use of the Department of Roads and Public Works (DRPW) in accordance with generally accepted consulting practices and for the intended purposes as stated in the agreement under which this work was completed. This report may not be relied upon by any other party without the explicit written agreement of the Department of Roads and Public Works and EAS. No other warranty, expressed or implied, is made as to the professional advice included in this report.
The conclusions and recommendations contained in this report are based upon information provided by others and the assumption that all relevant information has been provided by those bodies from whom it has been requested. Where field investigations have been carried out, they have been restricted to a level of detail required to achieve the stated objective of the work.
All items listed in EAS Standard Terms and Conditions of Business are applicable to this report.
This report was compiled from information obtained from the following sources:
11. Numerous site visits and assessments.
12. Public participation
13. Information on the biophysical environment (Mr Jamie Pote)
14. Geotechnical Testing of Borrow Pit material (Outeniqua Lab EC cc.)
Table 1: Details of Applicant
ITEM |
APPLICANT CONTACT DETAILS |
Name |
Department of Roads & Public Works |
Tel No: |
(040) 602 4000 |
Fax No: |
(040) 602 4001 |
Call centre: |
0800 864 951 |
Postal Address |
Private Bag X0022, Bhisho, 5605 |
Table 2: Details of Consultant
ITEM |
CONSULTANT CONTACT DETAILS |
Name |
|
Tel No: |
|
Fax No: |
|
Cellular No: |
|
E-mail Address: |
|
Postal Address |
This report is divided into 9 chapters:
Chapter 1:
Consists of the project introduction, background and Regional Context of the mining application and the area in which the Borrow Pits are located.
Chapter 2:
Specific Information relating to the individual Borrow Pits, grouped per borrow pit, addressing the following sections of the MPRDA:
· REGULATION 52 (2): Description of the environment likely to be affected by the proposed prospecting or mining operation
a) The environment on site relative to the environment in the surrounding area.
b) The specific environmental features on the site applied for which may require protection, remediation, management or avoidance.
c) Map showing the spatial locality of all environmental, cultural/heritage and current land use features identified on site.
d) Confirmation that the description of the environment has been compiled with the participation of the community, the landowner and interested and affected parties,
Chapter 3:
· REGULATION 52 (2) (b): Assessment of the potential impacts of the proposed prospecting or mining operation on the environment, socio- economic conditions and cultural heritage.
a) Description of the proposed prospecting or mining operation.
i. The main prospecting activities (e.g. access roads, topsoil storage sites and any other basic prospecting design features )
ii. Plan of the main activities with dimensions
iii. Description of construction, operational, and decommissioning phases.
iv. Listed activities (in terms of the NEMA EIA regulations)
b) Identification of potential impacts (Refer to the guideline)
c) Potential impacts per activity and listed activities.
i. Potential cumulative impacts.
ii. Potential impact on heritage resources
iii. Potential impacts on communities, individuals or competing land uses in close proximity. (If no such impacts are identified this must be specifically stated together with a clear explanation why this is not the case.)
iv. Confirmation that the list of potential impacts has been compiled with the participation of the landowner and interested and affected parties,
v. Confirmation of specialist report appended (Refer to guideline)
· REGULATION 52 (2) (c): Summary of the assessment of the significance of the potential impacts and the proposed mitigation measures to minimise adverse impacts.
a) Assessment of the significance of the potential impacts
i. Criteria of assigning significance to potential impacts
ii. Potential impact of each main activity in each phase, and corresponding significance assessment
iii. Assessment of potential cumulative impacts.
Chapter 4:
3. REGULATION 52 (2) (c): Summary of the assessment of the significance of the potential impacts and the proposed mitigation measures to minimise adverse impacts.
a) Proposed mitigation measures to minimise adverse impacts.
i. List of actions, activities, or processes that have sufficiently significant impacts to require mitigation.
ii. Concomitant list of appropriate technical or management options (Chosen to modify, remedy, control or stop any action, activity, or process which will cause significant impacts on the environment, socio-economic conditions and historical and cultural aspects as identified. Attach detail of each technical or management option as appendices)
iii. Review the significance of the identified impacts (After bringing the proposed mitigation measures into consideration).
Chapter 5:
4. REGULATION 52 (2) (e): Planned monitoring and performance assessment of the environmental management plan.
a) List of identified impacts requiring monitoring programmes.
b) Functional requirements for monitoring programmes.
c) Roles and responsibilities for the execution of monitoring programmes.
d) Committed time frames for monitoring and reporting.
5. REGULATION 52 (2) (f): Closure and environmental objectives.
a) Rehabilitation plan (Show the areas and aerial extent of the main prospecting activities, including the anticipated prospected area at the time of closure).
b) Closure objectives and their extent of alignment to the pre-mining environment.
c) Confirmation of consultation (Confirm specifically that the environmental objectives in relation to closure have been consulted with landowner and interested and affected parties).
Chapter 6:
6. REGULATION 52 (2) (g): Record of the public participation and the results thereof.
a) Identification of interested and affected parties. (Provide the information referred to in the guideline)
b) The details of the engagement process.
i. Description of the information provided to the community, landowners, and interested and affected parties.
ii. List of which parties identified in 7.1 above that were in fact consulted, and which were not consulted.
iii. List of views raised by consulted parties regarding the existing cultural, socio-economic or biophysical environment.
iv. List of views raised by consulted parties on how their existing cultural, socio-economic or biophysical environment potentially will be impacted on by the proposed prospecting or mining operation.
v. Other concerns raised by the aforesaid parties.
vi. Confirmation that minutes and records of the consultations are appended.
vii. Information regarding objections received.
c) The manner in which the issues raised were addressed.
Chapter 7
7. SECTION 39 (3) (c ) of the Act: Environmental awareness plan.
a) Employee communication process (Describe how the applicant intends to inform his or her employees of any environmental risk which may result from their work).
b) Description of solutions to risks (Describe the manner in which the risk must be dealt with in order to avoid pollution or degradation of the environment)t.
c) Environmental awareness training (Describe the general environmental awareness training and training on dealing with emergency situations and remediation measures for such emergencies).
Chapter 8:
8. REGULATION 52 (2) (d): Financial provision. The applicant is required to-
a) Plans for quantum calculation purposes (Show the location and aerial extent of the aforesaid main mining actions, activities, or processes, for each of the construction operational and closure phases of the operation).
b) Alignment of rehabilitation with the closure objectives (Describe and ensure that the rehabilitation plan is compatible with the closure objectives determined in accordance with the baseline study as prescribed).
c) Quantum calculations (Provide a calculation of the quantum of the financial provision required to manage and rehabilitate the environment, in accordance with the guideline prescribed in terms of regulation 54 (1) in respect of each of the phases referred to).
d) Undertaking to provide financial provision (Indicate that the required amount will be provided should the right be granted).
Chapter 9
9. SECTION 39 (4) (a) (iii) of the Act: Capacity to rehabilitate and manage negative impacts on the environment.
a) The annual amount required to manage and rehabilitate the environment (Provide a detailed explanation as to how the amount was derived)
b) Confirmation that the stated amount correctly reflected in the Prospecting Work Programme as required
10. REGULATION 52 (2) (h): Undertaking to execute the environmental management plan.
Existing gravel roads subject to the proposed project in the Intsika Yethu, Sakhisizwe & Engcobo Local Municipalities have been identified by the department of Roads and Public Works as being in need of maintenance and re-gravelling. The specific roads in the abovementioned Local Municipal Areas are the DR08248, DR08247, DR08041 and the DR8504 roads.
Gravel roads weather over relatively short periods of time and require periodical re-gravelling. The gravel roads identified for re-gravelling display defects such as corrugation, ravelling, and exposed oversized stones.
The roads to be re-gravelled provide access to remote villages and the poor quality of the roads have a significant impact on the lives of the local residents as alternative routes to nearby towns are often too far to travel and add extra costs to travel for individuals.
In order to re-gravel the specified roads, large amounts of material is deeded for mostly the wearing course of the road. In some cases the material is of such a nature that is can be grid rolled to the appropriate size, and in others the material would be crushed due to the physical properties of the material. Quality control of material would include blending harder materials with fines to obtain an optimal material quality. The extensions of existing borrow pits for the collection of materials for the specified roads is being proposed.
After a preliminary screening of borrow pits along the DR08248, DR08247, DR08041 & DR 8504 roads, 15 borrow pits were selected subject to criteria including material type, location, access, surrounding land use, slope, erosion, hydrology and sensitive vegetation. Three sites were selected along the DR08248, 5 along the DR08247, 6 along the DR08041 & one along the DR8504 roads. The borrow pits will be used exclusively for the upgrade/re-gravelling of the road they are situated adjacent to.
If approved, this EMP will be used as guidelines for the excavation of material from the proposed borrow pits and the rehabilitation thereof.
The locations of all the proposed borrow pits and the road sections they are to be used for are shown in figure 1.
The affected roads are situated north of Cofimvaba and south of Cala. Queenstown is located 76 km West of Cofimvaba and 100 km south-west of Cala (Sakhisizwe).
Table 3: Locality of proposed borrow pits.
Road |
BP |
Coordinates |
LMA |
Land Owner* |
Comment |
DR08041 |
5.9 |
S31 56.909 |
Intsika Yethu |
Communal |
Existing BP site; situated 5.9 km along the DR08041 from the R61 intersection |
E27 34.106 |
|||||
14.4 RHS |
S31 53 37.2 |
Intsika Yethu |
Communal |
Existing BP site; situated 14.4 km along the DR08041 from the R61 intersection |
|
E27 32 04.3 |
|||||
28.8 RHS |
S31 47 39.8 |
Intsika Yethu |
Communal |
Existing BP site; situated 28.8 km along the DR08041 from the R61 intersection. |
|
E27 27 35.4 |
|||||
35.7 RHS |
S31 44 59.6 |
Intsika Yethu |
Communal |
Existing BP site; situated 35.7 km along the DR08041 from the R61 intersection. |
|
E27 26 33.3 |
|||||
37.7 RHS |
S31 44 08.4 |
Intsika Yethu |
Communal |
Existing BP site; situated 37.7 km along the DR08041 from the R61 intersection. |
|
E27 26 44.1 |
|||||
50.1 |
S31 38 24.0 |
Sakhisizwe |
Communal |
Existing BP site; situated 5.9 km along the DR08041 from the R61 intersection. |
|
E27 27 59.0 |
|||||
DR08247 |
2.5 LHS |
S31 49 59.366 |
Intsika Yethu |
Communal |
Existing BP site; situated 2.5 km along the DR08247 from the DR08038 intersection. |
E27 43 33.517 |
|||||
8.5 LHS |
S31 51 39.678 |
Intsika Yethu |
Communal |
Existing BP site; situated 8.5 km along the DR08247 from the DR08038 intersection. |
|
E27 41 3.320 |
|||||
19.1 LHS |
S31 54 09.0 |
Intsika Yethu |
Communal |
Existing BP site; situated 19.1 km along the DR08247 from the DR08038 intersection. |
|
E27 36 40.5 |
|||||
23.2 |
S31 54 48.2 |
Intsika Yethu |
Communal |
Existing BP site; situated 23.2 km along the DR08247 from the DR08038 intersection. |
|
E27 34 22.0 |
|||||
Village |
S31 49 48.8 |
Intsika Yethu |
Communal |
Existing BP site; situated approximately 1 km along the DR08247 from the DR08038 intersection. |
|
E27 44 28.6 |
|||||
DR08248 |
1.3 RHS |
S31 51 22.136 |
Intsika Yethu |
Communal |
Existing BP site; situated 1.3 km along the DR08248 from the DR08247 intersection. |
E27 38 34.865 |
|||||
11.2 RHS |
S31 47 39.85 |
Intsika Yethu |
Communal |
Existing BP site; situated 11.2 km along the DR08248 from the DR08247 intersection. |
|
E27 36 43.75 |
|||||
18.0 RHS |
S31 46 11.732 |
Intsika Yethu |
Communal |
Existing BP site; situated 18 km along the DR08248 from the DR08247 intersection. |
|
E27 35 35.143 |
|||||
DR08504 |
6.8 |
S31 42.885 |
Engcobo |
Communal |
Existing Borrow Pit; situated 6.8 km along DR08504 |
E27 49.177 |
*Communal – Department of Rural Development and Land Reform
A screening of Regional Biodiversity Features was undertaken, based on a model developed that included the following features:
1. Protected areas
2. World Heritage Sites and their legally proclaimed buffers
3. Critically Endangered and Endangered ecosystems
4. Critical Biodiversity Areas
5. River and wetland Freshwater Ecosystem Priority Areas (FEPAs), and
6. 100 m Buffer of rivers and wetlands
7. RAMSAR Sites
8. Protected area buffers
9. Trans-frontier Conservation Areas (remaining areas outside of formally proclaimed PAs)
10. High water yield areas
11. Coastal Protection Zone
12. Estuarine functional zones
13. Ecological support areas
14. Vulnerable ecosystems
15. Focus areas for land-based protected area expansion and focus areas.
A summary of these features (illustrated in Figure 4 to Figure 6) is provided in Table 4 below.
Table 4: Summary of Biodiversity features for the Borrow Pit sites.
Borrow Pit |
Vegetation Type: |
Status |
Present land use: |
CBA |
8041/5.9 |
Tsomo Grassland |
Vulnerable |
Urban Built-up |
CBA 3 |
8041/14.4 |
Drakensberg Foothill Moist Grassland |
Least Concern |
Natural |
|
8041/28.8 |
Tsomo Grassland |
Vulnerable |
Natural |
CBA 3 |
8041/35.7 |
Tsomo Grassland |
Vulnerable |
Natural |
CBA 3 |
8041/37.7 |
Tsomo Grassland |
Vulnerable |
Natural |
CBA 3 |
8041/50.1 |
Tsomo Grassland |
Vulnerable |
Natural |
CBA 3 |
8247/2.5 |
Tsomo Grassland |
Vulnerable |
Natural |
CBA 3 |
8247/8.5 |
Southern Mistbelt Forest |
Vulnerable |
Natural |
CBA 1 |
8247/19.1 |
Tsomo Grassland |
Vulnerable |
Urban Built-up |
CBA 3 |
8247/23.2 |
Tsomo Grassland |
Vulnerable |
Natural |
CBA 3 |
8247/Village |
Tsomo Grassland |
Vulnerable |
Urban Built-up |
CBA 3 |
8248/1.3 |
Drakensberg Foothill Moist Grassland |
Least Concern |
Natural |
|
8248/11.2 |
Tsomo Grassland |
Vulnerable |
Cultivated and Degraded |
CBA 3 |
8248/18.0 |
Tsomo Grassland |
Vulnerable |
Natural |
CBA 3 |
8504/6.8 (EMP) |
Tsomo Grassland |
Vulnerable |
Cultivated and Degraded |
CBA 3 |
The locations of all the proposed borrow pits and the road sections they are to be used for are shown in Figure 1. The affected roads are situated South-East of Cala and North-West of Engcobo. Queenstown is located 140 km West of Engcobo and 100 km south-west of Cala (Sakhisizwe). They are situated on the DR08041, DR08247, DR08248 and DR08504.
The surrounding area can generally be described as flat or gentle undulating lowland plains intersected by moderately rolling hills and mountains, much incised by river gorges. Drainage of the region is mainly in a southerly direction.
As per the Geological Map in Figure 2, the Geology in the region consists of the following:
Symbol |
Lithology |
Formation |
Jd |
Volcanic Rocks, gabbro, pikriet |
Karroo sequence, Drakensberg Group |
Jdb |
Volcanic Rocks, Basaltic Lava, subordinate tuff and agglomerate |
Drakensberg Group |
TRm |
Volcanic Rocks, Basaltic Lava, subordinate tuff and agglomerate |
Karroo sequence, Drakensberg Group, Molteno Formation |
TRb |
Brownish Red and grey mudstone, sandstone (Sedimentary) |
Karroo sequence, Beaufort Group, Tarkastad subgroup, Burgersdorp Formation |
TRe |
Brownish-red and grey mudstones, sandstone |
Drakensberg Group, Elliot Formation |
Alluvium |
Alluvium |
|
The study area is underlain mostly by sedimentary rocks of the Early Triassic Period Karoo Supergroup, which was formed under fluvial conditions when the inland Karoo Sea was drying out and wide plains were being carved by large river systems. These rivers deposited the sands and muds on broad flood plains which over time became interbedded sandstone and mudstone of the Katberg and Burgersdorp Formations (both of the Tarkastad Subgroup, Karoo Supergroup).
The Katberg Formation has been mapped in the southern and south-western part of the site and is dominated by sandstone lithologies formed by multi-channelled braided river environments. The braided river system resulted in the development of a deeply eroded landscape with few fine-grained (mud and silt) overbank deposits developing. This formation therefore consists mainly of sandstone with sub-ordinate argillaceous (rock containing clay) maroon-coloured mudstone.
A return to a meandering river system is reflected in the mudstone-dominated strata of the Burgersdorp Formation, which has been mapped in the eastern and north-eastern parts of the study area. This formation is dominated by maroon, grey and olive-coloured mudstone and is considered a distal equivalent to that of the Katberg Formation.
These Beaufort Group rocks are interrupted by doleritic dykes (vertical intrusion) and sills (horizontal intrusion) formed during the Jurassic Period. These intrusions forced their way between the sedimentary strata during the eruption phases that formed the Drakensberg Group basalts. The sedimentary rocks into which the dolerite intruded are often altered (metamorphosed) in aureoles adjacent to intrusions (e.g. Hornfels). The dolerite has a regional north-south trend around which the Sabalele Road has been constructed. This material is, therefore, likely to be intersected in outcrop in the southern part of the study area.
Geotechnical Interpretation
The Karoo Supergroup rocks generally reveal a subdued topography in the study area with a variable weathering profile. The sandstone lithologies tend to be more weathering resistant and are blanketed by a thinner soil cover than that of the softer, mudstone rocks. The completely weathered rock/ residual soil interface is commonly susceptible to dispersion and piping erosion, resulting in the development of the characteristic donga-marked landscape where sloping ground prevails.
The sandstone lithologies have a rock strength that is often considered too low for use as base course or sub base, yet it is too high (and has little binding capabilities) for use as a crushed wearing course on unsurfaced roads. This material is likely to require crushing for any aggregate application. The mudstone rocks also have a rock strength that is considered too low for use as base course or sub base. The rock is, however, often a preferred material for gravel wearing course applications, and breaks down easily on the roadway during mechanical placement. Most of the Karoo Supergroup rocks are considered suitable for select subgrade applications.
The intrusive dolerites can be highly variable in terms of rock strengths and weathering profiles. The geotechnical properties of these rocks are often affected by the cooling rates of the magma when they were formed; slow cooling magma forms larger crystals that develop into high strength rocks, whilst quickly cooling magma forms smaller crystals that can eventuate into low strength rocks. The dolerite also displays a weathering profile that can be deep (tens of metres) and dominated by fresh rock core stones of variable sizes, or shallow weathering with soil cover often less than one metre underlain by competent rock without core stones. The weathering profiles and rock strengths of dolerite are not easily ascertainable based on surface outcrop. It is common, nevertheless, for the dolerite outcrop to reveal a positively weathered landform in the study area, frequently associated with a very different vegetation cover to that of the surrounding Karoo Supergroup rocks.
The extremely weathered dolerite reveals a deep red-coloured soil cover often pock-marked with sub-rounded and well-rounded dolerite core stones. These weathered soils are often highly dispersive and erosion scours are common in areas where positive relief is not offered adequate protection from vegetation cover. Doleritic soil is frequently highly expansive and considered unsuitable for any road construction application. The materials’ construction suitability improves with depth as the highly weathered rock (Sabunga) is considered suitable for gravel wearing course use in arid environments, whilst the moderately weathered, slightly weathered and fresh rock is a well-documented source of good sub base and base course.
The drainage of the area generally flows in a southerly direction (Figure 3). The Tsomo and Mgwali Rivers are the main drainage systems. The minor seasonal streams in the surrounding area in proximity to the Borrow Pits are tributaries of these rivers. Where Borrow Pits are in the vicinity of drainage lines and rivers, stormwater and runoff will need to be adequately managed to prevent increased turbidity of downstream river systems. With the proper implementation of the EMP it likely that any existing impacts that are currently present will be reduced. Rivers area indicated on the close-up maps of the individual Borrow Pit descriptions.
Some wetlands (Natural and artificial) may be in proximity to seasonal wetlands. As for drainage lines above, runoff will need to be managed and will be dealt with in Borrow Pit descriptions accordingly. After rehabilitation of the Borrow Pits, some areas will probably be natural accumulation areas for runoff from surrounding areas and become small dams or artificial wetlands in the long-term.
Groundwater resources could potentially be affected by the mining of Borrow pits due to inadvertent fuel and chemical spills. If the management measure prescribed below are adhered to it is not anticipated that groundwater resources would be significantly affected by the Borrow Pits.
The area is a predominantly summer rainfall area. The mean annual rainfall for Engcobo (809.9 mm), decreasing westwards. Mean annual temperatures in the Engcobo area is 16.7°C.
Air quality levels in rural areas surrounding the Borrow Pit sites are typically good. The gravel roads are however a source of dust, especially during dry windy conditions. Air quality may be temporarily affected by the mining and concomitant road surfacing operations during the routine maintenance periods.
The Borrow pit sites are generally situated relatively close to provincial gravel roads, which are an existing source of noise. The current ambient noise levels are assumed to be relatively high due to road traffic. Noise receptors during mining operations would typically be residents in the villages nearest to the sites.
The Beaufort Group is Late Permian (255 million years) to Mid Triassic (237 million years) in age. Characteristic fossils include fish, amphibians and reptiles with a dominance of mammal-like reptiles (Theraptids). In addition, characteristic fossils include plant fossils of the Glossopteris flora with occasional invertebrate fossils (freshwater bivalve molluscs). Most of the fossil specimens represent groups that are now extinct. It is estimated that less than 5 % of sites have been identified in the Eastern Cape. There is a lack of identified sites in the District.
An internationally important record of life during the early diversification of land vertebrate is provided by the floodplain of the Beaufort Group (Karoo Supergroup). Giant amphibian coexisted with diapsid reptiles (the ancestors of dinosaurs, birds and most modern reptiles), anapsids (which probably include the ancestors of tortoises) and synapsids, the dominant of the group of the time which included the diverse therapsids (including the ancestors of mammals). The rocks provide the world’s most complete record of the important transition from early reptiles to mammals.
Most plant and animals were decimated during the end-Permian extinction event with Therapsid diversity being a serious contender for the most severe extinction event to affect life on Earth. Ongoing research on the effects of this extinction event is facilitated by the detailed record (afforded by the Beaufort Group strata) of life immediately before and after the event, as well as the gradual recovery of life afterwards.
The Beaufort Group is subdivided into a series of biostratigraphic units on the basis of its faunal content. There is a marked faunal change that occurs between the Dicynodon and Lystrosaurus Assemblage Zones and approaches the tops of the Balfour Formation. This corresponds with the major extinction event associated with the Perno-triassic boundary. The Lustrosaurus Assemblage Zone spans the uppermost (Palingkloof) member of the Balfour Formation, the Katberg Formation (Tarkastad Subgroup, Beaufort Group, Karoo Supergroup) and the lower part of the Burgersdorp Formation (Tarkastad Subgroup, Beaufort Group, Karoo Supergroup).
The Lystrosaurus Assemblage Zone is dominated by a single genus of dicynodont, Lyystrosaurus, which together with the captorhinid reptile (Procolophon) characterise this zone. Biarmosuchian and gorgonopsian Therapside do not survive into the Lystrosaurus Assemblage Zone, though therocephalian and cyndontian Therapside exhibit moderate abundance. Captohinid Reptilia are reduced, however, an unprecedented diversity of giant amphibian characterises this interval.
The effect of the end Permian extinction event are also evident in the extensive and important record of fossil plants present in the rocks of the Karoo. Whereas faunas of the Permian age are dominated by a wide range of early seed plants, the Glossopteridale (which probably include the ancestors of modern gymnosperms and ultimately angiosperms), this group appears to have gone entirely extinct during the end-Permian extinction. The rocks of the Karoo provide an unrivalled sequential record of these change and the diversification of other group of plants in the aftermath of the extinction. The strata of the Karoo basin have also yielded fossils insects and insect leaf damage of a range of ages.
Though including the uppermost level of the Lystrosaurus Assemblage Zone, the Burgersdorp Formation largely corresponds to the Cynognathus Assemblage Zone. Synapsid therapsid diversity does not demonstrate recovery between the Lystrosaurus and Cynognathus assemblage zones. The Dicynodontia, Lystrosaurus and Myosaurus are replace by Kombuisia and the giant Kannemeyeria. Therocephalia exhibit a turnover of taxa at a generic level, but an overall reduction in diversity. Cynodontia (Therapsida, Synasida) alone amongst synapsids demonstrate a slight increase in genera. These include the small advance Cynodont, Cynognathus, which together with the Cynodont Diademodon and the Dicynodont Kannemeyeria, characterise this assemblage zone. Eosuchid and captorhinid Reptilia are moderately common, though showing no generic continuity with taxa of the underlying zone. Amphibia remain diverse, though they are not as generically diverse as in the Lystosaurus Assemblage Zone and likewise demonstrate no genus level continuity therewith. Fossil fish reach their greatest known Karoo Supergroup diversity in the Burgersdorp Formation (Cynognathus Assemblage Zone). Plants (Dadoxylon, Dicroidium and Schizoneura), trace fossils (including both vertebrate and invertebrate burrows) and a freshwater bivalve (Unio karooensis) have also been recovered.
As Dolerite is an intrusive igneous rock, it contains no fossils.
Archaeological remains can consist of the following:
1. Human remains (graves, informal graves and cemeteries)
2. Stone artefacts and tools
3. Large Stone Features (Isisivane and circular stone walls)
4. Freshwater shell middens
5. Historical artefacts and features
6. Fossil Bone
Any, and all, human remains that are exposed during all phases of construction must be reported to the archaeologist, nearest museum or relevant heritage resources authority. Construction must then be halted until the archaeologist has investigated and removed the human remains. Human remains may be exposed when a grace or informal burial has been disturbed. Remains are either buried in a flexed position on the side, or in a sitting position with a flat stone capping the location of the burial. Developer are requested to be aware of the exposing human remains.
Stone artefacts can be difficult for the layman to identify. Large accumulations of flaked stones that do not appear to have been distributed naturally must be reported. If the stone artefacts are associated with bone / faunal remains or any other associated organic and material cultural artefacts, development must be halted immediately and reported to the archaeologist, nearest museum or relevant heritage resources authority.
Even though large stone features occur in different forms and sizes, they are relatively easy to identify. The most common features are roughly circular walls (most collapsed), usually dry packed stone, and may represent: stock enclosures, the remains of wind breaks or cooking shelters. Other features consist of large piles of stones of different sizes and height that are known as isisivane. These features generally occur near river and mountain crossings. The purpose and meaning of the isisivane are not fully understood, however, interpretations include the representation of burial cairns and symbolic value.
Accumulations of freshwater shell middens comprising mainly freshwater mussel occur along the muddy banks of rivers and streams and were collected by pre-colonial communities as a food resource. The freshwater shell middens generally contain; stone artefacts, pottery, bone and (sometimes) human remains. Freshwater shell middens may be of various sizes and depths. An accumulation that exceeds 1 m² in extent must be report to the archaeologist, nearest museum or relevant heritage resources authority.
These are relatively easy to identify and include the foundations and remain of buildings, packed dry stone walling representing domestic stock kraals. Other items include historical domestic artefacts such as: ceramics, glass, metal and military artefacts and dwellings.
Fossil bones may be embedded in geological deposits. Any concentrations of bone (whether fossilized of not) must be reported to the archaeologist, nearest museum or relevant heritage resources authority.
As indicated in Figure 6 the Borrow Pits are predominantly located within or adjacent to areas classified as Degraded, Cultivated and in some cases (Peri) Urban as per the SANBI Land Cover (2009) map.
The erosion potential of soils is the sensitivity of soils to the effects of wind and water on the soil structure. The erodability index is determined by combining the effects of slope and soil type, rainfall intensity and land use. A low value indicates a high erosion risk and a high value indicates a low erosion risk. The area falls within an erodability index of between 7 and 9, indicating that the area has a moderate to high susceptibility to erosion. Adequate measures must thus be implemented to minimise erosion.
At a regional level, two vegetation types are recognised within the immediate vicinity of the borrow pit sites (Mucina & Rutherford, 2006), which are namely Drakensberg Foothill Moist Grassland and Tsomo Grassland (Figure 4). Drakensberg Foothill Moist Grassland having a conservation status of Least Threatened and Tsomo Grassland being Vulnerable (Mucina & Rutherford, 2006).
Distribution ranges within the KwaZulu-Natal and Eastern Cape Provinces. Broad arc of Drakensberg piedmonts covering the surrounds of Bergville in the north, Nottingham Road, Impendle, Bulwer in the east, and Kokstad, Mount Currie, Underberg (KZN) and the surrounds of Mt Fletcher, Ugie, Maclear and Elliot (Eastern Cape) in the southwest
Present on moderately rolling and mountainous, much incised by river gorges of drier vegetation types and by forest, and covering forb-rich grassland dominated by short bunch grasses including Themeda triandra and Tristachya leucothrix
The geology is dominated by mudstones and sandstones of the Tarkastad and the Molteno Formation (Karoo Supergroup) as well as intrusive dolerites of Jurassic age. The dominant soil on the sedimentary parent material are well drained, with a depth of more than 800 mm and lay content from 15 – 55 %, representing soil forms such as Hutton, Clovelly, Griffin and Oatsdale. On the volcanic parent material (dolerite) the soils are represented by forms such as Balmoral, Shortlands and Vimy. Most common land types are Ac and Fa.
Conservation: Least threatened. Target 23%. Only 2–3% statutorily conserved in the uKhahlamba Drakensberg Park, Ntsikeni Wildlife Reserve as well as in the Karkloof, Mount Currie, Coleford, Fort Nottingham, Impendle, Ngeli, and Umgeni Vlei Nature Reserves. Almost 20% already transformed for cultivation, plantations and by urban sprawl. Alien woody species of Rubus and Acacia dealbata and Solanum mauritianum may become invasive in places. Erosion is very low to moderate.
NSBA (2011) Conservation status: Least threatened
NSBA (2011) Conservation Target (% of area): 23%
Present in the region to the east of the Queenstown basin, with the villages of Tsomo, Cala and Engcobo defining the eastern extent and Cathcart, Queenstown and Sterkstroom the western extent.
Present on flat or gentle undulating lowland plains intersected by mountains. The vegetation is grassland or open Thornveld, often grazed short or replaced by dwarf shrubland dominated by species of Euryops. Dominant and common species include omnipresent representatives of the genera Cymbopogon, Elionurus, Eragrostis, Aristida and Themeda. Asteraceae and Fabaceae are prominent among the forbs. The vegetation shows various stages of overutilization and also a gradient from grassland to Thornveld. Mountain ridges within this unit are often wooded and this woody component easily spreads into the surrounding vegetation when ecological conditions permit. Many of the other vegetation units in the region, both grassland and woody vegetation, grade into this one, so that there is a naturally high rate of species turnover.
Occurs predominantly on Mudstones of the Tarkastad Subgroup overlain mostly by soils of moderate depth.
Conservation: Vulnerable. Target - 23 %. None conserved in statutory conservation areas. Only 1 % conserved in private reserves. Some 27 % transformed mainly for cultivation and by dense concentrations of rural settlements. Increased occurrence of alien Schkuhria pinnata and Tagetes minuta indicates heavy disturbance. Erosion is a serious problem and it is high in 33 % of this unit, moderate in 32 %, and low and very low in 34 % of the area.
NSBA (2011) Conservation status: Vulnerable
NSBA (2011) Conservation Target (% of area): 23%
Distribution ranges within KwaZulu-Natal and Eastern Cape Provinces: Forest patches varying in size, occurring in fire-shadow habitats on south- and southeast-facing slopes and located along the Great Escarpment, spanning a large area from Somerset East, the Amathole Mountains, scarps of Transkei to the KwaZulu-Natal Midlands as far east as Ulundi. Found at altitudes spanning 850–1 600 m (most patches between 1 000 and 1 400 m).
Forests are tall grown (15–20 m tall), multi-layered (having two layers of trees, a dense shrubby understorey and a very well developed herb layer). The forests of low-lying scarps are low grown (in places having the character of scrub forest), and although less structured into different tree layers, they are still very species-rich. The tall-grown forests show a mix of coarse grain, canopy gap/disturbance driven dynamics and fine-grained, regeneration characteristics. In the forests of Transkei and KwaZulu-Natal Midlands, Podocarpus henkelii becomes prominent in the canopy layer. Deciduous trees play an important structural role here as well.
The geology is dominated by soils that are well-developed, deep, loamy and with high nutrient status - developed on weathered dolerite intrusions or mudstones, shales and sandstones of Balfour Formation (on Main Escarpment); the soils supporting forests of low-lying scarps are shallower as they developed on Witteberg quartzitic sandstones or various rocks of Karoo sequence geology.
Conservation: Least threatened. Target 30%. Some 8% statutorily conserved (including forests under DWAF jurisdiction) in the Eastern Cape encompassing the Bosberg Nature Reserve, Greater Addo Elephant National Park as well as Hogsback, Kologha, Isidenge, Kubusi, Katberg and Nabakyu State Forests. In KwaZulu-Natal these forests are statutorily protected in Impendle, Igxalingenwa, Karkloof and Qudeni Nature Reserves. Several private reserves protect smaller patches. About 5% has been transformed for plantations. Invasive aliens include Solanum mauritianum, Rubus species and several Acacia and Eucalyptus species. Uncontrolled harvesting of timber, poles and firewood, overexploitation of non-timber forest products and mismanagement of fire and burning regimes in surrounding grasslands are considered as current major threats (Von Maltitz et al. 2003).
NSBA (2011) Conservation status: Least threatened
NSBA (2011) Conservation Target (% of area): 30%
Critical biodiversity areas (CBAs) are terrestrial and aquatic features in the landscape that are critical for conserving biodiversity and maintaining ecosystem functioning (SANBI 2007). These form the key output of the conservation plan. They are used to guide protected area selection and should remain in their natural state as far as possible.
As indicated in Figure 5, the Eastern Cape Biodiversity Conservation Plan (ECBCP, 2007) the Borrow Pits are predominantly situated in areas designated a CBA 3 status (terrestrial), with a few either outside of designated CBA areas. Due to the limited size of these Borrow Pits, their effect on Critical Biodiversity Areas will be minimal. Individual Borrow Pits that are within CBA 1 or CBA 2 areas will be highlighted and appropriate measures recommended in the Impact and Mitigation sections of the report where necessary.
No Borrow Pits are located within designated Reserves (class 1 and class 2) none are within aquatic CBA’s.
The expansion of the borrow pits is unlikely to compromise the vegetation units significantly due to:
15. The small mining footprint.
16. The generally degraded state of the existing borrow pits and immediate vicinity.
17. The general close proximity to the road reserves.
18. The implementation of a formalized rehabilitation plan.
Loss of vegetation cover will thus tend to be highly localised and have a minimal impact (individual and cumulative) at a regional level. Furthermore it will most likely result in an overall improvement of the ecological integrity of existing sites that currently tend to be in a highly degraded state, as a result of inadequate historical remediation methods.
The impact of the expansion of existing Borrow Pits, generally located directly adjacent to roads in areas that are generally degraded is unlikely to have any significant negative impact on ecological processes occurring at a regional level. The implementation of best practice guidelines (as per the EMP) will most likely be effective management to minimise any negative consequences to being located within Critical Biodiversity Areas. In addition, since the existing Borrow Pits are currently inadequately managed, the implementation of the recommended management actions in the EMP will most likely result in an improvement to the status quo.
Any Borrow Pits that are significantly affected by the Regional Planning Frameworks will be dealt with accordingly in their relative Impact and Mitigation sections.
Based on a desktop Assessment of existing online databases as well as field verification, the potential list of flora and fauna species that may occur in the vicinity of the Borrow Pits, is quite extensive. Common flora species such as: Aloe arborescens, Aloe ferox, Aloe maculata, Bulbine abyssinica and Boophone disticha, are common around some of the sites.
The Giant Bull Frog, may be present in wetlands, but are unlikely to be affected by the Borrow Pits, which will not likely impact on any wetlands.
Appendix E provides a detailed list of species protected in term of the P.N.C.O., for which permits may be required should they occur. However limited field assessments indicate that the majority of these species are unlikely to be present. Due to limited sampling time, Presence or absence cannot be confirmed without detailed seasonal site visits, but the risk of any Critically Endangered or Endangered species being present is Low. The limited expansion of the Borrow Pits is thus unlikely to result in any significant impact to species conservation.
No Red Listed Critically Endangered or Endangered species are recorded for the area.
Table 5: Species of Special Concern known to occur in the vicinity of the sites.
Scientific Name |
Family |
Common name |
Status |
Endemic |
Flora |
||||
Albuca setosa |
HYACINTHACEAE |
PNCO |
||
Aloe arborescens |
ASPHODELACEAE |
PNCO |
||
Aloe ferox |
ASPHODELACEAE |
PNCO |
||
Aloe maculata |
ASPHODELACEAE |
PNCO |
||
Aristea anceps |
IRIDACEAE |
PNCO |
||
Bergeranthus multiceps |
MESEMBRYANTHEMACEAE |
PNCO |
||
Boophone disticha |
AMARYLLIDACEAE |
PNCO |
||
Brunsvigia grandiflora |
AMARYLLIDACEAE |
PNCO |
||
Bulbine abyssinica |
ASPHODELACEAE |
PNCO |
||
Bulbine asphodeloides |
ASPHODELACEAE |
PNCO |
||
Bulbine narcissifolia |
ASPHODELACEAE |
PNCO |
||
Cyrtanthus macowanii |
AMARYLLIDACEAE |
PNCO |
||
Delosperma repens |
MESEMBRYANTHEMACEAE |
PNCO |
||
Dierama atrum |
IRIDACEAE |
PNCO |
||
Dietes iridioides |
IRIDACEAE |
PNCO |
||
Drimia macrocentra |
HYACINTHACEAE |
PNCO |
||
Eulophia foliosa |
ORCHIDACEAE |
PNCO |
||
Gasteria excelsa |
ASPHODELACEAE |
PNCO |
||
Gladiolus longicollis subsp. longicollis |
IRIDACEAE |
PNCO |
||
Gladiolus mortonius |
IRIDACEAE |
PNCO |
||
Haemanthus humilis subsp. humilis |
AMARYLLIDACEAE |
PNCO |
||
Holothrix scopularia |
ORCHIDACEAE |
PNCO |
||
Hypoxis acuminata |
HYPOXIDACEAE |
PNCO |
||
Hypoxis angustifolia var. buchananii |
HYPOXIDACEAE |
PNCO |
||
Ledebouria cooperi |
HYACINTHACEAE |
PNCO |
||
Ledebouria revoluta |
HYACINTHACEAE |
PNCO |
||
Ornithogalum longibracteatum |
HYACINTHACEAE |
PNCO |
||
Ornithogalum tenuifolium subsp. tenuifolium |
HYACINTHACEAE |
PNCO |
||
Ruschia putterillii |
MESEMBRYANTHEMACEAE |
PNCO |
||
Satyrium longicauda var. longicauda |
ORCHIDACEAE |
PNCO |
||
Satyrium parviflorum |
ORCHIDACEAE |
PNCO |
||
Watsonia densiflora |
IRIDACEAE |
PNCO |
||
Watsonia pillansii |
IRIDACEAE |
PNCO |
||
Mammals |
||||
Myotis tricolor |
VESPERTILIONIDAE |
Temminck's Hairy Bat |
Near Threatened |
|
Reptiles |
||||
None |
||||
Amphibians |
||||
Pyxicephalus adspersus |
PYXICEPHALIDAE |
Giant Bull Frog |
NT |
|
Invertebrates |
||||
Aslauga australis (Butterfly) |
LYCAENIDAE |
Southern Purple |
Data Deficient |
Yes |
Chrysoritis lyncurium (Butterfly) |
LYCAENIDAE |
Tsomo River Opal |
Vulnerable |
Yes |
Chrysoritis penningtoni (Butterfly) |
LYCAENIDAE |
Pennington's Opal |
Vulnerable |
Yes |
Fish |
||||
Clarias gariepinus |
CLARIIDAE |
NEMBA (NL) |
The plant and animal species of special concern listed above require permits if any individuals are to be removed, translocated or pruned according to the relevant legislation including the National Forests Act and the Provincial Nature Conservation Ordinance as well as Threatened and Protected Species (T.o.P.S.)
The Borrow Pits will be utilised for routine maintenance of gravel roads in the area. These roads connect the villages and urban areas, thus if they are not maintained there will be a negative impact on the people, their health (safety) and their livelihoods. Furthermore vehicular ‘wear and tear’ results in higher living costs. Formalisation of the Borrow Pits will allow for regular routine maintenance of the roads that will benefit not only local communities and residents but also all road users.
No people will be directly affected by the proposed mining of Borrow Pits, but there may be a temporary noise and dust increase on nearby residents. Potential Impacts will be assessed on an individual Borrow Pit basis in the following sections.
There are certain risks posed to human health and safety via exposure to high noise and dust levels, as well as steep and/or unstable faces formed during mining activities. Pools of standing water can also pose a risk to livestock and people in rural areas. Community health and safety risks should be controlled through the implementation of a Health and Safety Management Plan to be implemented by the Contractor. Existing unsafe excavations (with vertical faces) and deep excavations where standing water can accumulate should be “made safe” on closure using unused and stockpiled overburden and topsoil.
Figure 1: Map indicating locality of borrow pits with major roads, towns, etc.
Figure 2: Geology Map.
Figure 3: Rivers and Wetlands
Figure 4: Positioning of the Borrow Pits relative to the VEGMAP vegetation types (Mucina & Rutherford, 2006).
Figure 5: Critical Biodiversity Areas, as per Eastern Cape Biodiversity Conservation Plan (ECBCP, 2007).
Figure 6: Land Use – excluding Natural Vegetation (SANBI Landcover, 2006).
This section of the report addresses REGULATION 52 (2) and REGULATION 52 (2) (b) of the MPRDA for each borrow pit. An overall summary of the impacts and general mitigation measures is provided in the next section.
· REGULATION 52 (2): Description of the environment likely to be affected by the proposed prospecting or mining operation
a) The environment on site relative to the environment in the surrounding area.
b) The specific environmental features on the site applied for which may require protection, remediation, management or avoidance.
c) Map showing the spatial locality of all environmental, cultural/heritage and current land use features identified on site.
d) Confirmation that the description of the environment has been compiled with the participation of the community, the landowner and interested and affected parties,
Each Borrow Pit description is comprised of the following:
19. Description of the Borrow Pit in a table
20. Contact Information
21. Location Details
22. Physical Details
23. Samples Collected and Tests Performed
24. Biophysical Environment Description
25. Social Environment Description
26. Issues raised by Interested and Affected Parties: Notification letters were sent to IAP’s. Correspondence letters from landowner, municipal manager, Ward councilors and other I&AP’s are included in Appendix B and any issues raised are summarised in the table.
27. Photographic Record of the Borrow Pit
28. Locality Plan and Aerial Photo of the Borrow Pit showing the surrounding area
29. Mining Plan
30. Mining Plan Details and Summary of important Potential Impacts and Mitigation Measures
Photo 1 & 2: Existing Mining Surface
Photo 3 & 4: Current Mined area
Photo 5 & 6: Expansion area
Photo 7 & 8: Sensitive areas
Contact Information |
||
Contact |
Name |
Contact Number |
Landowner |
Communal land |
|
Municipal and Ward details |
|
|
Ward Councillor |
Albertinah Nokwetu Rotyi |
072 084 8022 |
Municipal Manager |
Cllr. Z Shasha |
047 874 0010 |
Location Details |
||
GPS Position: |
S31 56.909 , E27 34.106 |
|
Topography: |
Gentle eastern slope. |
|
Distance from Road: |
20m |
|
Physical Details |
||
Access: |
Adequate access from road. |
|
Fencing: |
None |
|
Borrow Pit Extent: |
120m x 90m |
|
Proposed Mining Direction: |
West |
|
Material Availability: |
20000m3 |
|
Biophysical Environmental Description |
||
Vegetation and Status |
Tsomo Grassland |
|
Present Land Use |
Urban Built-up |
|
CBA |
CBA 3 |
|
Land Use Type |
Communal |
|
Agricultural features |
Cultivated and Degraded |
|
Alien invasive species |
None |
|
Potential Faunal Habitat: |
Rocky habitat |
|
Natural Drainage and Erosion |
Present |
|
Rivers and Drainage Lines |
None |
|
Wetlands |
None |
|
Quaternary Catchment |
S50H |
|
Social Environment Description |
||
Heritage |
None affected |
|
Palaeontology |
None in Dolerite, Mudstones and Sandstones may have fossils |
|
Archaeology |
None observed |
|
Buildings and Structures |
Buildings in vicinity |
|
Issus raised by I & AP’s |
Refer to section |
Borrow Pit DR08041/5.9
Impact Assessment Mitigation |
|||
Issue |
Description |
Recommendation |
|
Visual Exposure: |
Visual exposure is likely to increase because of the close proximity to the road. |
Construct a berm between the road and the quarry. |
|
Natural Drainage and wetlands: |
None |
None |
|
Buildings: |
The quarry will become a danger to nearby residents if it is extended any closer towards them. |
Do not extend the quarry south, towards the nearby houses. |
|
Overhead Services: |
None |
None. |
|
Underground Services: |
None |
None |
|
Fences: |
None |
None |
|
Vegetation |
|
|
|
Fauna |
|
|
|
Agricultural features |
|
|
|
Grazing |
|
Recommendation |
|
Mining Plan Details |
|||
Proposed mining direction: |
West |
||
Area to be mined |
|
||
Projected volume |
|
||
Access road |
No access road needed. |
||
|
|
|
|
|
|
|
|
Contact Information |
||
Contact |
Name |
Contact Number |
Landowner |
Communal land |
|
Ward Councillor |
Dudu Kaspile |
072 9758 832 |
Municipal Manager |
Cllr. Z Shasha |
047 874 0010 |
Location Details |
||
GPS Position: |
S31 53 37.2 , E27 32 04.3 |
|
Topography: |
Gentle southern slope. |
|
Distance from Road: |
40m |
|
Physical Details |
||
Access |
No access road. |
|
Fencing |
None. |
|
Borrow Pit Extent |
140m x 140m |
|
Proposed Mining Direction |
East |
|
Material Availability |
50 000m3 |
|
Material Type |
Mudstone, sandstone |
|
Data Collection |
Residual outcrop |
|
Sample Collection and Tests Performed |
||
Mudstone |
2x (Particle size distribution, Atterberg Limits, Modified California Bearing Ratio) |
|
Sandstone |
Particle size distribution, Atterberg Limits, Modified California Bearing Ratio, LA Abrasion test, Wet and Dry Weathering Test. |
|
Biophysical Environmental Description |
||
Vegetation and Status |
Drakensberg Foothill Moist Grassland |
|
Present Land Use |
Natural |
|
CBA |
|
|
Land Use Type |
Communal |
|
Agricultural features |
None |
|
Alien invasive species |
None |
|
Potential Faunal Habitat: |
Grassland |
|
Natural Drainage and Erosion |
The soil is moderately well drained. There is a major erosion line 50m west of the quarry. |
|
Rivers and Drainage Lines |
Runoff collects in erosion lanes 50m east of the quarry and across the road, south of the quarry. |
|
Wetlands |
None |
|
Quaternary Catchment |
S50F |
|
Social Environment Description |
||
Heritage |
None affected |
|
Palaeontology |
None in Dolerite, Mudstones and Sandstones may have fossils |
|
Archaeology |
None observed |
|
Buildings and Structures |
Ruins in vicinity |
|
Issus raised by I & AP’s |
Refer to section |
Borrow Pit DR08041/14.4
Impact Assessment Mitigation |
|||
Issue |
Description |
Recommendation |
|
Visual Exposure: |
Visual exposure of the quarry could increase because of the removal of vegetation and the contract the quarry will create against the flat landscape. |
Do not remove vegetation or topsoil unnecessarily. |
|
Natural Drainage and wetlands: |
The natural drainage of the area around the quarry could be affected of mining is extended west, towards the erosion channel. |
Keep the quarry base as flat as possible to encourage even drainage. |
|
Buildings: |
None. |
None. |
|
Overhead Services: |
It would be dangerous to work too close to electricity lines towards the north-east of the quarry. |
Keep 30m clear of the electricity line. |
|
Underground Services: |
None. |
None. |
|
Fences: |
None. |
None. |
|
Vegetation |
|
|
|
Fauna |
|
|
|
Agricultural features |
None. |
None. |
|
Grazing |
None. |
None. |
|
Mining Plan Details |
|||
Proposed mining direction: |
Expand quarry east until too close to the electricity line, then expand north if more material in needed. |
||
Area to be mined |
|
||
Projected volume |
|
||
Access road |
An access road will be constructed. |
||
|
|
|
|
|
|
|
|
Contact Information |
||
Contact |
Name |
Contact Number |
Landowner |
Communal land |
|
Ward Councillor |
Zukiswa Qayiya |
082 838 0549 |
Municipal Manager |
Cllr. Z Shasha |
047 874 0010 |
Location Details |
||
GPS Position: |
S31 47 39.8 , E27 27 35.4 |
|
Topography: |
Moderately steep eastern slope. |
|
Distance from Road: |
400m |
|
Physical Details |
||
Access: |
400m access road in very poor condition. |
|
Fencing: |
None. |
|
Borrow Pit Extent: |
180m x 100m |
|
Proposed Mining Direction: |
North-west. |
|
Material Availability: |
30 000m3 |
|
Material Type: |
Mudstone, sandstone |
|
Data Collection: |
Residual outcrop |
|
Sample Collection and Tests Performed |
||
Mudstone |
2x (Particle size distribution, Atterberg Limits, Modified California Bearing Ratio) |
|
Sandstone |
Particle size distribution, Atterberg Limits, Modified California Bearing Ratio, LA Abrasion test, Wet and Dry Weathering Test. |
|
Biophysical Environmental Description |
||
Vegetation and Status |
Tsomo Grassland |
|
Present Land Use |
Natural |
|
CBA |
CBA 3 |
|
Land Use Type |
Communal |
|
Agricultural features |
Cultivated and Degraded |
|
Alien invasive species |
None |
|
Potential Faunal Habitat: |
Rocky habitat |
|
Natural Drainage and Erosion |
The soil is somewhat poorly drained, with deep pools collecting in the quarry base. |
|
Rivers and Drainage Lines |
There is a major eroded drainage line running from east to west, 220m north of the quarry. |
|
Wetlands |
None |
|
Quaternary Catchment |
S20C |
|
Social Environment Description |
||
Heritage : |
None affected |
|
Palaeontology: |
None in Dolerite, Mudstones and Sandstones may have fossils |
|
Archaeology: |
None observed |
|
Buildings and Structures |
Buildings in vicinity |
|
Issus raised by I & AP’s |
Refer to section |
Borrow Pit DR08041/28.8
Impact Assessment Mitigation |
|||
Issue |
Description |
Recommendation |
|
Visual Exposure: |
The quarry is slightly visible from the road. |
Bench the steep quarry faces in the quarry. |
|
Natural Drainage and wetlands: |
Pooled water in the quarry could become too deep and become a danger. |
Ensure water pools in the quarry base are not deeper than a meter. |
|
Buildings: |
None. |
None. |
|
Overhead Services: |
None. |
None. |
|
Underground Services: |
None. |
None. |
|
Fences: |
None. |
None. |
|
Vegetation |
|
|
|
Fauna |
|
|
|
Agricultural features |
None. |
None. |
|
Grazing |
None. |
None. |
|
Mining Plan Details |
|||
Proposed mining direction: |
North |
||
Area to be mined: |
|
||
Projected volume: |
|
||
Access road: |
Access road will be rehabilitated. |
||
|
|
|
|
|
|
|
|
Contact Information |
||
Contact |
Name |
Contact Number |
Landowner |
Communal land |
|
Ward Councillor |
Zukiswa Qayiya |
082 838 0549 |
Municipal Manager |
Cllr. Z Shasha |
047 874 0010 |
Location Details |
||
GPS Position: |
S31 44 59.6 , E27 26 33.3 |
|
Topography: |
Very gentle south-western slope. |
|
Distance from Road: |
50m |
|
Physical Details |
||
Access: |
No access road. |
|
Fencing: |
None. |
|
Borrow Pit Extent: |
60m x 30m |
|
Proposed Mining Direction: |
North. |
|
Material Availability: |
40 000m3 |
|
Material Type: |
Dolerite, Sandstone |
|
Data Collection: |
Residual outcrop |
|
Sample Collection and Tests Performed |
||
Dolerite |
2x (Particle size distribution, Atterberg Limits, Modified California Bearing Ratio) + LA Abrasion test, Wet and Dry Weathering Test. |
|
Sandstone |
Particle size distribution, Atterberg Limits, Modified California Bearing Ratio. |
|
Biophysical Environmental Description |
||
Vegetation and Status |
Tsomo Grassland |
|
Present Land Use |
Natural |
|
CBA |
CBA 3 |
|
Land Use Type |
Communal |
|
Agricultural features |
None |
|
Alien invasive species |
None |
|
Potential Faunal Habitat: |
Rocky habitat |
|
Natural Drainage and Erosion |
The soil is well drained. |
|
Rivers and Drainage Lines |
There is a major erosion channel 200m to the south, running from east to west. |
|
Wetlands |
None |
|
Quaternary Catchment |
S20C |
|
Social Environment Description |
||
Heritage |
None affected |
|
Palaeontology |
None in Dolerite, Mudstones and Sandstones may have fossils |
|
Archaeology |
None observed |
|
Buildings and Structures |
There is a small village 200 m East of the site |
|
Issus raised by I & AP’s |
Refer to section |
Borrow Pit DR08041/35.7
Impact Assessment Mitigation |
|||
Issue |
Description |
Recommendation |
|
Visual Exposure: |
The quarry faces are not high and the landscape is relatively flat. Creating high quarry faces would impact the area visually. |
|
|
Natural Drainage and wetlands: |
Variation in slope of the quarry floor and the surrounding general area could encourage erosion. |
Keep the slope of the quarry floor as close as possible to the slope of the general area. |
|
Buildings: |
None. |
None. |
|
Overhead Services: |
None. |
None. |
|
Underground Services: |
None. |
None. |
|
Fences: |
None. |
None. |
|
Vegetation |
|
|
|
Fauna |
|
|
|
Agricultural features |
None. |
None. |
|
Grazing |
None. |
None. |
|
Mining Plan Details |
|||
Proposed mining direction: |
North. |
||
Area to be mined |
3727m2 |
||
Projected volume |
|
||
Access road |
An access road will be created into the quarry. |
||
|
|
|
|
|
|
|
|
Contact Information |
||
Contact |
Name |
Contact Number |
Landowner |
Communal land |
|
Ward Councillor |
Zukiswa Qayiya |
082 838 0549 |
Municipal Manager |
Cllr. Z Shasha |
047 874 0010 |
Location Details |
||
GPS Position: |
S31 44 08.4 , E27 26 44.1 |
|
Topography: |
Flat landscape. |
|
Distance from Road: |
30m |
|
Physical Details |
||
Access: |
Adequate access road. |
|
Fencing: |
None. |
|
Borrow Pit Extent: |
200m x 70m |
|
Proposed Mining Direction: |
South |
|
Material Availability: |
50 000m3 |
|
Material Type: |
Dolerite |
|
Data Collection: |
Residual outcrop |
|
Sample Collection and Tests Performed |
||
Dolerite |
3x (Particle size distribution, Atterberg Limits, Modified California Bearing Ratio) + LA Abrasion test, Wet and Dry Weathering Test. |
|
Biophysical Environmental Description |
||
Vegetation and Status |
Tsomo Grassland |
|
Present Land Use |
Natural |
|
CBA |
CBA 3 |
|
Land Use Type |
Communal |
|
Agricultural features |
None |
|
Alien invasive species |
None |
|
Potential Faunal Habitat: |
Grassland |
|
Natural Drainage and Erosion |
Poor drainage. Slow sheetwash with bulk of water draining into the ground. |
|
Rivers and Drainage Lines |
None |
|
Wetlands |
None |
|
Quaternary Catchment |
S20C |
|
Social Environment Description |
||
Heritage |
None affected |
|
Palaeontology |
None in Dolerite, Mudstones and Sandstones may have fossils |
|
Archaeology |
None observed |
|
Buildings and Structures |
Buildings in vicinity |
|
Issus raised by I & AP’s |
Refer to section |
Borrow Pit DR08041/37.7
Impact Assessment Mitigation |
|||
Issue |
Description |
Recommendation |
|
Visual Exposure: |
High quarry faces and deepening the quarry should be avoided because of the contrast it will create between the quarry and the environment. |
Keep the quarry face as small as possible to blend in with the flat environment as much as possible. |
|
Natural Drainage and wetlands: |
None. |
None. |
|
Buildings: |
The quarry could expand too close (30m) to the nearby houses. |
Avoid expanding the quarry in the direction of the buildings (North-east). |
|
Overhead Services: |
None. |
None. |
|
Underground Services: |
None. |
None. |
|
Fences: |
None. |
None. |
|
Vegetation |
|
|
|
Fauna |
|
|
|
Agricultural features |
None. |
None. |
|
Grazing |
None. |
None. |
|
Mining Plan Details |
|||
Proposed mining direction: |
South |
||
Area to be mined |
17496m2 |
||
Projected volume |
|
||
Access road |
Adequate existing access road. |
||
Contact Information |
||
Contact |
Name |
Contact Number |
Landowner |
Communal land |
|
Ward Councillor |
Nozuko Sygnoria Mafanya |
073 555 3340 |
Municipal Manager |
Cllr. Z Shasha |
047 874 0010 |
Location Details |
||
GPS Position: |
S31 38 24.0 , E27 27 59.0 |
|
Topography: |
Gentle to moderate western slope. |
|
Distance from Road: |
20 m |
|
Physical Details |
||
Access: |
There is no access road to the quarry. |
|
Fencing: |
None. |
|
Borrow Pit Extent: |
40 m x 20 m |
|
Proposed Mining Direction: |
South or north |
|
Material Availability: |
20 000 m3 |
|
Material Type: |
Mudstone, sandstone |
|
Data Collection: |
Residual outcrop and stockpiles |
|
Sample Collection and Tests Performed |
||
Mudstone |
2x (Particle size distribution, Atterberg Limits, Modified California Bearing Ratio) + LA Abrasion test, Wet and Dry Weathering Test. |
|
Sandstone |
Particle size distribution, Atterberg Limits, Modified California Bearing Ratio, LA Abrasion test, Wet and Dry Weathering Test. |
|
Biophysical Environmental Description |
||
Vegetation and Status |
Tsomo Grassland |
|
Present Land Use |
Natural |
|
CBA |
CBA 3 |
|
Land Use Type |
Communal |
|
Agricultural features |
None |
|
Alien invasive species |
None |
|
Potential Faunal Habitat: |
Large Rocky Outcrop |
|
Natural Drainage and Erosion |
General sheetwash. No erosion. |
|
Rivers and Drainage Lines |
Present |
|
Wetlands |
None |
|
Quaternary Catchment |
S20C |
|
Social Environment Description |
||
Heritage |
None affected |
|
Palaeontology |
None in Dolerite, Mudstones and Sandstones may have fossils |
|
Archaeology |
None observed |
|
Buildings and Structures |
Scattered houses around the site |
|
Issus raised by I & AP’s |
Refer to section |
Borrow Pit DR08041/50.1
Impact Assessment Mitigation |
|||
Issue |
Description |
Recommendation |
|
Visual Exposure: |
Quarry extension will have a visual impact on the areas because of the contract between the baron quarry and the surrounding vegetation. |
The mining scar should be rehabilitated by replacing topsoil over the mining area after the quarry is used because of the proximity to local houses. |
|
Natural Drainage and wetlands: |
None. |
Avoid steep slopes when mining which leads to concentrated water flows and erosion. |
|
Buildings: |
Quarry will move too close to the surrounding houses if the proposed mining footprint is not mitigated. |
Keep a distance of 30 m from houses. |
|
Overhead Services: |
There is an overhead telephone line running north-east to south-west approximately 60 m north of the quarry. Keep at least 30 m clear of the overhead poles. |
Keep a distance of 30 m from overheads. |
|
Underground Services: |
None. |
None. |
|
Fences: |
There are fences surrounding house yards 60m on either side of the quarry (north and south), which should be stayed 30m clear of in terms of quarry expansion. |
None. |
|
Vegetation |
|
|
|
Fauna |
|
|
|
Agricultural features |
|
None. |
|
Grazing |
Informal grazing will be impacted. |
None. |
|
Mining Plan Details |
|||
Proposed mining direction: |
North, south and east (limited by houses and overheads). |
||
Area to be mined: |
6432m2 |
||
Projected volume: |
|
||
Access road: |
A short access road of approximately 30m should be constructed for the use of construction vehicles. |
||
|
|
|
|
|
|
|
|
Contact Information |
||
Contact |
Name |
Contact Number |
Landowner |
Communal land |
|
Ward Councillor |
Noloyiso Mto |
083 591 9238 |
Municipal Manager |
Cllr. Z Shasha |
047 874 0010 |
Location Details |
||
GPS Position: |
S31 49 59.366 , E27 43 33.517 |
|
Topography: |
Gentle eastern slope. |
|
Distance from Road: |
20m |
|
Physical Details |
||
Access: |
No access road. Quarry situated next to road. |
|
Fencing: |
None. |
|
Borrow Pit Extent: |
50m x 40m |
|
Proposed Mining Direction: |
South |
|
Material Availability: |
30 000m3 |
|
Material Type: |
Dolerite |
|
Data Collection: |
Residual outcrop |
|
Sample Collection and Tests Performed |
||
Dolerite |
3x (Particle size distribution, Atterberg Limits, Modified California Bearing Ratio) + LA Abrasion test, Wet and Dry Weathering Test. |
|
Biophysical Environmental Description |
||
Vegetation and Status |
Tsomo Grassland |
|
Present Land Use |
Natural |
|
CBA |
CBA 3 |
|
Land Use Type |
Communal |
|
Agricultural features |
Cultivated and Degraded |
|
Alien invasive species |
None |
|
Potential Faunal Habitat: |
Grassland |
|
Natural Drainage and Erosion |
General sheetwash forming shallow depressions in the ground which flows into the larger river to the east of the quarry. |
|
Rivers and Drainage Lines |
There is a big river 350m to the east of the quarry |
|
Wetlands |
None |
|
Quaternary Catchment |
S50G |
|
Social Environment Description |
||
Heritage |
None affected |
|
Palaeontology |
None in Dolerite, Mudstones and Sandstones may have fossils |
|
Archaeology |
None observed |
|
Buildings and Structures |
None |
|
Issus raised by I & AP’s |
Refer to section |
Borrow Pit DR08247/2.5
Impact Assessment Mitigation |
|||
Issue |
Description |
Recommendation |
|
Visual Exposure: |
Grasslands will be removed when quarry is extended. |
Replace topsoil on the worked areas of the quarry after use if it is known that is will not be expanded in that direction again. |
|
Natural Drainage and wetlands: |
Formation of erosion channels caused by removal of topsoil and vegetation. |
Avoid creating steep slopes and excavating too deep, creating structural damage to the ground. |
|
Buildings: |
None. |
None. |
|
Overhead Services: |
Excavation could become dangerous if the quarry is worked too close to the overhead services approximately 20m east of the quarry. |
Do not mine east so to keep clear of the overhead services. |
|
Underground Services: |
None. |
None. |
|
Fences: |
None. |
None. |
|
Vegetation |
|
|
|
Fauna |
|
|
|
Agricultural features |
None. |
None. |
|
Grazing |
None. |
None. |
|
Mining Plan Details |
|||
Proposed mining direction: |
South. |
||
Area to be mined |
|
||
Projected volume |
|
||
Access road |
None. |
||
|
|
|
|
|
|
|
|
|
|
|
|
Contact Information |
||
Contact |
Name |
Contact Number |
Landowner |
Communal land |
|
Ward Councillor |
Noloyiso Mto |
083 591 9238 |
Municipal Manager |
Cllr. Z Shasha |
047 874 0010 |
Location Details |
||
GPS Position: |
S31 51 39.678 , E27 41 3.320 |
|
Topography: |
The quarry is situated on the edge a ridge which drops of to the south of the quarry. |
|
Distance from Road: |
15m |
|
Physical Details |
||
Access: |
There is adequate access to the quarry. |
|
Fencing: |
None. |
|
Borrow Pit Extent: |
200m x 50m |
|
Proposed Mining Direction: |
West |
|
Material Availability: |
20 000m3 |
|
Material Type: |
Mudstone, sandstone |
|
Data Collection: |
Residual outcrop. |
|
Sample Collection and Tests Performed |
||
Mudstone |
Particle size distribution, Atterberg Limits, Modified California Bearing Ratio, LA Abrasion test, Wet and Dry Weathering Test. |
|
Sandstone |
2x (Particle size distribution, Atterberg Limits, Modified California Bearing Ratio) |
|
Biophysical Environmental Description |
||
Vegetation and Status |
Southern Mistbelt Forest |
|
Present Land Use |
Natural |
|
CBA |
CBA 1 |
|
Land Use Type |
Communal |
|
Agricultural features |
None |
|
Alien invasive species |
None |
|
Potential Faunal Habitat: |
Forest/Rocky |
|
Natural Drainage and Erosion |
Water drains south down the face of the ridge, collection in drainage channels in the topography. |
|
Rivers and Drainage Lines |
Runoff collects at the bottom of the ridge in larger drainage channels. |
|
Wetlands |
None |
|
Quaternary Catchment |
S50G |
|
Social Environment Description |
||
Heritage |
None affected |
|
Palaeontology |
None in Dolerite, Mudstones and Sandstones may have fossils |
|
Archaeology |
None observed |
|
Buildings and Structures |
None |
|
Issus raised by I & AP’s |
Refer to section |
Borrow Pit DR08247/8.5
Impact Assessment Mitigation |
|||
Issue |
Description |
Recommendation |
|
Visual Exposure: |
The quarry will become more visible from the road once expanded. |
Replace topsoil on areas in the quarry which will not be used in the future. |
|
Natural Drainage and wetlands: |
Mining over the edge of the ridge will cause an unstable slope which will encourage erosion channels to form on the steep slope. |
Water will drain sideways, along the road out of the quarry because of the berms to be kept against the quarry edge. |
|
Buildings: |
None. |
None. |
|
Overhead Services: |
None. |
None. |
|
Underground Services: |
None. |
None. |
|
Fences: |
None. |
None. |
|
Vegetation |
|
|
|
Fauna |
|
|
|
Agricultural features |
None. |
None. |
|
Grazing |
None. |
None. |
|
Mining Plan Details |
|||
Proposed mining direction: |
West, along the ridge edge. |
||
Area to be mined |
|
||
Projected volume |
|
||
Access road |
None. |
||
Contact Information |
||
Contact |
Name |
Contact Number |
Landowner |
Communal land |
|
Ward Councillor |
Noloyiso Mto |
083 591 9238 |
Municipal Manager |
Cllr. Z Shasha |
047 874 0010 |
Location Details |
||
GPS Position: |
S31 54 09.0 , E27 36 40.5 |
|
Topography: |
Flat to gentle slope. |
|
Distance from Road: |
55m |
|
Physical Details |
||
Access: |
No access road. There is also a fence along the road without a gate. |
|
Fencing: |
There is a fence along the road. No gate. |
|
Borrow Pit Extent: |
130m x 100m |
|
Proposed Mining Direction: |
South-west, along the road. |
|
Material Availability: |
50 000m3 |
|
Material Type: |
Mudstone, sandstone, dolerite |
|
Data Collection: |
Residual outcrop |
|
Sample Collection and Tests Performed |
||
Mudstone |
Particle size distribution, Atterberg Limits, Modified California Bearing Ratio, LA Abrasion test, Wet and Dry Weathering Test. |
|
Sandstone |
Particle size distribution, Atterberg Limits, Modified California Bearing Ratio. |
|
Dolerite |
Particle size distribution, Atterberg Limits, Modified California Bearing Ratio. |
|
Biophysical Environmental Description |
||
Vegetation and Status |
Tsomo Grassland |
|
Present Land Use |
Urban Built-up |
|
CBA |
CBA 3 |
|
Land Use Type |
Communal |
|
Agricultural features |
Cultivated and Degraded |
|
Alien invasive species |
None |
|
Potential Faunal Habitat: |
Grassland |
|
Natural Drainage and Erosion |
Slow sheetwash off a relatively flat environment. Water collects in the quarry forming shallow pools which slowly drain into the ground. |
|
Rivers and Drainage Lines |
None |
|
Wetlands |
Dam |
|
Quaternary Catchment |
S50G |
|
Social Environment Description |
||
Heritage |
None affected |
|
Palaeontology |
None in Dolerite, Mudstones and Sandstones may have fossils |
|
Archaeology |
None observed |
|
Buildings and Structures |
Houses 70m north-west of the quarry, across the road are existing houses forming a small settlement. |
|
Issus raised by I & AP’s |
Refer to section |
Borrow Pit DR08247/19.1
Impact Assessment Mitigation |
|||
Issue |
Description |
Recommendation |
|
Visual Exposure: |
The visual impact of the quarry could increase because of the thick grass growth around the quarry which creates a strong contrast with the baron quarry. |
Place topsoil in a stockpile and cover the worked areas of the quarry with it after the quarry has been used. Cover only quarry faces which are not to be used in the future. |
|
Natural Drainage and wetlands: |
None. |
None. |
|
Buildings: |
None. |
None. |
|
Overhead Services: |
None. |
None. |
|
Underground Services: |
None. |
None. |
|
Fences: |
Fences might be damaged when moved to gain access to the quarry. |
Fences which are removed in order to gain access to the quarry are to be fixed when quarry use is completed. Alternatively a gate could be installed in the fence. |
|
Vegetation |
|
|
|
Fauna |
|
|
|
Agricultural features |
None. |
None. |
|
Grazing |
None. |
None. |
|
Mining Plan Details |
|||
Proposed mining direction: |
South-west |
||
Area to be mined |
|
||
Projected volume |
|
||
Access road |
An access road should be constructed for the use of construction vehicles. |
||
|
|
|
|
|
|
|
|
Contact Information |
||
Contact |
Name |
Contact Number |
Landowner |
Communal land |
|
Ward Councillor |
Albertinah Nokwetu Rotyi |
072 084 8022 |
Municipal Manager |
Cllr. Z Shasha |
047 874 0010 |
Location Details |
||
GPS Position: |
S31 54 48.2 , E27 34 22.0 |
|
Topography: |
Flat plain |
|
Distance from Road: |
2m |
|
Physical Details |
||
Access: |
Adequate access road. |
|
Fencing: |
None. |
|
Borrow Pit Extent: |
100m x 40m |
|
Proposed Mining Direction: |
West |
|
Material Availability: |
50 000m3 |
|
Material Type: |
Dolerite, mudstone |
|
Data Collection: |
Residual outcrop and stockpiles |
|
Sample Collection and Tests Performed |
||
Dolerite |
Particle size distribution, Atterberg Limits, Modified California Bearing Ratio, LA Abrasion test, Wet and Dry Weathering Test. |
|
Mudstone |
2x (Particle size distribution, Atterberg Limits, Modified California Bearing Ratio) |
|
Biophysical Environmental Description |
||
Vegetation and Status |
0 |
|
Present Land Use |
Natural |
|
CBA |
CBA 3 |
|
Land Use Type |
Communal |
|
Agricultural features |
Cultivated and Degraded |
|
Alien invasive species |
Scattered |
|
Potential Faunal Habitat: |
Grassland |
|
Natural Drainage and Erosion |
Water seeps into the ground or flows away slowly in the form of controlled sheetwash. |
|
Rivers and Drainage Lines |
None |
|
Wetlands |
None |
|
Quaternary Catchment |
S50F |
|
Social Environment Description |
||
Heritage |
None affected |
|
Palaeontology |
None in Dolerite, Mudstones and Sandstones may have fossils |
|
Archaeology |
None observed |
|
Buildings and Structures |
None |
|
Issus raised by I & AP’s |
Refer to section |
Borrow Pit DR08247/23.2
Impact Assessment Mitigation |
|||
Issue |
Description |
Recommendation |
|
Visual Exposure: |
The quarry will become more visible from the road because of a treeline at the edge of the quarry which will be removed. |
Build up the steep three meter slope against the road to at least a 1/3 slope to correct the dangerous drop-off next to the road. Batter the future quarry working face to a 1/3 slope as well. |
|
Natural Drainage and wetlands: |
None. |
Avoid deepening the quarry which will lead to drainage problems. |
|
Buildings: |
None. |
None. |
|
Overhead Services: |
None. |
None. |
|
Underground Services: |
None. |
None. |
|
Fences: |
None. |
None. |
|
Vegetation |
|
|
|
Fauna |
|
|
|
Agricultural features |
None. |
None. |
|
Grazing |
None. |
None. |
|
Mining Plan Details |
|||
Proposed mining direction: |
West |
||
Area to be mined |
|
||
Projected volume |
|
||
Access road |
Adequate access road. |
||
|
|
|
|
|
|
|
|
Contact Information |
||
Contact |
Name |
Contact Number |
Landowner |
Communal land |
|
Ward Councillor |
Albertinah Nokwetu Rotyi |
072 084 8022 |
Municipal Manager |
Cllr. Z Shasha |
047 874 0010 |
Location Details |
||
GPS Position: |
S31 54 48.2 , E27 34 22.0 |
|
Topography: |
Flat plain |
|
Distance from Road: |
2m |
|
Physical Details |
||
Access: |
Adequate access road. |
|
Fencing: |
None. |
|
Borrow Pit Extent: |
100m x 40m |
|
Proposed Mining Direction: |
West |
|
Material Availability: |
50 000m3 |
|
Material Type: |
Dolerite, mudstone |
|
Data Collection: |
Residual outcrop and stockpiles |
|
Sample Collection and Tests Performed |
||
Dolerite |
Particle size distribution, Atterberg Limits, Modified California Bearing Ratio, LA Abrasion test, Wet and Dry Weathering Test. |
|
Mudstone |
2x (Particle size distribution, Atterberg Limits, Modified California Bearing Ratio) |
|
Biophysical Environmental Description |
||
Vegetation and Status |
0 |
|
Present Land Use |
Natural |
|
CBA |
CBA 3 |
|
Land Use Type |
Communal |
|
Agricultural features |
Cultivated and Degraded |
|
Alien invasive species |
Scattered |
|
Potential Faunal Habitat: |
Grassland |
|
Natural Drainage and Erosion |
Water seeps into the ground or flows away slowly in the form of controlled sheetwash. |
|
Rivers and Drainage Lines |
None |
|
Wetlands |
None |
|
Quaternary Catchment |
S50F |
|
Social Environment Description |
||
Heritage |
None affected |
|
Palaeontology |
None in Dolerite, Mudstones and Sandstones may have fossils |
|
Archaeology |
None observed |
|
Buildings and Structures |
None |
|
Issus raised by I & AP’s |
Refer to section |
Borrow Pit DR08247/Village
Impact Assessment Mitigation |
|||
Issue |
Description |
Recommendation |
|
Visual Exposure: |
The quarry will become more visible from the road because of a treeline at the edge of the quarry which will be removed. |
Build up the steep three meter slope against the road to at least a 1/3 slope to correct the dangerous drop-off next to the road. Batter the future quarry working face to a 1/3 slope as well. |
|
Natural Drainage and wetlands: |
None. |
Avoid deepening the quarry which will lead to drainage problems. |
|
Buildings: |
None. |
None. |
|
Overhead Services: |
None. |
None. |
|
Underground Services: |
None. |
None. |
|
Fences: |
None. |
None. |
|
Vegetation |
|
|
|
Fauna |
|
|
|
Agricultural features |
None. |
None. |
|
Grazing |
None. |
None. |
|
Mining Plan Details |
|||
Proposed mining direction: |
West |
||
Area to be mined |
|
||
Projected volume |
|
||
Access road |
Adequate access road. |
||
|
|
|
|
|
|
|
|
Contact Information |
||
Contact |
Name |
Contact Number |
Landowner |
Communal land |
|
Ward Councillor |
Nolundi Gertrude Futiso |
073 331 7035 |
Municipal Manager |
Cllr. Z Shasha |
047 874 0010 |
Location Details |
||
GPS Position: |
S31 51 22.136 , E27 38 34.865 |
|
Topography: |
Gentle western slope. |
|
Distance from Road: |
10m |
|
Physical Details |
||
Access: |
No access road. Quarry is next to the road. |
|
Fencing: |
None. |
|
Borrow Pit Extent: |
180m x 90m |
|
Proposed Mining Direction: |
North or east |
|
Material Availability: |
40 000m3 |
|
Material Type: |
Mudstone, sandstone |
|
Data Collection: |
Residual outcrop |
|
Sample Collection and Tests Performed |
||
Sandstone |
2x (Particle size distribution, Atterberg Limits, Modified California Bearing Ratio) |
|
Mudstone |
Particle size distribution, Atterberg Limits, Modified California Bearing Ratio, LA Abrasion test, Wet and Dry Weathering Test. |
|
Biophysical Environmental Description |
||
Vegetation and Status |
Drakensberg Foothill Moist Grassland |
|
Present Land Use |
Natural |
|
CBA |
|
|
Land Use Type |
Communal |
|
Agricultural features |
None |
|
Alien invasive species |
None |
|
Potential Faunal Habitat: |
Rocky habitat |
|
Natural Drainage and Erosion |
General sheetwash gathering in main eroded drainage channels. |
|
Rivers and Drainage Lines |
Runoff collects in an eroded drainage channel 100m west of the quarry, across the road. |
|
Wetlands |
None |
|
Quaternary Catchment |
S50F |
|
Social Environment Description |
||
Heritage |
None affected |
|
Palaeontology |
None in Dolerite, Mudstones and Sandstones may have fossils |
|
Archaeology |
None observed |
|
Buildings and Structures |
None |
|
Issus raised by I & AP’s |
Refer to section |
Borrow Pit DR08248/1.3
Impact Assessment Mitigation |
|||
Issue |
Description |
Recommendation |
|
Visual Exposure: |
Highly visible from the road. Quarry extension could increase the visibility of the quarry. |
Batter the quarry face to a 1/3 slope. |
|
Natural Drainage and wetlands: |
Loss of vegetation due to the expansion of the quarry could lead to a less controlled runoff and increased erosion if not managed. |
Flatten the quarry base or create a drainage basin to control runoff which could cause erosion if not controlled. |
|
Buildings: |
None. |
None. |
|
Overhead Services: |
None. |
None. |
|
Underground Services: |
None. |
None. |
|
Fences: |
None. |
None. |
|
Vegetation |
|
|
|
Fauna |
|
|
|
Agricultural features |
|
|
|
Grazing |
None. |
None. |
|
Mining Plan Details |
|||
Proposed mining direction: |
South-east and north-west |
||
Area to be mined |
|
||
Projected volume |
|
||
Access road |
No access road. The quarry is situated next to the road. |
||
|
|
|
|
|
|
|
|
.
Contact Information |
||
Contact |
Name |
Contact Number |
Landowner |
Communal land |
|
Ward Councillor |
Nolundi Gertrude Futiso |
073 331 7035 |
Municipal Manager |
Cllr. Z Shasha |
047 874 0010 |
Location Details |
||
GPS Position: |
S31 47 39.85 , E27 36 43.75 |
|
Topography: |
Flat plain |
|
Distance from Road: |
40m |
|
Physical Details |
||
Access: |
Access road is in poor condition. |
|
Fencing: |
None. |
|
Borrow Pit Extent: |
80m x 70m |
|
Proposed Mining Direction: |
East |
|
Material Availability: |
40 000m3 |
|
Material Type: |
Mudstone, sandstone |
|
Data Collection: |
Residual outcrop |
|
Sample Collection and Tests Performed |
||
Mudstone |
Particle size distribution, Atterberg Limits, Modified California Bearing Ratio, LA Abrasion test, Wet and Dry Weathering Test. |
|
Sandstone |
2x (Particle size distribution, Atterberg Limits, Modified California Bearing Ratio) |
|
Biophysical Environmental Description |
||
Vegetation and Status |
Tsomo Grassland |
|
Present Land Use |
Cultivated and Degraded |
|
CBA |
CBA 3 |
|
Land Use Type |
Communal |
|
Agricultural features |
Cultivated and Degraded |
|
Alien invasive species |
None |
|
Potential Faunal Habitat: |
Rocky habitat |
|
Natural Drainage and Erosion |
General sheetwash collecting in minor depressions in soil which then washes into the river 100m west of the quarry. |
|
Rivers and Drainage Lines |
There is a river collecting runoff 100m west of the quarry. |
|
Wetlands |
None |
|
Quaternary Catchment |
S50E |
|
Social Environment Description |
||
Heritage |
None affected |
|
Palaeontology |
None in Dolerite, Mudstones and Sandstones may have fossils |
|
Archaeology |
None observed |
|
Buildings and Structures |
Buildings in vicinity |
|
Issus raised by I & AP’s |
Refer to section |
Borrow Pit DR08248/11.2
Impact Assessment Mitigation |
|||
Issue |
Description |
Recommendation |
|
Visual Exposure |
Extension could increase the visibility of the quarry. |
Batter the quarry face back to a 1/3 slope. |
|
Natural Drainage and wetlands |
None. |
Avoid removing material close to the nearby river to the west of the quarry. |
|
Buildings |
None. |
None. |
|
Overhead Services |
None. |
None. |
|
Underground Services |
None. |
None. |
|
Fences |
None. |
None. |
|
Vegetation |
|
|
|
Fauna |
|
|
|
Agricultural features |
None. |
|
|
Grazing |
None. |
|
|
Mining Plan Details |
|||
Proposed mining direction: |
East |
||
Area to be mined |
|
||
Projected volume |
|
||
Access road |
Access road will be rehabilitated. |
||
|
|
|
|
|
|
|
|
Contact Information |
||
Contact |
Name |
Contact Number |
Landowner |
Communal land |
|
Ward Councillor |
Mayanzeke Yamile |
072 9758 813 |
Municipal Manager |
Cllr. Z Shasha |
047 874 0010 |
Location Details |
||
GPS Position: |
S31 46 11.732 , E27 35 35.143 |
|
Topography: |
Gentle north-eastern slope. |
|
Distance from Road: |
60m |
|
Physical Details |
||
Access: |
The access road into the borrow pit is adequate. |
|
Fencing: |
None. |
|
Borrow Pit Extent: |
70m x 50m |
|
Proposed Mining Direction: |
South-west towards the road. |
|
Material Availability: |
40 000m3 |
|
Material Type: |
Mudstone |
|
Data Collection: |
Residual outcrop |
|
Sample Collection and Tests Performed |
||
Mudstone |
3x (Particle size distribution, Atterberg Limits, Modified California Bearing Ratio) + LA Abrasion test, Wet and Dry Weathering Test. |
|
Biophysical Environmental Description |
||
Vegetation and Status |
Tsomo Grassland |
|
Present Land Use |
Natural |
|
CBA |
CBA 3 |
|
Land Use Type |
Communal |
|
Agricultural features |
None |
|
Alien invasive species |
None |
|
Potential Faunal Habitat: |
Grassland |
|
Natural Drainage and Erosion |
General sheetwash over a gentle slope. |
|
Rivers and Drainage Lines |
There is a natural drainage line 80m east of the quarry which collects the runoff of the immediate area. |
|
Wetlands |
None |
|
Quaternary Catchment |
S50E |
|
Social Environment Description |
||
Heritage |
None affected |
|
Palaeontology |
None in Dolerite, Mudstones and Sandstones may have fossils |
|
Archaeology |
None observed |
|
Buildings and Structures |
None |
|
Issus raised by I & AP’s |
Refer to section |
Borrow Pit DR08248/18.0
Impact Assessment Mitigation |
|||
Issue |
Description |
Recommendation |
|
Visual Exposure |
None. |
Avoid steel slopes and many stockpiles after the quarry has been used. |
|
Natural Drainage and wetlands |
None. |
Batter the slopes back to 1/3 and compact worked ground to avoid runoff collecting dirt and washing it into nearby river. |
|
Buildings |
None. |
None. |
|
Overhead Services |
None. |
None. |
|
Underground Services |
None. |
None. |
|
Fences: |
None. |
None. |
|
Vegetation |
|
|
|
Fauna |
|
|
|
Agricultural features |
None. |
None. |
|
Grazing |
None. |
None. |
|
Mining Plan Details |
|||
Proposed mining direction |
South-west towards the road. |
||
Area to be mined |
|
||
Projected volume |
|
||
Access road |
The access road is in good condition. |
||
|
|
|
|
|
|
|
|
Contact Information |
||
Contact |
Name |
Contact Number |
Landowner |
Communal land |
|
Ward Councillor |
Albertinah Nokwetu Rotyi |
072 084 8022 |
Municipal Manager |
Cllr. Z Shasha |
047 874 0010 |
Location Details |
||
GPS Position: |
S31 42.885 , E27 49.177 |
|
Topography: |
|
|
Distance from Road: |
|
|
Physical Details |
||
Access: |
Adequate access |
|
Fencing: |
None |
|
Borrow Pit Extent: |
90m x 40m |
|
Proposed Mining Direction: |
South and West |
|
Material Availability: |
20 000m3 |
|
Biophysical Environmental Description |
||
Vegetation and Status |
Tsomo Grassland |
|
Present Land Use |
Cultivated and Degraded |
|
CBA |
CBA 3 |
|
Land Use Type |
Communal |
|
Agricultural features |
Cultivated and Degraded |
|
Alien invasive species |
None |
|
Potential Faunal Habitat: |
Rocky habitat |
|
Natural Drainage and Erosion |
Some erosion present |
|
Rivers and Drainage Lines |
None |
|
Wetlands |
None |
|
Quaternary Catchment |
T12C |
|
Social Environment Description |
||
Heritage |
None affected |
|
Palaeontology |
None in Dolerite, Mudstones and Sandstones may have fossils |
|
Archaeology |
None observed |
|
Buildings and Structures |
Buildings |
|
Issus raised by I & AP’s |
Refer to section |
Borrow Pit DR08504/6.8
Impact Assessment Mitigation |
|||
Issue |
Description |
Recommendation |
|
Visual Exposure: |
The visual exposure will likely increase with the extension of the mine. |
Create a berm between the road and the borrow pit. |
|
Natural Drainage and wetlands: |
There are natural drainage ditches approximately 150m south-west and north-west of the quarry. |
Avoid moving mining closer than 30m of the drainage ditches. |
|
Buildings: |
None |
None |
|
Overhead Services: |
None |
None |
|
Underground Services: |
The road drainage might be affected if the quarry is extended too close to the road, south of the quarry. |
Avoid the road drainage pipe just south of the quarry. |
|
Fences: |
None. |
None. |
|
Vegetation |
|
|
|
Fauna |
|
|
|
Agricultural features |
|
|
|
Grazing |
|
Recommendation |
|
Mining Plan Details |
|||
Proposed mining direction: |
West and south |
||
Area to be mined |
|
||
Projected volume |
|
||
Access road |
No access road needed. |
||
|
|
|
|
|
|
|
|
· REGULATION 52 (2) (b): Assessment of the potential impacts of the proposed mining operation on the environment, socio- economic conditions and cultural heritage.
a) Description of the proposed mining operation.
i. The main activities (e.g. access roads, topsoil storage sites and any other basic prospecting design features )
ii. Plan of the main activities with dimensions
iii. Description of construction, operational, and decommissioning phases.
iv. Listed activities (in terms of the NEMA EIA regulations)
The following methodology is to be applied in the specialist studies for the assessment of potential impacts.
Criteria |
Explanation |
Nature of impact |
Review the type of effect that a proposed activity will have on the environment and should include “what will be affected and how?” |
Extent |
Indicate whether the impact will be: · (S) local and limited to the immediate area of development (the site); · (L) limited to within 5 km of the development; or · (R) whether the impact may be realized regionally, nationally or even internationally. |
Duration |
Review the lifetime of the impact, as being: · (V) very short term (0 - 1 years), · (S) short term (1 - 5 years), · (M) medium (5 - 15 years), · (L) long term (>15 years but where the impacts will cease after the operation of the site), or · (P) permanent. |
Intensity |
Establish whether the impact is destructive or innocuous and should be described as either: · (L) low (where no environmental functions and processes are affected) · (M) medium (where the environment continues to function but in a modified manner) or · (H) high (where environmental functions and processes are altered such that they temporarily or permanently cease). |
Probability |
Consider the likelihood of the impact occurring and should be described as: · (I) improbable (low likelihood) · (P) probable (distinct possibility) · (H) highly probable (most likely) or · (D) definite (impact will occur regardless of prevention measures). |
Status of the impact |
Description as to whether the impact will be positive (a benefit), negative (a cost), or neutral. |
Degree of confidence |
The degree of confidence in the predictions, based on the availability of information and specialist knowledge. This should be assessed as high, medium or low. |
Significance |
· (L) Low: Where the impact will not have an influence on the decision or require to be significantly accommodated in the project design · (M) Medium: Where it could have an influence on the environment which will require modification of the project design or alternative mitigation; · (H) High: Where it could have a ‘no-go’ implication for the project unless mitigation or re-design is practically achievable. |
|
Duration |
|||||
Permanent |
Long term |
Medium term |
Short term |
Very short term |
||
|
High Intensity |
|||||
Extent |
National |
High |
High |
High |
High |
Medium |
Regional |
High |
High |
High |
High |
Medium |
|
Local |
High |
High |
Medium |
Medium |
Medium |
|
Site specific |
Medium |
Medium |
Medium |
Medium |
Medium |
|
|
Medium Intensity |
|||||
Extent |
National |
High |
High |
High |
Medium |
Medium |
Regional |
High |
High |
High |
Medium |
Medium |
|
Local |
Medium |
Medium |
Medium |
Medium |
Medium |
|
Site specific |
Medium |
Medium |
Medium |
Medium |
Low |
|
|
Low Intensity |
|||||
Extent |
National |
Medium |
Medium |
Medium |
Medium |
Medium |
Regional |
Medium |
Medium |
Medium |
Medium |
Medium |
|
Local |
Medium |
Medium |
Medium |
Medium |
Low |
|
Site specific |
Medium |
Medium |
Medium |
Low |
Low |
Furthermore, the following must be considered:
1. Impacts should be described both before and after the proposed mitigation and management measures have been implemented.
2. All impacts should be evaluated for both the construction, operation and decommissioning phases of the project, where relevant.
3. The impact evaluation should take into consideration the cumulative effects associated with this and other facilities which are either developed or in the process of being developed in the region, if relevant.
4. Management actions: Where negative impacts are identified, specialists must specify practical mitigation objectives (i.e. ways of avoiding or reducing negative impacts). Where no mitigation is feasible, this should be stated and the reasons given. Where positive impacts are identified, management actions to enhance the benefit must also be recommended.
5. Monitoring: Specialists should recommend monitoring requirements to assess the effectiveness of mitigation actions, indicating what actions are required, by whom, and the timing and frequency thereof.
4.2 Identification of potential impacts
4.2.1 Possible impacts on biodiversity during mining construction and operations
Mining construction and operations can result in a range of negative impacts on terrestrial, marine and other aquatic ecosystems if not properly managed. Table 6 describes impacts that may potentially occur in the individual Borrow Pits (as per DMR guidelines) as well indicating the relevant EMP section in Appendix C. The predicted significance of these are summarised in Table 10, where SB = Significance BEFORE mitigation and SA = Significance AFTER mitigation. No significant ancillary linear infrastructure, such as roads, conveyors, power lines, pipelines and railways, which can impact on biodiversity and ecosystem services are expected other than minor access roads.
Refer to Table 6, Table 7, Table 10 and EMP guidelines Section.
Table 6: List of potential Impacts relating to the expansion of Borrow Pits
Impact |
Impact Description |
Relevant EMP Section describing Mitigation Measures (clickable link) |
Topography |
Alteration of topography through excavation of borrow pits and material removal |
|
Erosion |
Increased erosion risk resulting from removal of vegetation and stockpiling of topsoil |
|
Geology |
Permanent alteration of Geology through the removal of material from BP’s |
|
Soils |
Potential loss of soil from BP’s due to removal of topsoil and stockpiling for rehabilitation |
|
Surface Water |
Potential increased sediment load in runoff water from borrow pits and road works (Directly into Wetlands or Rivers) |
|
Groundwater |
Potential impacts on groundwater as a result of seep contamination with chemicals as well as fuels and lubricants required for operation of plant machinery |
|
Air quality/Dust |
Nuisance impacts of dust generated from excavating, blasting, crushing, stockpiling and road works on traffic on the roads and nearby residents. |
|
Vegetation |
Damage to or clearing of natural habitat, fencing off of areas and/or increased vehicular traffic, leading to loss of ecological communities, habitat for species, changes to ecosystem services, and fragmentation or isolation of habitats. |
|
Fire |
Increased risk of fire may interfere with natural fire regimes and adversely affect biodiversity. |
|
Alien species |
Introduction or spread of alien invasive species, feral fauna (including agricultural and commercial exotic species) and diseases of native flora and fauna. |
|
Habitat |
Habitat fragmentation, the disruption of migratory routes of faunal species or ecological corridors enabling ecological or evolutionary processes, collisions and road kills, dust generation and fallout. |
|
Fauna |
Potential small scale loss of fauna, particularly small animals confined to borrow pit, resulting from habitat loss. It is not anticipated that endangered or rare species will be present. |
|
Land capability/Agriculture |
No permanent significant impact on land capability is expected. |
|
Grazing |
Loss of grazing to Landowner as a result of Borrow Pit |
|
Fences |
Significant changes to landowners fencing as a result of BP expansion |
|
Noise |
Noise impacts during blasting and crushing activities are expected on nearby residents. |
|
Over/Under Services |
Blasting activities at the borrow pits may affect the nearby houses and infrastructure. |
|
Visual Impact |
An existing visual impact occurs at all the borrow pits as they are existing sites which have not been properly rehabilitated previously. After rehabilitation, the proposed activities may substantially improve the visual impact on the environment. |
|
Waste management |
Pollution of construction and domestic waste as well as waste water could lead to other visual impacts and loss of natural habitat. |
|
Socio-Economic Impacts |
Formalisation of the borrow pits would allow for regular routine maintenance of the roads that will benefit local communities and residents and all road users along the route. |
|
Archaeology |
(Depends on HIA) |
|
Heritage |
(Depends on HIA) |
|
Palaeontology |
(Depends on PIA) |
|
Buildings and Structures |
Impacts to Buildings and Structures in close proximity to the site |
Where issues of significant importance have been identified during the planning phase, appropriate measures have been implemented in the mine planning phase to accommodate them. In addition, during a site selection and feasibility phase, any Borrow Pits deemed to have any biophysical or social features that could not be successfully mitigated or avoided were not selected for this permitting process.
Whilst the residual Impact after the implementation of mitigation measures will be Low to Negligible on most Borrow Pits, the following Borrow Pits and Activities are deemed to have a Moderate or higher residual significance after implementation of the EMP and the implementation of the recommended mitigation measures:
Table 7: List of activities having Moderate or higher Significance AFTER mitigation.
Borrow Pit |
Impact |
Additional measures |
8041/5.9 |
|
|
8041/14.4 |
|
|
8041/28.8 |
|
|
8041/35.7 |
|
|
8041/37.7 |
|
|
8041/50.1 |
|
|
8247/2.5 |
|
|
8247/8.5 |
|
|
8247/19.1 |
|
|
8247/23.2 |
|
|
8247/Village |
|
|
8248/1.3 |
|
|
8248/11.2 |
|
|
8248/18.0 |
|
|
8504/6.8 |
|
|
Table 11 provides a list of activities associated with borrow pit mining that may be applicable for specific borrow pits.
No cumulative impacts are expected as a result of the expansion of the Borrow Pits, due to the limited disturbance footprint.
Potential impacts are summarised in Table 8 with recommended mitigation measures.
Table 8: Summary of potential impacts or heritage resources.
Borrow Pit |
Comment regarding Cumulative Impacts |
Comment regarding mitigation measures |
8041/5.9 |
|
|
8041/14.4 |
|
|
8041/28.8 |
|
|
8041/35.7 |
|
|
8041/37.7 |
|
|
8041/50.1 |
|
|
8247/2.5 |
|
|
8247/8.5 |
|
|
8247/19.1 |
|
|
8247/23.2 |
|
|
8247/Village |
|
|
8248/1.3 |
|
|
8248/11.2 |
|
|
8248/18.0 |
|
|
8504/6.8 |
|
4.2.8 Potential impacts on communities, individuals or competing land uses in close proximity.
These are summarised in Table 9 and recommended mitigation measures provided.
Table 9: Summary of potential impacts on communities
Borrow Pit |
Potential Impact |
Comment regarding potential impacts on communities in proximity |
8041/5.9 |
|
|
8041/14.4 |
|
|
8041/28.8 |
|
|
8041/35.7 |
|
|
8041/37.7 |
|
|
8041/50.1 |
|
|
8247/2.5 |
|
|
8247/8.5 |
|
|
8247/19.1 |
|
|
8247/23.2 |
|
|
8247/Village |
|
|
8248/1.3 |
|
|
8248/11.2 |
|
|
8248/18.0 |
|
|
8504/6.8 |
|
Refer to Appendix B for public participation notices and correspondence from IAP’s.
Refer to Appendix C for any specialist reports. No additional specialist reports were prepared.
Table 10: Summary indicating significance of potential impacts relating to mining activities (SB = Significance BEFORE Mitigation; SA = Significance AFTER Mitigation)
8248/1.3 |
8248/11.2 |
8248/18 |
8247/2.5 |
8247/8.5 |
8247/23.2 |
8247/village |
8247/19.1 |
8041/50.1 |
8041/37.7 |
8041/35.7 |
8041/28.8 |
8041/14.4 |
8041/5.9 |
8504/5.9 |
||||||||||||||||
Impact |
SB |
SA |
SB |
SA |
SB |
SA |
SB |
SA |
SB |
SA |
SB |
SA |
SB |
SA |
SB |
SA |
SB |
SA |
SB |
SA |
SB |
SA |
SB |
SA |
SB |
SA |
SB |
SA |
SB |
SA |
Topography |
M |
|
M |
|
M |
|
M |
|
M |
|
M |
L |
M |
L |
M |
L |
M |
L |
M |
L |
M |
L |
M |
L |
M |
L |
M |
L |
M |
L |
Erosion |
M |
|
M |
|
L |
|
M |
|
M |
|
L |
N |
M |
L |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
M |
L |
L |
N |
L |
N |
Geology |
L |
|
L |
|
M |
|
L |
|
M |
|
M |
L |
M |
L |
M |
L |
M |
L |
M |
L |
M |
L |
M |
L |
M |
L |
M |
L |
M |
L |
Soils |
L |
|
L |
|
L |
|
L |
|
L |
|
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
Surface Water |
L |
|
M |
|
L |
|
L |
|
M |
|
L |
N |
M |
L |
M |
L |
L |
N |
M |
L |
L |
N |
M |
L |
L |
N |
L |
N |
L |
N |
Groundwater |
L |
|
M |
|
L |
|
L |
|
L |
|
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
Air quality/Dust |
L |
|
L |
|
L |
|
L |
|
L |
|
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
Vegetation |
L |
|
L |
|
L |
|
L |
|
M |
|
M |
L |
L |
N |
L |
N |
L |
N |
L |
N |
M |
L |
M |
L |
L |
N |
L |
N |
L |
N |
Fire |
|
|
M |
|
M |
|
M |
|
M |
|
M |
L |
M |
L |
M |
L |
M |
L |
M |
L |
M |
L |
M |
L |
M |
L |
M |
L |
M |
L |
Alien species |
L |
|
L |
|
L |
|
L |
|
L |
|
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
Habitat |
L |
|
L |
|
L |
|
L |
|
L |
|
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
M |
L |
L |
N |
L |
N |
L |
N |
L |
N |
Fauna |
L |
|
L |
|
L |
|
L |
|
L |
|
L |
N |
L |
|
L |
N |
L |
N |
L |
N |
M |
L |
L |
N |
L |
N |
L |
N |
L |
N |
Land capability/Agriculture |
L |
|
L |
|
L |
|
L |
|
L |
|
L |
N |
L |
N |
M |
L |
M |
L |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
Grazing |
L |
|
L |
|
L |
|
L |
|
L |
|
L |
N |
L |
N |
M |
L |
M |
L |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
Fences |
L |
|
L |
|
L |
|
L |
|
L |
|
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
Noise |
L |
|
L |
|
L |
|
L |
|
L |
|
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
M |
L |
L |
N |
L |
N |
L |
N |
L |
N |
Over/Under Services |
L |
|
L |
|
L |
|
M |
|
L |
|
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
M |
L |
L |
N |
Visual Impact |
M |
|
M |
|
M |
|
M |
|
M |
|
M |
L |
M |
L |
M |
L |
M |
L |
M |
L |
M |
L |
M |
L |
M |
L |
M |
L |
M |
L |
Waste management |
L |
|
L |
|
L |
|
L |
|
L |
|
L |
N |
L |
|
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
Socio-Economic Impacts |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Archaeology |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Heritage |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Palaeontology |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Buildings |
L |
|
L |
|
L |
|
L |
|
L |
|
L |
N |
M |
L |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
L |
N |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
OVERALL |
|
L |
|
L |
|
|
|
L |
|
L |
|
N |
|
L |
|
L |
|
L |
|
L |
|
L |
|
L |
|
L |
|
L |
|
L |
Table 11: Listed Activities associated with Borrow Pits
Land clearance for mining purposes and/or ancillary activities (12, 13 and 14 of LN3) |
(LN3: 12) The clearance of an area of 300 square metres or more of vegetation where 75% or more of the vegetative cover constitutes indigenous vegetation. |
Within any critically endangered or endangered ecosystem listed in terms of section 52 of the NEMBA or prior to the publication of such a list, within an area that has been identified as critically endangered in the National Spatial Biodiversity Assessment 2004; |
(b) Within critical biodiversity areas identified in bioregional plans; |
||
(LN2: 13) The clearance of an area of 1 hectare or more of vegetation where 75% or more of the vegetative cover constitutes indigenous vegetation. |
Critical biodiversity areas and ecological support areas as identified in systematic biodiversity plans adopted by the competent authority. |
|
National Protected Area Expansion Strategy Focus areas. |
||
Outside urban areas, the following: (aa) A protected area identified in terms of NEMPAA, excluding conservancies; (bb) National Protected Area Expansion Strategy Focus areas; (cc) Sensitive areas as identified in an environmental management framework as contemplated in chapter 5 of the Act and as adopted by the competent authority; (dd) Sites or areas identified in terms of an International Convention; (ee) Core areas in biosphere reserves; (ff) Areas within 10 kilometres from national parks or world heritage sites or 5 kilometres from any other protected area identified in terms of NEMPAA or from the core area of a biosphere reserve; (gg) Areas seawards of the development setback line or within 1 kilometre from the high-water mark of the sea if no such development setback line is determined. iii. In urban areas, the following: (aa) Areas zoned for use as public open space; (bb) Areas designated for conservation use in Spatial Development Frameworks adopted by the competent authority or zoned for a conservation purpose; (cc) Areas seawards of the development setback line; (dd) Areas on the watercourse side of the development setback line or within 100 metres from the edge of a watercourse where no mentioned in Listing Notice 1. |
||
(LN3: 14) The clearance of an area of 5 hectares or more of vegetation where 75% or more of the vegetative cover constitutes indigenous vegetation |
All areas outside urban areas |
|
Land transformation for mining purposes (23, 24 of LN1; 15 of LN2) |
(LN1: 23) The transformation of undeveloped, vacant or derelict land to – (i) residential, retail, commercial, recreational, industrial or institutional use, inside an urban area, and where the total area to be transformed is 5 hectares or more, but less than 20 hectares, or (ii) residential, retail, commercial, recreational, industrial or institutional use, outside an urban area and where the total area to be transformed is bigger than 1 hectare but less than 20 hectares; - |
|
(LN1: 24) The transformation of land bigger than 1000 square metres in size, to residential, retail, commercial, industrial or institutional use, where, at the time of the coming into effect of this Schedule such land was zoned open space, conservation or had an equivalent zoning. |
||
Physical alteration of undeveloped, vacant or derelict land for residential, retail, commercial, recreational, industrial or institutional use where the total area to be transformed is 20 hectares or more; |
The decommissioning phase and closure of the quarry will involve removal of all debris and rehabilitation of areas not rehabilitated during the operational phases of the project. This will comprise the scarification of compacted areas, reshaping of areas, topsoiling and regenerating all prepared surfaces. The crusher and screening plants will be dissembled and all other infrastructural development such as haulage roads and stock pile areas will be rehabilitated.
Mine closure upon completion of the mining operation needs to be conducted in accordance to the objectives outlined in this report. The recommendations outlined in this report regarding precision blasting of quarry sides, topsoil replacement and re-vegetation all need to be complied with before mine closure can be considered.
The stages for rehabilitation, which need to be adhered to in order to meet the closure objectives, are as follows:
· Over the lifespan of the borrow pit, rehabilitation should commence initially in areas that are no longer being mined.
· If mining is expanded into the proposed extension, rehabilitation is the adjacent quarry should be commenced at least twelve months before commencement of that phase.
· The same strategy will be applied to future mining phases during the quarries lifespan.
· Upon completion of the final mining phase, final quarry rehabilitation (which will involve the rehabilitation of the areas currently being mined out and the storage and processing areas) will be completed within 12 months of operation closure.
· The proposed closure costs will be absorbed throughout the operation life of the quarry, as rehabilitation towards final closure objectives will be conducted continuously during mining operations.
In order to ensure that this EMP is effectively implemented, it is important that regular external audits are conducted.
The DRPW must appoint an independent ECO in order to oversee compliance with the EMP by undertaking monthly site inspections, quarterly audits and post construction/operation site visits. The audits shall aim at addressing environmental issues identified on site and to provide recommendations through the audit reports.
Audit Reports shall be provided to the DRPW, the Project Managers/Engineers and the DMR.
Item |
Requirements/ Conditions/Mitigation Measures |
Responsibility |
C |
Comment |
|
|
|
|
|
Environmental Authorization |
Notification of DEA&DP for any project changes/ deviations |
DRPW |
|
|
Notification of DEA &DP on ECO appointment |
DRPW |
|
|
|
Notification of DEA&DP on the commencement of the project |
|
|
||
Notification of Interested and Affected Parties in the vicinity of construction of commencement date and completion |
Contractor |
|
||
Copy of the Environmental Authorisation kept on site |
|
|||
Copy of the Construction EMP kept on site. |
|
|||
ECO’s monitoring and audit reports to be kept on site and be available for inspection by any relevant and competent authority |
|
|||
An environmental audit report must be submitted to DEA&DP upon completion of the construction and rehabilitation activities |
|
|
||
Environmental Agreement between DRPW and Contractor |
DRPW & Contractor |
|
|
|
|
|
|
|
|
Filing System for Environmental Documentation (Method Statements) |
Construction camp location and layout |
Contractor to submit a method statement of how he will handle the following |
|
|
Site Clearing |
|
|||
Handling of Hazardous Substances |
|
|||
Solid Waste Management |
|
|||
Handling of Wastewater |
|
|||
Erosion and Sediment Control |
|
|||
Fire Preventative Measures |
|
|||
Cement and Concrete Batching |
|
|||
Vegetation and Rehabilitation |
|
|||
|
|
|
|
|
Environmental Permitting Requirements |
National Water Act (No. 36 of 1998) – River crossing |
Contractor |
|
|
National Water (No. 36 of 1998) – Water abstraction |
|
|
||
Minerals and Petroleum Resources Development Act (No. 28 of 2002) – Borrow pits |
|
|
||
National Heritage Resources Act (No. 25 of 1999) |
|
|
||
National Environmental Management: Waste Act (No. 59 of 2008) – Waste Management |
|
|
||
|
|
|
|
|
Administration |
Organogram of contractor’s management structure available |
Contractor |
|
|
Has a ELO been appointed |
|
|||
Is the ELO permanently on site |
|
|||
Is the ELO submitting reports to the resident engineer on a monthly basis |
|
|||
|
|
|
|
|
Environmental Awareness Training |
Is the ELO appropriately trained to carry out training and mentoring on environmental management? |
Contractor |
|
|
Has Environmental Awareness Training (EAT) been carried out? |
|
|
||
Are records of EAT available |
|
|
||
|
|
|
|
|
Camp Depot |
Perimeter fencing erected and maintained |
Contractor |
|
|
Water available for human consumption at the site office and working areas points on site |
|
|||
Provision of appropriate ablution facilities |
|
|||
Housing of labour force |
|
|||
Storage of equipment and material at designated areas |
|
|||
|
|
|
|
|
Maintenance & Refuelling |
Dip trays for emergency repairs should be provided |
Contractor |
|
|
Suitable containers should be provided for collecting waste oil |
|
|
||
Vehicle servicing areas should be demarcated |
|
|
||
Leaking vehicles should be repaired immediately |
|
|
||
Refuelling areas should be designated |
|
|
||
Refuelling areas should be protected against pollution or surfaced |
|
|
||
Wastewater collection measures should be in place at vehicle washing areas |
|
|
||
|
|
|
|
|
Environmental management of Construction Activities |
Work restricted to 07h00 – 17h00 on weekdays |
Contractor |
|
|
Work restricted to 07h00 – 14h00 on Saturdays |
|
|
||
Work only allowed after hours in exceptional circumstances |
|
|
||
Notifications of interruption of service due to construction |
|
|
||
Inform nearby I&APs of noisy after hours work |
|
|
||
Inform landowners of any planned damage to properties |
|
|
||
Maintenance of photographic record of damage |
|
|
||
Compensation for damage to property |
||||
Demarcation of no-go areas and proper signage |
|
|
||
Designate smoking areas where smoking can occur in a controlled environment |
|
|
||
Prevent casual access to the construction site |
|
|
||
Contractor’s employees to be clearly identifiable |
|
|
||
Blasting to comply with relevant regulations |
|
|
||
No unemployed labour seekers to gather on site |
|
|
||
Inform employees of site specific environmental risks |
|
|
||
Cover material loads in transit |
|
|
||
Safety & Security |
Road users and pedestrians should be informed of alternative routes |
Contractor |
|
|
General compliance with the Occupational Health and Safety Act (No. 85 of 1993) |
|
|
||
Protection of workers during thunderstorms |
|
|
||
Periodic checking of excavations |
|
|
||
Appropriate traffic signs displayed |
|
|
||
|
|
|
|
|
Cement & Concrete Batching Plant |
Cement mixed in allocated areas |
|
|
|
Cleaning of cement mixing trays be done on proper cleaning trays |
Contractor |
|
|
|
Proper storage of cement bags before disposal |
|
|
||
Excess concrete should be disposed of at a licensed landfill site |
|
|
||
Cement laden runoff from concrete stockpile should be controlled |
|
|
||
|
|
|
|
|
Storage of Hazardous Substances |
Suitable storage of hazardous substances |
Contractor |
|
|
Hazard signs indicating the hazardous substance at storage site |
|
|
||
Petroleum tanks contained in a bund wall, which is more than 10% its capacity |
|
|
||
Material and safety data sheets should be readily available for hazardous substances |
|
|
||
Run-off from storage site should be contained |
|
|
||
Hazardous Waste |
Proper collection and disposal of contaminated soils at approved facilities/site |
Contractor |
|
|
Proper storage of used oils before disposal |
|
|
||
Appropriate disposal of hazardous waste at approved landfill sites |
|
|
||
Unused or rejected bituminous products should be returned to the supplier not disposed or buried in a landfill site. |
|
|
||
Waste disposal tracking records |
|
|
||
|
|
|
|
|
Wastewater |
Oil separation/settlement system should be placed for water run-off from washing areas, workshops, fuel depots to pass through |
Contractor |
|
|
|
|
|||
Wastewater shouldn’t be disposed into municipal stormwater system |
|
|
||
Conservancy tanks should be used for wastewater collection |
|
|
||
|
|
|
|
|
Private Property Access and Security |
Notify landowners prior to undertaking construction work |
Contractor |
|
|
Access to adjacent private properties prohibited except under official business |
|
|
||
|
|
|
|
|
Rehabilitation |
Suitable rehabilitation of cut and fill slopes |
Contractor |
|
|
Topsoil replacement |
||||
All construction residue removed after construction |
||||
All structures should be removed |
||||
Contaminated soil should be removed and properly disposed |
||||
Scarify areas compacted by vehicle movements |
||||
Rehabilitation plan should be in place |
||||
Borrow pits reshaped to even surfaces and closed off |
||||
|
|
|
|
|
Compliance and Penalties |
Non-compliance directive been issued to the contractor |
ECO |
|
|
Non-compliance directive been recorded in a dedicated register and reported in monthly reports and at monthly site meetings |
ELO |
|
||
Has a penalty for non-compliance been implemented by engineer? |
RE/ELO |
|
The Quantum of Financial Provision shall be calculated using DMR’s Guideline Document for the Evaluation of the Quantum of Closure-Related Financial Provided by a mine (2005). In terms of the guideline the Borrow Pits classify as class C mines (low risk) of low to moderate sensitivity.
Rehabilitation of the borrow pit upon mining completion will include the clearing up of access roads, mining infrastructure and the site office. It should be noted at this stage that rehabilitation should be commenced immediately on sites that are no longer mined or to be mined in the following three years.
Th Quantum calculation is as follows:
Component |
Quantity |
Rate |
Amount |
Consultants fees to assist the DMR with rehabilitation recommendations |
|
|
|
Topsoil acquisition to rehabilitate (per m²) |
|
R1.50 m² |
|
5% allocation for sundries |
|
|
|
Contingency amount (10%) |
|
|
|
Total: |
|
|
|
Establishment of rehabilitation personnel and equipment |
|
|
|
De-establishment of plant (per move) |
|
R2 000 |
|
Levelling of worked areas as per recommendations of the EMP |
|
|
|
Topsoiling (per m²) |
|
R1.50/m² |
|
Hydroseeding |
|
R1.00/m² |
|
Fencing of mine and final levelling of mining footprint |
|
|
|
10% contingency amount (10%) |
|
|
|
Total: |
|
|
|
(Indicate that the required amount will be provided should the right be granted).
Need letters or signatures.
Herewith I, the person whose name and identity number is stated below, confirm that I am the person authorised to act as representative of the applicant in terms of the resolution submitted with the application, and confirm that the above report comprises EIA and EMP compiled in accordance with the guideline on the Departments official website and the directive in terms of sections 29 and 39 (5) in that regard, and the applicant undertakes to execute the Environmental management plan as proposed. |
|
Full Names and Surname |
|
Identity Number |
|
(Provide the information referred to in the guideline)
Refer to adverts and correspondence
Information was provided, including a cover letter and Background Information Document, to the persons listed in Table 1. A link to the report on the website was also provided.
Table 12: List of which parties identified in 7.1 above that were in fact consulted, and which were not consulted
Person(s) |
Contact Details |
Position |
Nolundi Gertude Futiso |
073 331 7035 |
Ward Councillor |
Mayanzeke Yamile |
072 9758 813 |
Ward Councillor |
Noloyiso Mto |
083 591 9238 |
Ward Councillor |
Albertinah Nokwetu Rotyi |
072 084 8022 |
Ward Councillor |
Nozuko Sygnoria Mafanya |
082 838 0490 |
Ward Councillor |
Zukiswa Qayiya |
082 828 0549 |
Ward Councillor |
Dudu Kaspile |
072 9758 818 |
Ward Councillor |
|
|
Municipal Manager |
|
|
|
|
|
|
|
|
|
Table 13: Summary table (refer to letters in Appendices)
Person (s) |
Issue |
Comment |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
See above
Refer to appendices
Any issues raised have been addressed by altering the mine layout plan if necessary and/or are covered in the EMP section. Residual issues are as follow:
Refer to EMP
(Describe how the applicant intends to inform his or her employees of any environmental risk which may result from their work).
Refer to EMP
(Describe the manner in which the risk must be dealt with in order to avoid pollution or degradation of the environment)
Before the commencement of any work on site, the Contractor's site management staff shall attend an environmental awareness training session, of at least one-hour duration, presented by the ECO and RE. The Contractor shall liaise with the ECO prior to the commencement date to fix a date and venue for the training session. The Contractor shall provide a suitable venue with facilities, and ensure that the specified employees attend the training session.
The information presented at the course shall be communicated by the Contractor to the rest of his employees on the site, to any new employees coming onto site after the initial training course and to his/her suppliers. The presentation shall be conducted, as far as is possible, in the employees’ language of choice. As a minimum, training shall include:
• Explanation of the importance of complying with the EMP;
• Discussion of the potential environmental impacts of construction activities;
• Explanation of the management structure of individuals responsible for matters pertaining to the EMP;
• Explanation of the manner in which environmental risks and impacts must be dealt with in order to avoid pollution and the degradation of the environment;
• Employees’ roles and responsibilities, including emergency preparedness;
• Explanation of the mitigation measures that must be implemented when carrying out their activities;
• Explanation of the specifics of the EMP; and
• Explanation of the Environmental Do’s and Don’ts (below).
The Contractor shall keep records of all environmental training sessions, including names of attendees, dates of their attendance and the information presented to them. Records of environmental training sessions shall be submitted to the ECO.
Appendix A: Environmental Management Plan
Appendix B: Detailed Impact Assessment scores
Appendix C: Potential Species list
Appendix D: References
Appendix E: Interested and Affected Party Correspondence
Appendix F: Borrow Pit Geological Test Results
This Environmental Management Plan (EMP) contains guidelines, operating procedures and rehabilitation control requirements, which will be binding on the holder of the mining right after approval of the EMP.
The impacts identified and listed in Table 1 of the previous chapter will be managed / controlled as set out under mitigating measures and as detailed in this part for the more significant impacts during the operational phase.
· The layout plans required for EMP approval are included in Section 3 above of this report.
· The mining area must be clearly demarcated by means of beacons at its corners. These beacons must be firmly erected and maintained in their correct positions throughout the life of the mine.
· The existing quarry scar should be shaped so that the working behaves as a localised sump to ensure run-off is contained after wet periods thereby reducing siltation of the drainage channel downstream.
· Areas not earmarked for future mining activities should be rehabilitated with topsoil to encourage vegetation regrowth. The old workings and stockpiles should be levelled and excavation scars covered with topsoil to encourage grass regrowth and rehabilitation of land surface.
· No disused stockpiles should occur / be placed outside of the mining footprint upon project completion.
· Future mine faces need not be rehabilitated but should be sloped to prevent unnecessary erosion.
· A stockpile should be left within the mine footprint for future patch gravelling and road repair programmes outside this contract.
· Note that the stockpile should not be placed in the lowest part of the quarry where there is a possibility of it being partly or completely submerged by accumulating water.
· It is recommended that the quarry be extended eastern and western directions to avoid moving too close to the housing settlement to the south of the quarry.
· Working hours shall be deemed as normal working hours of 07:00 to 17:00, Mondays to Fridays, 07:00 to 13:00 on Saturdays, excluding public holidays. These conditions can, however, be changed after written communication with the Regional Manager (DME).
The environment affected by the mining operations shall be rehabilitated by the holder, as far as is practicable, to its natural state or to a predetermined and agreed to standard or land use which conforms with the concept of sustainable development. The affected environment shall be maintained in a stable condition that will not be detrimental to the safety and health of humans and animals and that will not pollute the environment or lead to the degradation thereof.
It is the responsibility of the holder of the mining right to ensure that the contractor on the site and the employees are capable of complying with all the statutory requirements, which must be met in order to mine, which includes the implementation of this EMP.
If operations are to be conducted in an area that has already been disturbed, the holder must reach specific agreement with the Regional Manager concerning the responsibilities imposed upon themselves pertaining to the rehabilitation of the area and the pollution control measures to be implemented.
The EMP recommendations contained in the Mitigation section of this report should be read and applied in conjunction with the measures mentioned throughout this report.
· The Contractor must ensure that an emergency preparedness plan is in place in order to fight accidental fires or veld fires, should they occur. The adjacent land owners/users/managers should also be informed or otherwise involved.
· Enclosed areas for food preparation should be provided and the Contractor must strictly prohibit the use of open fires for cooking and heating purposes.
· The use of branches of trees and shrubs for fire-making must be strictly prohibited.
· The Contractor should take all reasonable and active steps to avoid increasing the risk of fire through their activities on-site. No fires may be lit except at places approved by the EO.
· The Contractor must ensure that the basic fire-fighting equipment is to the satisfaction of the Local Emergency Services.
· The Contractor must supply all living quarters, site offices, kitchen areas, workshop areas, materials, stores and any other relevant areas with tested and approved fire-fighting equipment.
· Fires and “hot work” must be restricted to demarcated areas.
· A braai facility may be considered at the discretion of the Contractor and in consultation with the ECO. The area must be away from flammable stores. All events must be under management’s supervision and a fire extinguisher will be immediately available. “Low-smoke” fuels must be used (e.g., charcoal) and smoke control regulations, if applicable, must be considered.
· The Contractor must take precautions when working with welding or grinding equipment near potential sources of combustion. Such precautions include having a suitable, tested and approved fire extinguisher immediately at hand and the use of welding curtains.
· Sufficient topsoil must be stored for later use during decommissioning, particularly from outcrop areas.
· Topsoil shall be removed from all areas where physical disturbance of the surface will occur.
· All available topsoil shall be removed after consultation with the Botanist and horticulturalist prior to commencement of any operations.
· The removed topsoil shall be stored on high ground within the mining footprint outside the 1:50 flood level within demarcated areas.
· Topsoil shall be kept separate from overburden and shall not be used for building or maintenance of roads.
· The stockpiled topsoil shall be protected from being blown away or being eroded. The application of a suitable grass seed/runner mix will facilitate this and reduce the minimise weeds.
If a grave site is uncovered or discovered before the commencement of work, all work in the immediate vicinity MUST be stopped and the Engineer informed. The following are to be adhered to upon discovery of graves during mining activities and the management of grave sites:
· Topsoil shall be removed from all areas where physical disturbance of the surface will occur.
· All available topsoil shall be removed after consultation with the Regional Manager prior to commencement of any operations.
· The removed topsoil shall be stored on high ground within the mining footprint outside the 1:50 flood level within demarcated areas (Appendix 1)
· Topsoil shall be kept separate from overburden and shall not be used for building or maintenance of roads.
· The stockpiled topsoil shall be protected from being blown away or being eroded. The application of a suitable grass seed/runner mix will facilitate this and reduce the minimise weeds.
Existing roads are adequate, but if future mining operations do require the construction of roads, the following must be adhered to:
· The access to the mining area must be established in accordance with the authorisation from the various government departments (Department of Economic Affairs Environment and Tourism (DEAET), Department of Roads and Transport (DRT) and the Department of Minerals and Energy) and existing roads shall be used as far as practical.
· Should a portion of the access road be newly constructed the following must be adhered to:
· The erection of gates in a fence line and the open and closed status of gates shall be clarified in consultation with the landowner and maintained throughout the operational period.
· No other routes shall be used by vehicles or personnel for the purpose of gaining access to the site.
· Newly constructed access roads shall be adequately maintained so as to minimise dust, erosion or undue surface damage.
· The liberation of dust into the surrounding environment shall be effectively controlled by the use of inter alia, water spraying and /or other dust-allaying agents. The speed of haul trucks and other vehicles must be strictly controlled to avoid dangerous conditions, excessive dust or excessive deterioration of the road being used.
· The access roads to the quarry sites must be strictly maintained during the operation process. Sections of the access road that erodes during the mining process shall be suitably rehabilitated upon completion of the project.
Whenever any excavation is undertaken, the following procedures shall be adhered to:
· The construction site will not be left in any way to deteriorate into an unacceptable state.
· The excavated area must serve as a final depositing area for waste rock and overburden during the rehabilitation process.
6. Blasting should be designed based on a risk level of 0.03.
7. Maximum charge per delay must be restricted to 112 kg.
8. Stemming of blast holes should be taken to a maximum to reduce the possibility of fly rock.
9. Blasting mats / timber boarding or other means must be used for larger blasts to reduce safety and noise impacts.
10. Vibrometers should adjacent to the water reservoir and the nearest dwelling to record peak particle velocities for each blast.
11. Chemicals used in blasting must not be allowed to leach into groundwater.
12. Neighboring communities and relevant authorities must be notified by the Contractor 24 hours prior to blasting.
13. Controlled blasting techniques must be used during blasting work to minimize any damage to the final profile.
14. Spillage of material from surface excavation, whether by blasting or other means, must be limited by the Contractor. All necessary precautions including covering the rock prior with sufficient loos material prior to blasting, if necessary, should be used to prevent the blasted material from being thrown.
· Processing areas and waste piles shall be established within a clearly demarcated area.
· This area will include the footprint where commercial stockpiles will be positioned during the daily operation of the quarry. Monitoring and supervision of the processing area will be controlled by the office, which will be situated adjacent to these workings.
1. Where possible, laborers from the nearby communities should be appointed.
2. If applicable, suitable accommodation and security must be provided during construction and by the contractors for their workers.
3. If applicable, the contractor in conjunction with the client should develop policies and procedures with regard to employee accommodation.
4. Management commitments will be implemented by the contractor with respect to noise, dust, safety and blasting. The contractor shall furthermore ensure that their staff is trained regarding the Safety and Health Environmental (SHE) procedures that are to be followed on site. Penalty clauses for transgressions will also be considered in this regard.
5. The contractor must ensure that the standard safety measures as stipulated in the Mine, Health and Safety Act are complied with.
6. All employees and contractors must be briefed about appropriate road safety measures. Penalties and disciplinary actions will be imposed on employees and contractors for non-compliance with safety, environmental and social measures.
7. Complaints should be dealt with timeously. This requires the joint formulation of compliance contract and grievance procedures and project-specific communication mechanisms (eg the keeping of complaints registers).
8. Inadvertent access to dangerous construction areas must be prevented. Such areas must be strictly controlled using fencing, warning signs and access control.
9. The contractor must implement strict access control measures wherever @outsider@ are accommodated in construction camps. Only authorized personnel are allowed at the camp site.
10. Workers may only be housed in surrounding villages if the relevant authorities in the villages are satisfied with this arrangement.
The overall objective of the rehabilitation plan is to minimize adverse environmental impacts associated with the quarrying activities whilst maximizing the future utilization of the property. The idea, therefore, is to leave the mined out quartzitic sandstone quarry in a conditions that reduces many of the negative impacts associated with a mined out area. Significant aspects to be borne in mind in this regard is visibility of the mining scar, revegetation of the mining footprint and stability and environmental risk in an old mine environment. The depression and immediate area of the working must also be free of alien vegetation. Alternative land uses such as agriculture, housing, waste disposal or alternative mining applications are unsuitable for a post-mining scenario.
The proposed quarrying and rehabilitation procedures have been formulated to optimise the extraction of raw material while creating stable quarry sides that will not present an unreasonable safety risk once mine closure has been approved. Mining operations will be conducted in stages corresponding to the creation of precision blasted quarry sides and a bench at the base of the working. Each phase will be mined over a five year period and will be audited on an annual basis.
Additional broad rehabilitation strategies / objectives include the following:
· All infrastructure, equipment, plant and other items used during the mining period will be removed from the site (section 44 of the MPRDA).
· Waste material of any description, including scrap, rubble and tyres, will be removed entirely from the mining area and disposed of at a recognised landfill facility. It will not be permitted to be buried or burned on site.
· Final rehabilitation shall be completed within a period specified by the Regional Manager.
General plans outlining the mining details indicate the proposed progressive development of the quarry is included in Appendix 1.
Topsoil and subsoil will be stripped separately from the area of each year of mining. The topsoil and subsoil removed from the initial cut will be stockpiled separately and only used in rehabilitation work towards the end of the quarrying operation. This is in contract to the gravel mining operation where rehabilitation and topsoil replacement was earmarked at the completion of each phase.
Stripped overburden will be backfilled into the worked out areas and used to soften quarry slopes where needed. Stripped topsoil will be spread over the re-profiled areas to an adequate depth to encourage plant regrowth. The vegetative cover will be stripped with the thin topsoil layer to provide organic matter to the relayed material and to ensure that the seed store contained in the topsoil is not diminished. Reseeding may be required should the stockpiles stand for too long and be considered barren from a seed bank point of view. Stockpiles should ideally be stored for no longer than a year.
The topsoil and overburden will be keyed into the reprofiled surfaces to ensure that they are not eroded or washed away. The topsoiled surface will be left fairly rough to enhance seedling establishment, reduce water run-off and increase filtration. Latent impacts will be monitored by the Department of Minerals and Energy over a five year period after quarry operations cease before a final mine closure certificate can be granted by the DME.
All prepared surfaces will be seeded with suitable grass species to provide an initial ground cover and stabilize the soil surface. Whilst Chloris gayana and Themeda triandra are the preferred species to use for revegetation by the quarry owner, other species that can work in this regard include the following and can either be collected on site (using a mower or by hand) or purchased from a relevant local seed supplier:
Botanical name |
Common name |
Chloris gayana |
Rhodes grass |
Chloris virgata |
Feather-top Chloris |
Cynodon dactylon |
Couch grass |
Eragrostis curvula |
Weeping love grass |
Melinis repens |
Natal red top |
Panicum coloratum |
Small Buffalo Grass |
Panicum deustum |
Broad-leaved Panicum |
Stenotaphrum secundatum |
Buffalo turf grass |
Themeda triandra |
Rooigras |
The overall revegetation plan will, therefore, be as follows:
· Ameliorate the aesthetic impact of the site
· Stabilise disturbed soil and rock faces
· Minimize surface erosion and consequent siltation of natural water course located on site
· Control wind-blown dust problems
· Enhance the physical properties of the soil
· Re-establish nutrient cycling
· Re-establish a stable ecological system
Every effort must be made to avoid unnecessary disturbance of the natural vegetation during quarrying operations.
To control the drainage and erosion at site the following procedures will be adopted:
· Areas where mining is completed should be rehabilitated immediately.
· Areas to be disturbed in future mining operations will be kept as small as possible (i.e. conducting the quarrying operations in phases), thereby limiting the scale of erosion.
· Quarry slopes will be profiled to ensure that they are not subjected to excessive erosion but capable of drainage run-off with minimum risk of scour (maximum 1:3 gradient).
· Diversion channels will be constructed ahead of the open cuts as well as above emplacement areas and stockpiles to intercept clean run-off and divert it around disturbed areas into the natural drainage system downstream of the quarry.
· Quarrying will be confined to the existing mining footprint as per the existing gravel mining license.
· All existing mined areas will be revegetated to control erosion and sedimentation
· Existing vegetation will be retained as far as possible to minimize erosion problems.
The overall visual impact of the proposed mining operations will be minimised by the following mitigating measures:
Adequate management, maintenance and monitoring will be carried out annually by the applicant to ensure successful rehabilitation of the property until a closure certificate is obtained.
To minimise adverse environmental impacts associated with quarrying operations it is intended to adopt a progressive rehabilitation programme, which will entail carrying out the proposed rehabilitation procedures concurrently with quarrying activities.
· Regular monitoring of all the environmental management measures and components should be carried out by the holder of the mining permit to ensure that the provisions of this programme are adhered to.
· Ongoing and regular reporting of the progress of implementation of this programme must be done. An environmental audit shall be carried out by an independent consultant on an annual basis. The findings of this audit must be reported back to the Regional Director. This should include visual inspections on erosion and physical pollution.
· A Performance Assessment Report must be submitted to the Regional Director after each audit as per Regulation 55 of the MPRDA.
· Any change to the mining process needs to be documented during the audit process and the necessary changes recorded to facilitate future mining operations and audit investigations.
· Adherence to the impacts associated with the proposed mining operations, as outlined in the Impact Assessment section of this report, must be addressed in the annual audit.
· Inspections and monitoring shall be carried out on both the implementation of the programme and the impact on plant and animal life.
· Adherence to concerns raised by IAP’s during the public participation process should receive special attention during the environmental audit and correspondence to the various IAP’s should be made on an annual basis in this regard.
The on-site manager is responsible for the training of all staff. Regular training sessions are recommended and shall include basic environmental awareness. It is important that training registers are kept as proof for auditing purposes. The following environmental training should be included:
· The importance of conformance with all environmental policies.
· Environmental impacts of the proposed activities (actual or potential).
· Improved personal performance and the environmental benefits thereof.
· Roles and responsibilities of achieving conformance with environmental policy and procedures.
· Associated procedures and emergency preparedness and response requirements.
· Potential consequences of departure from specified operating procedures.
· Mitigation measures required to be implemented when carrying out their work activities.
a) The on-site manager must maintain a register of all environmental incidents occurring as a result of the associated activities in terms of the contract. The following environmental incidents must be included:
· Fires
· Accidents
· Hazardous material spills that contaminate soil or water resources
· Non-compliance with applicable legislation
· Non-compliance with this EMP.
b) Environmental incidents must be investigated be the competent person and the environmental incident report will be forwarded to the permit holder. Incident reports should be presented within five working days of the incident. The environmental incident report must include:
· A description of the incident.
· Actions taken to contain any damage to the environment, personnel or the public.
· Actions taken to repair / remediate any damage.
c) The prescription of additional measures that may be required to remediate damage that results from the incident as well as prevention of similar incidents occurring in the future.
When the holder of a mining right intends closing the mining operation, an environmental risk report shall accompany the application for closure. The requirements of such a risk report are contained in Regulation 60 of the MPRDA.
The decommissioning phase and closure of the quarry will involve removal of all debris and rehabilitation of areas not rehabilitated during the operational phases of the project. This will comprise the scarification of compacted areas, reshaping of areas, topsoiling and regenerating all prepared surfaces. The crusher and screening plants will be dissembled and all other infrastructural development such as haulage roads and stock pile areas will be rehabilitated.
Mine closure upon completion of the mining operation needs to be conducted in accordance to the objectives outlined in this report. The recommendations outlined in this report regarding precision blasting of quarry sides, topsoil replacement and re-vegetation all need to be complied with before mine closure can be considered.
The stages for rehabilitation, which need to be adhered to in order to meet the closure objectives, are as follows:
· Over the lifespan of the borrow pit, rehabilitation should commence initially in areas that are no longer being mined.
· If mining is expanded into the proposed extension, rehabilitation is the adjacent quarry should be commenced at least twelve months before commencement of that phase.
· The same strategy will be applied to future mining phases during the quarries lifespan.
· Upon completion of the final mining phase, final quarry rehabilitation (which will involve the rehabilitation of the areas currently being mined out and the storage and processing areas) will be completed within 12 months of operation closure.
· The proposed closure costs will be absorbed throughout the operation life of the quarry, as rehabilitation towards final closure objectives will be conducted continuously during mining operations.
SCHEDULE OF FINES FOR ENVIRONMENTAL DAMAGE OR EMP TRANSGRESSIONS (Based on City of Cape Town: Standard Environmental Specifications (03/2002)
Note: The maximum fine for any environmental damage will never be less than the cost of applicable environmental rehabilitation. |
||
CEMP TRANSGRESSION OR RESULTANT ENVIRONMENTAL DAMAGE |
MIN. FEE |
MAX. FEE |
Failure to report environmental damage or CEMP transgressions to the ECO or RE. |
R1000 |
R2000 |
Failure to carry out instructions of the ECO or RE regarding the environment or the CEMP |
R2000 |
R4000 |
Failure to comply with prescriptions for supervision for loading and off-loading of delivery vehicles |
R500 |
R1000 |
Failure to comply with prescriptions for securing of loads to ensure safe passage of delivery vehicles |
R500 |
R1000 |
Failure to comply with prescriptions for the storage of imported materials within a designated contractors yard |
R500 |
R1000 |
Failure to comply with prescribed administration, storage or handling of hazardous substances |
R500 |
R1000 |
Failure to comply with fuel storage, refuelling, or clean-up prescriptions |
R500 |
R1000 |
Failure to comply with prescriptions for the use of ablution facilities |
R500 |
R1000 |
Failure to comply with prescriptions for the use of designated eating areas, heating sources for cooking or presence of fire extinguishers |
R500 |
R1000 |
Failure to comply with prescriptions regarding water provision |
R500 |
R1000 |
Failure to comply with prescriptions regarding fire control |
R500 |
R1000 |
Failure to comply with prescriptions for solid waste management (incl. paint chips, cement and concrete) |
R500 |
R1000 |
Failure to comply with prescriptions to prevent water pollution |
R500 |
R1000 |
Failure to comply with prescriptions regarding workshop equipment maintenance and storage |
R500 |
R1000 |
Failure to comply with prescriptions regarding noise levels of construction activities |
R500 |
R1000 |
Failure to comply with prescriptions regarding working hours |
R500 |
R1000 |
Failure to comply with prescriptions regarding lighting and aesthetics |
R500 |
R1000 |
Failure to comply with prescriptions regarding silt, debris and other obstruction removal |
R500 |
R1000 |
Failure to comply with prescriptions regarding water diversion and drainage |
R500 |
R1000 |
Failure to comply with prescriptions regarding erosion and scour protection |
R500 |
R1000 |
Failure to comply with prescriptions traffic accommodation |
R500 |
R1000 |
Failure to comply with prescriptions regarding tree and vegetation removal/damage |
R5000 |
R20000 |
Failure to comply with prescriptions regarding method statements |
R500 |
R5000 |
Failure to comply with prescriptions regarding environmental awareness training |
R500 |
R5000 |
Failure to comply with prescriptions regarding appointment of an Environmental Officer and monitoring of CEMP compliance |
R500 |
R1000 |
Failure to comply with prescriptions regarding site demarcation and erection of fences |
R500 |
R5000 |
Failure to comply with prescriptions regarding control of vehicles and plant on access routes |
R500 |
R1000 |
Failure to comply with prescriptions regarding information posters |
R500 |
R1000 |
Failure to comply with prescriptions regarding procedures for emergencies |
R1000 |
R5000 |
Failure to comply with prescriptions posting of emergency numbers and contacting of the emergency call centre |
R500 |
R5000 |
Failure to comply with prescriptions regarding information boards or a complaints register |
R500 |
R1000 |
Failure to comply with prescriptions regarding protection of natural features |
R500 |
R5000 |
Failure to comply with prescriptions regarding erosion and sedimentation control |
R500 |
R5000 |
For each subsequent similar offence committed by the same individual, the fine shall be doubled in value to a maximum value of R50 000
RE-GRAVELLING OF SECTIONS OF DISTRICT ROADS DR08248, DR08247, DR08041 & DR 8504 IN THE ENGCOBO LOCAL MUNICIPALITY, EASTERN CAPE: PROPOSED BORROW PIT DEVELOPMENT
Contract No. _______________
ENVIRONMENTAL MANAGEMENT PROGRAMME (EMP)
MADE AND ENTERED BETWEEN:
The Eastern Cape Government: Department of Roads and Public Works (DRPW) Herein represented by:_____________________________________________ In his/her capacity as:______________________________________________ Duly authorized hereto Hereafter referred to as “DRPW”
AND
Herein represented by: ______________________________________________ Duly authorized hereto Hereafter referred to as the “THE CONTRACTOR”
The parties record that the Contractor shall bear the following obligations in terms of this Agreement: 1. Comply with all provisions of the EMP; 2. Comply with the requirements of the Mine Health and Safety Act, 1996 (Act No. 29 of 1996); 3. Bind any Sub-Contractors to comply with the EMP to which this agreement is appended; 4. Enforce compliance with the EMP by: · Appointing an Environmental Officer (or Site Agent); and · Ensuring that all staff is familiar with the EMP 5. Protect the environment of the site against environmental damage; 6. To make good any environmental damage; and 7. Failure to comply with the EMP may result in fines and reported non-compliance may result in the suspension of work or termination of the contract.
SIGNATORIES Signed at _________________ on this ________ day of ____________________ 201____ For DRPW
Signature _______________________
Print Name _______________________ (duly authorised) As Witnesses:
Signed at ________________ on this ________day of _____________________ 201____ For CONTRACTOR
Signature _____________________
Print Name _____________________
(duly authorised)
As Witnesses:
|
RE-GRAVELLING OF SECTIONS OF DIVISIONAL DR08248, DR08247, DR08041 & DR 8504 ROADS IN THE ENGCOBO AREA: PROPOSED BORROW PIT DEVELOPMENT
Contract No. ___________
METHOD STATEMENT CONTROL SHEET
MS Number: |
[THIS CONTROL SHEET IS TO BE ATTACHED TO ALL METHOD STATEMENTS]
THIS SECTION TO BE COMPLETED BY CONTRACTOR/METHOD STATEMENT AUTHOR ONLY
TITLE: |
DESCRIPTION: |
SUBMITTED BY: |
DATE REQUESTED BY RE: |
|
DATE SUBMITTED: |
|
DATE RESPONSE REQUIRED BY: |
|
DATE WORK START: |
|
REVIEW SCHEDULE |
||
DATE |
AUTHORITY |
COMMENTS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DISTRIBUTION AND AUTHORISATION |
|||
Name |
RE |
ECO |
CONTRACTOR |
|
|
|
|
Signature |
|
|
|
Date |
|
|
|
CONTRACTOR NOTE: METHOD STATEMENTS SHOULD ADDRESS THE FOLLOWING:
WHAT: Brief description of the work to be undertaken HOW: Detailed description of the process of work, methods and materials WHERE: Description/sketch/map of locality of work (where applicable) WHEN: Due commencement date and completion date estimate (day/night work) |
Table 14: Detailed Summary of overall Impact Assessment of all Borrow Pits
8248/1.3 |
8248/11.2 |
8248/18 |
8247/2.5 |
8247/8.5 |
8247/23.2 |
8247/village |
8247/19.1 |
|||||||||||||||||||||||||||||||||||||||||
Impact |
E |
D |
I |
P |
SB |
SA |
E |
D |
I |
P |
SB |
SA |
E |
D |
I |
P |
SB |
SA |
E |
D |
I |
P |
SB |
SA |
E |
D |
I |
P |
SB |
SA |
E |
D |
I |
P |
SB |
SA |
E |
D |
I |
P |
SB |
SA |
E |
D |
I |
P |
SB |
SA |
Topography |
S |
P |
L |
D |
M |
|
S |
P |
M |
D |
M |
|
S |
P |
L |
P |
M |
|
S |
P |
L |
D |
M |
|
S |
P |
M |
D |
M |
|
S |
P |
L |
D |
M |
L |
S |
P |
H |
D |
M |
L |
S |
P |
M |
D |
M |
L |
Erosion |
S |
S |
M |
H |
M |
|
S |
S |
H |
P |
M |
|
S |
S |
L |
P |
L |
|
S |
S |
M |
H |
M |
|
S |
S |
H |
P |
M |
|
S |
V |
L |
I |
L |
N |
S |
S |
H |
P |
M |
L |
S |
S |
L |
I |
L |
N |
Geology |
S |
S |
L |
D |
L |
|
S |
P |
L |
D |
L |
|
S |
P |
L |
D |
M |
|
S |
P |
L |
D |
L |
|
S |
P |
L |
D |
M |
|
S |
P |
L |
D |
M |
L |
S |
P |
L |
D |
M |
L |
S |
P |
L |
D |
M |
L |
Soils |
S |
S |
L |
D |
L |
|
S |
S |
L |
D |
L |
|
S |
S |
L |
D |
L |
|
S |
S |
L |
D |
L |
|
S |
S |
L |
D |
L |
|
S |
S |
L |
D |
L |
N |
S |
S |
L |
D |
L |
N |
S |
S |
L |
D |
L |
N |
Surface Water |
S |
V |
M |
H |
L |
|
S |
S |
M |
P |
M |
|
S |
S |
L |
P |
L |
|
S |
S |
L |
P |
L |
|
S |
S |
M |
P |
M |
|
S |
S |
L |
P |
L |
N |
S |
S |
H |
P |
M |
L |
S |
S |
M |
P |
M |
L |
Groundwater |
S |
S |
L |
I |
L |
|
S |
S |
M |
P |
M |
|
S |
S |
L |
I |
L |
|
S |
S |
L |
I |
L |
|
S |
S |
L |
I |
L |
|
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
Air quality/Dust |
S |
S |
L |
D |
L |
|
S |
S |
L |
D |
L |
|
S |
S |
L |
D |
L |
|
S |
S |
L |
D |
L |
|
S |
S |
L |
D |
L |
|
S |
S |
L |
D |
L |
N |
S |
S |
L |
D |
L |
N |
S |
S |
L |
D |
L |
N |
Vegetation |
S |
S |
L |
D |
L |
|
S |
S |
L |
D |
L |
|
S |
S |
L |
D |
L |
|
S |
S |
L |
D |
L |
|
S |
S |
M |
P |
M |
|
S |
S |
M |
P |
M |
L |
S |
S |
L |
P |
L |
N |
S |
S |
L |
P |
L |
N |
Fire |
S |
S |
H |
I |
|
|
S |
S |
H |
I |
M |
|
S |
S |
H |
I |
M |
|
S |
S |
H |
I |
M |
|
S |
S |
H |
I |
M |
|
S |
S |
H |
I |
M |
L |
S |
S |
H |
I |
M |
L |
S |
S |
H |
I |
M |
L |
Alien species |
S |
V |
L |
P |
L |
|
S |
V |
L |
P |
L |
|
S |
V |
L |
P |
L |
|
S |
V |
L |
P |
L |
|
S |
V |
L |
P |
L |
|
S |
V |
L |
P |
L |
N |
S |
V |
L |
P |
L |
N |
S |
V |
L |
P |
L |
N |
Habitat |
S |
S |
L |
P |
L |
|
S |
V |
L |
P |
L |
|
S |
V |
L |
P |
L |
|
S |
V |
L |
P |
L |
|
S |
V |
L |
P |
L |
|
S |
V |
L |
P |
L |
N |
S |
V |
L |
P |
L |
N |
S |
V |
L |
P |
L |
N |
Fauna |
S |
V |
L |
I |
L |
|
S |
V |
L |
I |
L |
|
S |
V |
L |
I |
L |
|
S |
V |
L |
I |
L |
|
S |
V |
M |
P |
L |
|
S |
V |
M |
P |
L |
N |
S |
V |
L |
I |
L |
|
S |
V |
L |
I |
L |
N |
Land capability/Agriculture |
S |
S |
L |
I |
L |
|
S |
S |
L |
I |
L |
|
S |
S |
L |
I |
L |
|
S |
S |
L |
I |
L |
|
S |
S |
L |
I |
L |
|
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
M |
P |
M |
L |
Grazing |
S |
S |
L |
I |
L |
|
S |
V |
L |
I |
L |
|
S |
V |
L |
I |
L |
|
S |
S |
L |
I |
L |
|
S |
S |
L |
I |
L |
|
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
M |
P |
M |
L |
Fences |
S |
S |
L |
I |
L |
|
S |
S |
L |
I |
L |
|
S |
S |
L |
I |
L |
|
S |
S |
L |
I |
L |
|
S |
S |
L |
I |
L |
|
S |
S |
L |
H |
L |
N |
S |
S |
L |
I |
L |
N |
S |
V |
M |
P |
L |
N |
Noise |
S |
S |
L |
I |
L |
|
S |
S |
L |
I |
L |
|
S |
S |
L |
I |
L |
|
S |
S |
L |
I |
L |
|
S |
S |
L |
I |
L |
|
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
Over/Under Services |
S |
S |
L |
I |
L |
|
S |
S |
L |
I |
L |
|
S |
S |
L |
I |
L |
|
S |
S |
M |
P |
M |
|
S |
S |
L |
I |
L |
|
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
Visual Impact |
S |
P |
M |
D |
M |
|
S |
P |
M |
D |
M |
|
S |
P |
M |
D |
M |
|
S |
L |
M |
D |
M |
|
L |
P |
M |
H |
M |
|
S |
L |
M |
D |
M |
L |
S |
L |
M |
D |
M |
L |
S |
L |
M |
H |
M |
L |
Waste management |
S |
V |
L |
I |
L |
|
S |
V |
L |
I |
L |
|
S |
V |
L |
I |
L |
|
S |
V |
L |
I |
L |
|
S |
V |
L |
I |
L |
|
S |
V |
L |
I |
L |
N |
S |
V |
L |
I |
L |
|
S |
V |
L |
I |
L |
N |
Socio-Economic Impacts |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||||||||
Archaeology |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||||||||
Heritage |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||||||||
Palaeontology |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||||||||
Buildings |
S |
S |
L |
I |
L |
|
S |
S |
L |
I |
L |
|
S |
S |
L |
I |
L |
|
S |
S |
L |
I |
L |
|
S |
S |
L |
I |
L |
|
S |
S |
L |
I |
L |
N |
S |
S |
M |
I |
M |
L |
S |
S |
L |
I |
L |
N |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||||||
OVERALL |
|
L |
|
L |
|
|
L |
|
L |
|
L |
|
N |
|
L |
|
L |
8041/50.1 |
8041/37.7 |
8041/35.7 |
8041/28.8 |
8041/14.4 |
8041/5.9 |
8504/5.9 |
||||||||||||||||||||||||||||||||||||
Impact |
E |
D |
I |
P |
SB |
SA |
E |
D |
I |
P |
SB |
SA |
E |
D |
I |
P |
SB |
SA |
E |
D |
I |
P |
SB |
SA |
E |
D |
I |
P |
SB |
SA |
E |
D |
I |
P |
SB |
SA |
E |
D |
I |
P |
SB |
SA |
Topography |
S |
P |
M |
D |
M |
L |
S |
S |
M |
D |
M |
L |
S |
P |
M |
D |
M |
L |
S |
P |
M |
D |
M |
L |
S |
L |
M |
D |
M |
L |
S |
P |
M |
D |
M |
L |
S |
P |
L |
D |
M |
L |
Erosion |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
L |
P |
L |
N |
S |
S |
M |
H |
M |
L |
S |
S |
L |
H |
L |
N |
S |
S |
L |
P |
L |
N |
Geology |
S |
P |
L |
D |
M |
L |
S |
P |
L |
D |
M |
L |
S |
P |
L |
D |
M |
L |
S |
P |
L |
D |
M |
L |
S |
P |
L |
D |
M |
L |
S |
P |
L |
D |
M |
L |
S |
P |
L |
D |
M |
L |
Soils |
S |
S |
L |
D |
L |
N |
S |
S |
L |
D |
L |
N |
S |
S |
L |
D |
L |
N |
S |
S |
L |
D |
L |
N |
S |
S |
L |
D |
L |
N |
S |
S |
L |
D |
L |
N |
S |
S |
L |
D |
L |
N |
Surface Water |
S |
S |
L |
P |
L |
N |
S |
S |
M |
P |
M |
L |
S |
S |
L |
I |
L |
N |
S |
M |
L |
H |
M |
L |
S |
S |
L |
P |
L |
N |
S |
S |
L |
H |
L |
N |
S |
S |
L |
P |
L |
N |
Groundwater |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
Air quality/Dust |
S |
S |
L |
D |
L |
N |
S |
S |
L |
D |
L |
N |
S |
S |
L |
D |
L |
N |
S |
S |
L |
D |
L |
N |
S |
S |
L |
D |
L |
N |
S |
S |
L |
D |
L |
N |
S |
S |
L |
D |
L |
N |
Vegetation |
S |
S |
L |
D |
L |
N |
S |
S |
L |
D |
L |
N |
S |
S |
H |
D |
M |
L |
S |
S |
M |
D |
M |
L |
S |
S |
L |
D |
L |
N |
S |
S |
L |
D |
L |
N |
S |
S |
L |
D |
L |
N |
Fire |
S |
S |
H |
I |
M |
L |
S |
S |
H |
I |
M |
L |
S |
S |
H |
I |
M |
L |
S |
S |
H |
I |
M |
L |
S |
S |
H |
I |
M |
L |
S |
S |
H |
I |
M |
L |
S |
S |
H |
I |
M |
L |
Alien species |
S |
V |
L |
P |
L |
N |
S |
V |
L |
P |
L |
N |
S |
V |
L |
P |
L |
N |
S |
V |
L |
P |
L |
N |
S |
V |
L |
P |
L |
N |
S |
V |
L |
P |
L |
N |
S |
V |
L |
P |
L |
N |
Habitat |
S |
V |
L |
P |
L |
N |
S |
V |
L |
P |
L |
N |
S |
V |
H |
P |
M |
L |
S |
V |
L |
P |
L |
N |
S |
V |
L |
P |
L |
N |
S |
V |
L |
P |
L |
N |
S |
V |
L |
P |
L |
N |
Fauna |
S |
V |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
H |
P |
M |
L |
S |
V |
M |
P |
L |
N |
S |
V |
M |
P |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
Land capability/Agriculture |
S |
M |
H |
H |
M |
L |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
L |
P |
L |
N |
Grazing |
S |
L |
M |
I |
M |
L |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
L |
P |
L |
N |
S |
S |
L |
P |
L |
N |
S |
S |
L |
I |
L |
N |
Fences |
S |
V |
M |
P |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
L |
P |
L |
N |
S |
S |
L |
I |
L |
N |
Noise |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
M |
I |
M |
L |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
M |
D |
L |
N |
S |
S |
L |
I |
L |
N |
Over/Under Services |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
V |
M |
I |
L |
N |
S |
S |
M |
I |
M |
L |
S |
S |
L |
I |
L |
N |
Visual Impact |
S |
L |
M |
D |
M |
L |
S |
L |
M |
D |
M |
L |
S |
L |
M |
H |
M |
L |
S |
L |
M |
D |
M |
L |
S |
S |
M |
D |
M |
L |
S |
S |
M |
D |
M |
L |
S |
L |
M |
P |
M |
L |
Waste management |
S |
V |
L |
I |
L |
N |
S |
V |
L |
I |
L |
N |
S |
V |
L |
I |
L |
N |
S |
V |
L |
I |
L |
N |
S |
V |
L |
I |
L |
N |
S |
V |
L |
I |
L |
N |
S |
V |
L |
I |
L |
N |
Socio-Economic Impacts |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||||
Archaeology |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||||
Heritage |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||||
Palaeontology |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||||||||||||||||
Buildings |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
S |
L |
I |
L |
N |
S |
V |
L |
I |
L |
N |
S |
V |
M |
I |
L |
N |
S |
S |
L |
I |
L |
N |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||
OVERALL |
|
L |
|
L |
|
L |
|
L |
|
L |
|
L |
|
L |
Scientific Name |
Family |
Conservation Status |
Flora |
||
Barleria obtusa |
ACANTHACEAE |
CR |
Chaetacanthus setiger |
ACANTHACEAE |
Critically Rare |
Crabbea acaulis |
ACANTHACEAE |
DDD |
Crabbea hirsuta |
ACANTHACEAE |
DDD |
Hypoestes aristata var. aristata |
ACANTHACEAE |
DDT |
Justicia bolusii |
ACANTHACEAE |
DDT |
Thunbergia capensis |
ACANTHACEAE |
DDT |
Thunbergia dregeana |
ACANTHACEAE |
DDT |
Aizoon rigidum |
AIZOACEAE |
Declining |
Ceratiosicyos laevis |
ACHARIACEAE |
Declining |
Guthriea capensis |
ACHARIACEAE |
Declining |
Kiggelaria africana |
ACHARIACEAE |
Declining |
Tulbaghia acutiloba |
ALLIACEAE |
Declining |
Tulbaghia galpinii |
ALLIACEAE |
Declining |
Obetia tenax |
URTICACEAE |
NT |
Albuca setosa |
HYACINTHACEAE |
PNCO |
Aloe arborescens |
ASPHODELACEAE |
PNCO |
Aloe ecklonis |
ASPHODELACEAE |
PNCO |
Aloe ferox |
ASPHODELACEAE |
PNCO |
Aloe maculata |
ASPHODELACEAE |
PNCO |
Aloe pratensis |
ASPHODELACEAE |
PNCO |
Angraecum sacciferum |
ORCHIDACEAE |
PNCO |
Aristea abyssinica |
IRIDACEAE |
PNCO |
Aristea anceps |
IRIDACEAE |
PNCO |
Asparagus aethiopicus |
ASPARAGACEAE |
PNCO |
Asparagus concinnus |
ASPARAGACEAE |
PNCO |
Asparagus denudatus |
ASPARAGACEAE |
PNCO |
Asparagus falcatus |
ASPARAGACEAE |
PNCO |
Asparagus ramosissimus |
ASPARAGACEAE |
PNCO |
Asparagus virgatus |
ASPARAGACEAE |
PNCO |
Bergeranthus multiceps |
MESEMBRYANTHEMACEAE |
PNCO |
Boophone disticha |
AMARYLLIDACEAE |
PNCO |
Brownleea coerulea |
ORCHIDACEAE |
PNCO |
Brownleea parviflora |
ORCHIDACEAE |
PNCO |
Brownleea recurvata |
ORCHIDACEAE |
PNCO |
Brunsvigia bosmaniae |
AMARYLLIDACEAE |
PNCO |
Brunsvigia grandiflora |
AMARYLLIDACEAE |
PNCO |
Brunsvigia radulosa |
AMARYLLIDACEAE |
PNCO |
Bulbine abyssinica |
ASPHODELACEAE |
PNCO |
Bulbine asphodeloides |
ASPHODELACEAE |
PNCO |
Bulbine favosa |
ASPHODELACEAE |
PNCO |
Bulbine narcissifolia |
ASPHODELACEAE |
PNCO |
Crocosmia masoniorum |
IRIDACEAE |
PNCO |
Cyrtanthus brachyscyphus |
AMARYLLIDACEAE |
PNCO |
Cyrtanthus flanaganii |
AMARYLLIDACEAE |
PNCO |
Cyrtanthus mackenii subsp. cooperi |
AMARYLLIDACEAE |
PNCO |
Cyrtanthus macowanii |
AMARYLLIDACEAE |
PNCO |
Cyrtanthus tuckii var. viridilobus |
AMARYLLIDACEAE |
PNCO |
Delosperma katbergense |
MESEMBRYANTHEMACEAE |
PNCO |
Delosperma mahonii |
MESEMBRYANTHEMACEAE |
PNCO |
Delosperma repens |
MESEMBRYANTHEMACEAE |
PNCO |
Dierama atrum |
IRIDACEAE |
PNCO |
Dierama dissimile |
IRIDACEAE |
PNCO |
Dierama reynoldsii |
IRIDACEAE |
PNCO |
Dierama robustum |
IRIDACEAE |
PNCO |
Dietes iridioides |
IRIDACEAE |
PNCO |
Disa cephalotes subsp. cephalotes |
ORCHIDACEAE |
PNCO |
Disa oreophila subsp. oreophila |
ORCHIDACEAE |
PNCO |
Disa patula var. transvaalensis |
ORCHIDACEAE |
PNCO |
Disa stachyoides |
ORCHIDACEAE |
PNCO |
Disa versicolor |
ORCHIDACEAE |
PNCO |
Disperis cardiophora |
ORCHIDACEAE |
PNCO |
Disperis fanniniae |
ORCHIDACEAE |
PNCO |
Disperis lindleyana |
ORCHIDACEAE |
PNCO |
Disperis oxyglossa |
ORCHIDACEAE |
PNCO |
Disperis renibractea |
ORCHIDACEAE |
PNCO |
Disperis stenoplectron |
ORCHIDACEAE |
PNCO |
Disperis wealei |
ORCHIDACEAE |
PNCO |
Drimia macrocentra |
HYACINTHACEAE |
PNCO |
Erica caespitosa |
ERICACEAE |
PNCO |
Erica caffra var. auricularis |
ERICACEAE |
PNCO |
Erica caffrorum var. caffrorum |
ERICACEAE |
PNCO |
Erica cooperi var. missionis |
ERICACEAE |
PNCO |
Erica leucopelta var. leucopelta |
ERICACEAE |
PNCO |
Erica leucopelta var. pubescens |
ERICACEAE |
PNCO |
Erica natalitia var. natalitia |
ERICACEAE |
PNCO |
Erica reenensis |
ERICACEAE |
PNCO |
Erica schlechteri |
ERICACEAE |
PNCO |
Erica woodii var. woodii |
ERICACEAE |
PNCO |
Eulophia foliosa |
ORCHIDACEAE |
PNCO |
Freesia laxa subsp. laxa |
IRIDACEAE |
PNCO |
Galtonia candicans |
HYACINTHACEAE |
PNCO |
Gasteria excelsa |
ASPHODELACEAE |
PNCO |
Gladiolus crassifolius |
IRIDACEAE |
PNCO |
Gladiolus inandensis |
IRIDACEAE |
PNCO |
Gladiolus longicollis subsp. longicollis |
IRIDACEAE |
PNCO |
Gladiolus mortonius |
IRIDACEAE |
PNCO |
Gladiolus wilsonii |
IRIDACEAE |
PNCO |
Habenaria arenaria |
ORCHIDACEAE |
PNCO |
Habenaria clavata |
ORCHIDACEAE |
PNCO |
Habenaria tridens |
ORCHIDACEAE |
PNCO |
Haemanthus humilis subsp. humilis |
AMARYLLIDACEAE |
PNCO |
Hesperantha baurii subsp. baurii |
IRIDACEAE |
PNCO |
Hesperantha coccinea |
IRIDACEAE |
PNCO |
Hesperantha grandiflora |
IRIDACEAE |
PNCO |
Hesperantha radiata |
IRIDACEAE |
PNCO |
Holothrix scopularia |
ORCHIDACEAE |
PNCO |
Hypoxis acuminata |
HYPOXIDACEAE |
PNCO |
Hypoxis angustifolia var. buchananii |
HYPOXIDACEAE |
PNCO |
Hypoxis argentea var. argentea |
HYPOXIDACEAE |
PNCO |
Hypoxis iridifolia |
HYPOXIDACEAE |
PNCO |
Hypoxis multiceps |
HYPOXIDACEAE |
PNCO |
Hypoxis rigidula var. pilosissima |
HYPOXIDACEAE |
PNCO |
Kniphofia baurii |
ASPHODELACEAE |
PNCO |
Kniphofia parviflora |
ASPHODELACEAE |
PNCO |
Kniphofia uvaria |
ASPHODELACEAE |
PNCO |
Ledebouria cooperi |
HYACINTHACEAE |
PNCO |
Ledebouria ovatifolia |
HYACINTHACEAE |
PNCO |
Ledebouria revoluta |
HYACINTHACEAE |
PNCO |
Massonia jasminiflora |
HYACINTHACEAE |
PNCO |
Mimusops obovata |
SAPOTACEAE |
PNCO |
Moraea albicuspa |
IRIDACEAE |
PNCO |
Moraea inclinata |
IRIDACEAE |
PNCO |
Moraea pallida |
IRIDACEAE |
PNCO |
Neobolusia tysonii |
ORCHIDACEAE |
PNCO |
Nerine appendiculata |
AMARYLLIDACEAE |
PNCO |
Nerine bowdenii |
AMARYLLIDACEAE |
PNCO |
Nerine gibsonii |
AMARYLLIDACEAE |
PNCO |
Nerine undulata |
AMARYLLIDACEAE |
PNCO |
Ornithogalum conicum subsp. conicum |
HYACINTHACEAE |
PNCO |
Ornithogalum fimbrimarginatum |
HYACINTHACEAE |
PNCO |
Ornithogalum graminifolium |
HYACINTHACEAE |
PNCO |
Ornithogalum longibracteatum |
HYACINTHACEAE |
PNCO |
Ornithogalum tenuifolium subsp. tenuifolium |
HYACINTHACEAE |
PNCO |
Pittosporum viridiflorum |
PITTOSPORACEAE |
PNCO |
Podocarpus falcatus |
PODOCARPACEAE |
PNCO |
Podocarpus latifolius |
PODOCARPACEAE |
PNCO |
Protea caffra subsp. caffra |
PROTEACEAE |
PNCO |
Protea roupelliae subsp. hamiltonii |
PROTEACEAE |
PNCO |
Protea roupelliae subsp. roupelliae |
PROTEACEAE |
PNCO |
Protea simplex |
PROTEACEAE |
PNCO |
Protea subvestita |
PROTEACEAE |
PNCO |
Pterygodium hastatum |
ORCHIDACEAE |
PNCO |
Pterygodium leucanthum |
ORCHIDACEAE |
PNCO |
Pterygodium magnum |
ORCHIDACEAE |
PNCO |
Ruschia putterillii |
MESEMBRYANTHEMACEAE |
PNCO |
Satyrium longicauda var. jacottetianum |
ORCHIDACEAE |
PNCO |
Satyrium longicauda var. longicauda |
ORCHIDACEAE |
PNCO |
Satyrium parviflorum |
ORCHIDACEAE |
PNCO |
Satyrium trinerve |
ORCHIDACEAE |
PNCO |
Scadoxus puniceus |
AMARYLLIDACEAE |
PNCO |
Schizocarphus nervosus |
HYACINTHACEAE |
PNCO |
Schizochilus zeyheri |
ORCHIDACEAE |
PNCO |
Sideroxylon inerme subsp. inerme |
SAPOTACEAE |
PNCO |
Trachyandra affinis |
ASPHODELACEAE |
PNCO |
Tritonia drakensbergensis |
IRIDACEAE |
PNCO |
Tritonia gladiolaris |
IRIDACEAE |
PNCO |
Watsonia confusa |
IRIDACEAE |
PNCO |
Watsonia densiflora |
IRIDACEAE |
PNCO |
Watsonia gladioloides |
IRIDACEAE |
PNCO |
Watsonia pillansii |
IRIDACEAE |
PNCO |
Lantana rugosa |
VERBENACEAE |
Rare |
Lippia javanica |
VERBENACEAE |
Rare |
Valeriana capensis var. capensis |
VALERIANACEAE |
Rare |
Cyphostemma cirrhosum subsp. cirrhosum |
VITACEAE |
VU |
Hybanthus capensis |
VIOLACEAE |
VU |
Rhoicissus revoilii |
VITACEAE |
VU |
Tribulus terrestris |
ZYGOPHYLLACEAE |
VU |
Viscum obscurum |
VISCACEAE |
VU |
Xyris capensis |
XYRIDACEAE |
VU |
Scientific Name |
Family |
Common name |
Status |
Endemic |
Mammals |
||||
Cercopithecus aethiops subsp. pygerythrus |
CERCOPITHECIDAE |
Vervet Monkey |
LC |
|
Elephantulus rupestris |
MACROSCELIDIDAE |
Smith's Rock Elephant Shrew |
LC |
|
Galerella pulverulenta |
HERPESTIDAE |
Small Grey Mongoose |
LC |
|
Hystrix africaeaustralis |
HYSTRICIDAE |
Porcupine |
LC |
|
Lepus saxatilis |
LEPORIDAE |
Scrub / Savannah Hare |
LC |
|
Myotis tricolor |
VESPERTILIONIDAE |
Temminck's Hairy Bat |
Near Threatened |
|
Papio ursinus |
CERCOPITHECIDAE |
Chacma Baboon |
LC |
|
Procavia capensis |
PROCAVIDAE |
Rock Hyrax |
LC |
|
Redunca fulvorufula |
BOVIDAE |
Mountain Reedbuck |
LC |
|
Rhabdomys pumilio |
MURIDAE |
Striped Mouse |
LC |
|
Saccostomus campestris |
MURIDAE |
Pouched Mouse |
LC |
|
Tadarida aegyptiaca |
MOLOSSIDAE |
Egyptian Free-tailed Bat |
LC |
|
Taurotragus oryx |
BOVIDAE |
Eland |
LC |
|
Reptiles |
||||
Agama atra |
AGAMIDAE |
Southern Rock Agama |
LC |
|
Aparallactus capensis |
ATRACTASPIDIDAE |
Black-headed Centipede-eater |
LC |
|
Homoroselaps lacteus |
ATRACTASPIDIDAE |
Spotted Harlequin Snake |
LC |
Yes |
Bradypodion ventrale |
CHAMAELEONIDAE |
Eastern Cape Dwarf Chameleon |
LC |
Yes |
Amplorhinus multimaculatus |
COLUBRIDAE |
Many-spotted Snake |
LC |
|
Boaedon capensis |
COLUBRIDAE |
Brown House Snake |
LC |
|
Crotaphopeltis hotamboeia |
COLUBRIDAE |
Red-lipped Snake |
LC |
|
Dasypeltis scabra |
COLUBRIDAE |
Rhombic Egg-eater |
LC |
|
Duberria lutrix subsp. lutrix |
COLUBRIDAE |
South African Slug-eater |
LC |
Yes |
Lamprophis aurora |
COLUBRIDAE |
Aurora House Snake |
LC |
Yes |
Lamprophis guttatus |
COLUBRIDAE |
Spotted House Snake |
LC |
|
Lycodonomorphus laevissimus |
COLUBRIDAE |
Dusky-bellied Water Snake |
LC |
Yes |
Lycodonomorphus rufulus |
COLUBRIDAE |
Brown Water Snake |
LC |
|
Philothamnus semivariegatus |
COLUBRIDAE |
Spotted Bush Snake |
LC |
|
Psammophis crucifer |
COLUBRIDAE |
Cross-marked Grass Snake |
LC |
|
Psammophylax rhombeatus subsp. rhombeatus |
COLUBRIDAE |
Spotted Grass Snake |
LC |
|
Pseudaspis cana |
COLUBRIDAE |
Mole Snake |
LC |
|
Chamaesaura aenea |
CORDYLIDAE |
Coppery Grass Lizard |
LC |
Yes |
Cordylus cordylus |
CORDYLIDAE |
Cape Girdled Lizard |
LC |
Yes |
Pseudocordylus melanotus subsp. subviridis |
CORDYLIDAE |
Drakensberg Crag Lizard |
LC |
Yes |
Pseudocordylus microlepidotus subsp. fasciatus |
CORDYLIDAE |
Karoo Crag Lizard |
LC |
Yes |
Pseudocordylus microlepidotus |
CORDYLIDAE |
Cape Crag Lizard |
|
|
Hemachatus haemachatus |
ELAPIDAE |
Rinkhals |
LC |
|
Naja nivea |
ELAPIDAE |
Cape Cobra |
LC |
|
Afroedura halli |
GEKKONIDAE |
Hall's Flat Gecko |
LC |
Yes |
Afroedura tembulica |
GEKKONIDAE |
Tembu Flat Gecko |
LC |
Yes |
Pachydactylus maculatus |
GEKKONIDAE |
Spotted Gecko |
LC |
|
Pachydactylus mariquensis |
GEKKONIDAE |
Marico Gecko |
LC |
Yes |
Pachydactylus oculatus |
GEKKONIDAE |
Golden Spotted Gecko |
LC |
Yes |
Nucras lalandii |
LACERTIDAE |
Delalande's Sandveld Lizard |
LC |
Yes |
Pedioplanis burchelli |
LACERTIDAE |
Burchell's Sand Lizard |
LC |
Yes |
Pedioplanis lineoocellata subsp. lineoocellata |
LACERTIDAE |
Spotted Sand Lizard |
LC |
|
Pedioplanis lineoocellata subsp. pulchella |
LACERTIDAE |
Common Sand Lizard |
LC |
|
Pedioplanis namaquensis |
LACERTIDAE |
Namaqua Sand Lizard |
LC |
|
Leptotyphlops nigricans |
LEPTOTYPHLOPIDAE |
Black Thread Snake |
LC |
Yes |
Leptotyphlops scutifrons subsp. conjunctus |
LEPTOTYPHLOPIDAE |
Eastern Thread Snake |
|
|
Pelomedusa subrufa |
PELOMEDUSIDAE |
Marsh Terrapin |
LC |
|
Acontias gracilicauda |
SCINCIDAE |
Thin-tailed Legless Skink |
LC |
Yes |
Trachylepis capensis |
SCINCIDAE |
Cape Skink |
LC |
|
Trachylepis homalocephala |
SCINCIDAE |
Red-sided Skink |
LC |
Yes |
Trachylepis punctatissima |
SCINCIDAE |
Speckled Rock Skink |
LC |
|
Trachylepis varia |
SCINCIDAE |
Variable Skink |
LC |
|
Homopus femoralis |
TESTUDINIDAE |
Greater Padloper |
LC |
Yes |
Stigmochelys pardalis |
TESTUDINIDAE |
Leopard Tortoise |
LC |
|
Rhinotyphlops lalandei |
TYPHLOPIDAE |
Delalande's Beaked Blind Snake |
LC |
|
Varanus niloticus |
VARANIDAE |
Water Monitor |
LC |
|
Bitis arietans subsp. arietans |
VIPERIDAE |
Puff Adder |
LC |
|
Causus rhombeatus |
VIPERIDAE |
Rhombic Night Adder |
LC |
|
Amphibians |
||||
Amietophrynus rangeri |
BUFONIDAE |
Raucous Toad |
LC |
|
Vandijkophrynus gariepensis |
BUFONIDAE |
Karoo Toad |
LC |
|
Kassina senegalensis |
HYPEROLIIDAE |
Bubbling Kassina |
LC |
|
Semnodactylus wealii |
HYPEROLIIDAE |
Rattling Frog |
LC |
|
Phrynobatrachus natalensis |
PHRYNOBATRACHIDAE |
Snoring Puddle Frog |
LC |
|
Xenopus laevis |
PIPIDAE |
Common Platanna |
LC |
|
Ptychadena porosissima |
PTYCHADENIDAE |
Striped Grass Frog |
LC |
|
Amietia angolensis |
PYXICEPHALIDAE |
Common or Angola River Frog |
LC |
|
Amietia fuscigula |
PYXICEPHALIDAE |
Cape River Frog |
LC |
|
Cacosternum boettgeri |
PYXICEPHALIDAE |
Common Caco |
LC |
|
Cacosternum nanum |
PYXICEPHALIDAE |
Bronze Caco |
LC |
|
Pyxicephalus adspersus |
PYXICEPHALIDAE |
Giant Bull Frog |
NT |
|
Strongylopus fasciatus |
PYXICEPHALIDAE |
Striped Stream Frog |
LC |
|
Strongylopus grayii |
PYXICEPHALIDAE |
Clicking Stream Frog |
LC |
|
Tomopterna natalensis |
PYXICEPHALIDAE |
Natal Sand Frog |
LC |
|
Tomopterna tandyi |
PYXICEPHALIDAE |
Tandy's Sand Frog |
LC |
|
Invertebrates |
||||
Aslauga australis (Butterfly) |
LYCAENIDAE |
Southern Purple |
Data Deficient |
Yes |
Chrysoritis lyncurium (Butterfly) |
LYCAENIDAE |
Tsomo River Opal |
Vulnerable |
Yes |
Chrysoritis penningtoni (Butterfly) |
LYCAENIDAE |
Pennington's Opal |
Vulnerable |
Yes |
Fish |
||||
Clarias gariepinus |
CLARIIDAE |
NEMBA (NL) [3126] |
· Acocks, J. P. H. 1988. Veld Types of South Africa. Memoirs of the Botanical Survey of South Africa, No 57. Botanical Research Institute, Department of Agriculture and Water Supply, South Africa.
· Atlas and Red List of the Reptiles of South Africa, Lesotho and Swaziland. 2014. Edited by Michael F. Bates, William R. Branch, Aaron M. Bauer, Marius Burger, Johan Marais, Graham J. Alexander & Marienne S. de Villiers. SANBI, Pretoria.
· Barnes, K. N. (Ed.) 2000. The Eskom Red Data Book of Birds of South Africa, Lesotho and Swaziland.
· Batten, H., and Bokelmann, H. 2001. Eastern Cape: South African Wild Flower Guide 11. The Botanical Society of South Africa. pp 306.
· Branch, W. R. (Ed.) 1988. South African Red Data Book - Reptiles and Amphibians. South African National Scientific Programmes Report No 151.
· Brink A. B. A. 1985. Engineering Geology of Southern Africa, Vol. 4. Building Publications, Pretoria.
· Bromilow, C. 2001. Problem Plants of South Africa. A Guide to the Identification and Control of More than 300 Invasive Plants and Other Weeds. Briza Publications. pp 258
· Bruton, M. N., and Gess, F. W. 1988. Towards and Environmental Plan for the Eastern Cape. Conference proceedings from Rhodes University. Grocott and Sherry, Grahamstown.
· Friedmann, Y (Ed.) 2004. Red Data Book of the Mammals of South Africa: A Conservation Assessment. Endangered Wildlife Trust.
· Friedmann, Y. & Daly, B. 2004. Red data book of the mammals of South Africa, a conservation assessment. Johannesburg, Endangered Wildlife Trust.
· Fuggle, R. F. and Rabie, M. A. 2003. Environmental Management in South Africa. Juta & Co, Johannesburg.
· Gledhill, E. 1981. Veldblomme van Oos-Kaapland. The Department of Nature and Environmental Conservation of the Cape Province Administration. Galvin and Sales, Cape Town.
· Golding, J. (Ed.) 2002. Southern African Plant Red Data Lists. Southern African Botanical Diversity Network Report No 14.
· Henderson, L. 2001. Alien Weeds and Invasive Plants. Plant Protection Research Institute Handbook No 12. Agricultural Research Council. pp 300.
· Hilton-Taylor, C. 1996. Red Data List of Southern African Plants. National Botanical Institute..
· Köpke, D. 1988. The Climate of the Eastern Cape. In: Bruton, M. N., and Gess, F. W. (Eds). Towards and Environmental Plan for the Eastern Cape. Conference proceedings from Rhodes University. Grocott and Sherry, Grahamstown.
· Lewis, C. 1995. The Geomorphological Evolution of the Area between Grahamstown and the Indian Ocean. Rhodes University, Grahamstown.
· Low, A. B., and Rebelo, A. 1988. Vegetation of South Africa, Lesotho and Swaziland. A Companion to the Vegetation Map of South Africa, Lesotho and Swaziland. Department of Environmental Affairs and Tourism, Pretoria.
· Maclean, G. L., 1985. Robert’s Birds of Southern Africa. Trustees of the John Voelcker Bird Book Fund. Cape Town.
· Minter LR, Burger M, Harrison JA, Braack HH, Bishop PJ & Kloepfer D (eds). 2004. Atlas and Red Data book of the frogs of South Africa, Lesotho and Swaziland. SI/MAB Series no. 9. Smithsonian Institution, Washington, D.C.
· Pienaar, K. 2000. The South African What Flower is That? Struik Publishers (Pty) Ltd. Cape Town.
· Pierce, S. M. 2003. The STEP Handbook. Integrating the natural environment into land use decisions at the municipal level: towards sustainable development. Terrestrial Ecological Research Unit Report No 47. University of Port Elizabeth, South Africa.
· Schulze, B. R. 1947. Classification of Climates of Southern Africa after Koppen and Thornwaite. S. Afr. geog. J. 29:32-42.
· Sinclair, I., and Hockey, P. 1996. Sasol : The Larger Illustrated Guide to Birds of Southern Africa. Struik. Cape Town.
· Smithers, R. H. N., 1986. South African Red Data Book. Terrestrial Mammals. South African National Scientific Programmes Report No. 125 Council for Scientific and Industrial Research. Pretoria.
· Soil Classification Working Group (SCWG), 1991. Soil Classification, A Taxonomic System for South Africa. Memoirs on the Agricultural Natural Resources of South Africa, No 15. Department of Agricultural Development, Pretoria.
· Stirton, C. H. 1987. Plant Invaders : Beautiful, but Dangerous. The Department of Nature and Environmental Conservation of the Cape Province Administration. Galvin and Sales, Cape Town.
· Toerien, D. K. and Hill, R. S. 1989. The Geology of the Port Elizabeth Area. Geological Survey explanation of sheet3324 Port Elizabeth
· Van Rensburg, P. W. J. 1970. Planning Open Pit Mines. Proceedings of the symposium on the theoretical background to the planning of open pit mines with special reference to slope stability. The South African Institute of Mining and Metallurgy. A A Balkema, Cape Town.
· Vanderplank, H. J. 1999. Wildflowers of the Port Elizabeth Area. Gamtoos to Swartkops Rivers (The Coastal Bush and Fynbos Region). Bluecliff Publishing. pp 216.
· Viljoen, M. J. and Reimold, W. U. 1999. An Introduction to South Africa’s Geological and Mining Heritage. Mintek Publishers, South Africa.
· Vlok, J, H, J., Euston-Brown, D.I.W. 2002. The patterns within, and the ecological processes that sustain, the subtropical thicket vegetation in the planning domain for the Subtropical Thicket Ecosystem Planning (STEP) project. TERU Report 40. University of Port Elizabeth.
· Weather Bureau. 1988. Climate of South Africa - Climate statistics up to 1984 (WB40). Government Printer, Pretoria.
· Weinert H. H., 1980. The Natural Road Construction Materials of Southern Africa. Academica, Cape Town.
· Wohlbier, R. H. 1986. Bulk Handling in Open Pit Mines and Quarries. Trans Tech Publications, Germany.